Furthermore, if the cable length exceeds 5m, then it will decrease by up to 10% for each 5m.
(Values at the initial period) 10 - 4.
Intermediate stops heat generated by the valve. 10.
If the product malfunctions, please return the valve as it is. 10 VT307-OMQ0002-B Revision history A Precautions on Design / Selection QZ B Renewal VS 1st printing:QV 4-14-1, Sotokanda, Chiyoda-ku, Tokyo 101-0021 JAPAN Tel: + 81 3 5207 8249 Fax: +81 3 5298 5362 URL http://www.smcworld.com Note: Specifications are subject to change without prior notice and any obligation on the part of the
URL http://www.smcworld.com 4-14-1 Sotokanda, Chiyoda-ku, Tokyo 101-0021, Japan Tel: 03-5207-8271 Fax: 03-5298-5361 2021 SMC Corporation All Rights Reserved 15 -
Light/Surge Voltage Suppressor How to Exchange Solenoid Valve, Pilot Valve Assembly Plug-in type Non plug-in type (VFR5 00) (VFR5 10) Plug-in type, Non plug-in type (VFR5 00 VFR5 10) Light/Surge voltage suppressor is not available for grommet type.
Add 10 g for conduit type, 30g for DIN terminal type, 60 g for conduit terminal type respectively. Refer to Glossary of Terms on page 6 for detail of max. operating pressure differential and max. system pressure. 10 Select an option mark in page 7 by Applicable Fluids Check List for special fluids outside of the standard.
Description Note 1 Rod cover 2 Tube cover 3 Piston 4 Piston rod 5 Bushing 6 Cushion valve 7 Speed controller valve 8 Clevis bushing 9 Hexagon socket head plug Rc1/4 10 Pin 11 Cotter pin 12 Flat washer 13 Cushion seal retainer 14 Wear ring 15 Cushion seal 16 Cushion valve seal 17 Speed controller valve seal 18 Coil scraper 19 Rod seal 20 Piston seal 21 Tube gasket 22 Cushion ring 24 Fig. 10
Function Function Terminal name Terminal name 24 V 1 1 COM+ COM+ 24 V 0 V 2 2 COM COM 0 V Pulse signal 3 3 NP+ NP+ Pulse signal Pulse signal 4 4 NP NP Pulse signal Note 1) Note 1) Pulse signal 5 5 PP+ PP+ Pulse signal Pulse signal 6 6 PP PP Pulse signal Input 7 7 SETUP SETUP Input Input 8 8 RESET RESET Input Input 9 9 SVON SVON Input Input 10 10 CLR CLR Input 11 11 12 12 Load Load 13 Output
22.6 5.75 Vacuum supply port 2-3.3 Mounting hole Vacuum pad connection port 0X: M5 x 0.8 0XY: M6 x 1.0 0X: M5 x 0.8 0XY: M6 x 1.0 Connector type ZSE3-0X-C 7 50.6 Vacuum supply port Vacuum pad connection port 20.5 RESET button DOWN button Pneumatic circuit SET button UP button Lead wire length 600 50 (3000) 10 58 PV 18 10.2 8 6.5 10.25 10 22.6 5.75 Vacuum pad connection port Vacuum supply
Silao-Trejo K.M. 2.5 S/N, Predio San Jose del Duranzo C.P. 36100, Silao, Gto., Mexico TEL: 472-72-2-55-00 FAX: 472-72-2-59-44/2-59-46 FRANCE SMC Pneumatique S.A. 1 Boulevard de Strasbourg, Parc Gustave Eiffel, Bussy Saint Georges, F-77600 Marne La Vallee Cedex 3 France TEL: 01-64-76-10-00 FAX: 01-64-76-10-10 CHILE SMC Pneumatics (Chile) S.A. Av. La Montaa 1,115 km. 16,5 P.
, refer to pages 1829 to 2021.) 113 102 90 79 68 57 45 0UT 34 23 113 12 6 85 77 68 60 51 43 34 IN 26 17 85 MGF 201 181 161 141 121 101 80 0UT 60 40 201 Symbol Specifications 16 8 XA MGZ 151 136 121 106 91 76 60 IN 45 30 151 Change of rod end shape Heat resistant cylinder (10 to 150C) XB6 314 283 251 220 188 157 126 0UT 94 63 314 20 10 MGT XB9 Low speed cylinder (10 to 50 mm/s) 236 212 189
AWM20 AWD20 AWM30 AWD30 AWM40 AWD40 Model Option Bracket assembly Note 1) AW20P-270AS AR20P-260S AR30P-270AS AR30P-260S AR40P-270AS AR40P-260S G46-10-02 G46-2-02 Set nut G36-10-01 G36-2-01 Round type Note 2) Standard 0.02 to 0.2 MPa set Standard 0.02 to 0.2 MPa set Pressure gauge Square embedded type Note 3) GC3-10AS [GC3P-010AS (Pressure gauge cover only)] GC3-2AS [GC3P-010AS (Pressure gauge
AWM20 AWD20 AWM30 AWD30 AWM40 AWD40 Model Option Bracket assembly Note 1) AW20P-270AS AR20P-260S AR30P-270AS AR30P-260S AR40P-270AS AR40P-260S G46-10-02 G46-2-02 Set nut G36-10-01 G36-2-01 Round type Note 2) Standard 0.02 to 0.2 MPa set Standard 0.02 to 0.2 MPa set Pressure gauge Square embedded type Note 3) GC3-10AS [GC3P-010AS (Pressure gauge cover only)] GC3-2AS [GC3P-010AS (Pressure gauge
Checks and Inspection Hose Circulating pump Water quantity 20 to 30 L/min Pressure 0.1 to 0.3MPa 0. 10. 3 2030 L/m i n Fig. 2 ( ) Tank (drum can, etc.) b) Operation procedure when a cooling tower is used 1. If a cooling tower is used, supply the cleaning liquid and circulate it for a certain amount of time. 2.
Construction / Options / Replacement parts 10 6. Bowl assembly specifications 11 to 18 7. Assembly of Optional parts 19 8. Operation and Adjustment 20 to 21 9. Troubleshooting 22 10. Replacement work procedure 23 to 29 1) Element assembly (AFF20) 23 to 24 2) Bowl assembly (AFF20) 25 1) Element assembly (AFF30/AFF40) 26 to 27 2) Bowl assembly (AFF30/AFF40) 28 to 29 11.
Construction / Options / Replacement parts 10 6. Bowl assembly specifications 11 to 18 7. Assembly of Optional parts 19 8. Operation and Adjustment 20 to 21 9. Troubleshooting 22 10. Replacement work procedure 23 to 29 1) Element assembly (AMD20) 23 to 24 2) Bowl assembly (AMD20) 25 1) Element assembly (AMD30/AM40) 26 to 27 2) Bowl assembly (AMD30/AM40) 28 to 29 11.
Specifications 10 4. Product outline 10 5. Troubleshooting 11 6. Construction and parts 1112 1 - Safety Instructions These safety instructions are intended to prevent hazardous situations and/or equipment damage. These instructions indicate the level of potential hazard with the labels of Caution, Warning or Danger.
As a guide, insert bolts in 2 locations for 2-5 stations, 3 locations for 6-10 stations, 4 locations for 11-15 stations, and 5 locations for 16-20 stations. 2. When using the manifold with DIN rail in an environment where any vibration or impact is applied to it, the DIN rail itself may be broken.
JIS symbol 2 port valve 3 port valve 10 4. Construction (2) VHK2A(R) VHK3A(R) (9) (4) (1) (5) (3) (11) (10) (7) (8) (6) No.