n = 4, 8, 12, 16, 100 + 50 n = 4, 8, 12, 16, 110 + 50 n = 4, 8, 12, 16, 75 + 50 (n 2) n = 2, 3, 4, 90 + 50 (n 2) n = 2, 4, 6, 8, 100 + 50 (n 2) n = 2, 4, 6, 8, 110 + 50 (n 2) n = 2, 4, 6, 8, 15 + 50 n = 2, 4, 6, 8, Different sides MNB Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258
71 87 110 136 64 72 90 100 126 150 79 90 110 120 153 178 50 55 70 80 100 120 32 40 50 63 80 100 Rod boot (gaiter) e max f I h Bore (mm) Hub 101-150 Hub 51-100 Hub 1-50 Hub 151-200 Hub 201-300 Hub 101-150 Hub 51-100 Hub 1-50 Hub 151-200 Hub 201-300 42 43 52 52 58 65 23 23 25 25 29 29 12.5 12.5 12.5 12.5 12.5 12.5 25 25 25 25 25 25 37.5 37.5 37.5 37.5 37.5 37.5 50 50 50 50 50 50 75 75 75 75
to 500 Up to 600 Up to 600 Up to 800 Up to 800 10 14 18 18 22 26 M14 x 1.5 10.5 M18 x 1.5 M18 x 1.5 12 14 15 11.5 17 M22 x 1.5 M26 x 1.5 With Rod Boot 151 to 200 l 151 to 200 h Bore size (mm) e f 1 to 50 25 25 25 25 25 25 51 to 100 37.5 37.5 37.5 37.5 37.5 37.5 101 to 150 50 50 50 50 50 50 201 to 300 100 100 100 100 100 100 301 to 400 125 125 125 125 125 125 401 to 500 150 150 150 150
to 500 Up to 600 Up to 600 Up to 800 Up to 800 10 14 18 18 22 26 M14 x 1.5 10.5 M18 x 1.5 M18 x 1.5 12 14 15 11.5 17 M22 x 1.5 M26 x 1.5 With Rod Boot 151 to 200 l 151 to 200 h Bore size (mm) e f 1 to 50 25 25 25 25 25 25 51 to 100 37.5 37.5 37.5 37.5 37.5 37.5 101 to 150 50 50 50 50 50 50 201 to 300 100 100 100 100 100 100 301 to 400 125 125 125 125 125 125 401 to 500 150 150 150 150
surfaces (n = 2, 4, 6, 8, ) Note 1) 20 + 50 (n 2) 2 (n = 4, 8, 12, 16, ) Note 2) 90 + 50 (n 4) 2 100 + 50 (n 4) 2 (n = 4, 8, 12, 16, ) Note 2) 110 + 50 (n 4) 2 (n = 4, 8, 12, 16, ) Note 2) D-B59W n Same surface 75 + 50 (n 2) (n = 2, 3, 4, ) 90 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 100 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 110 + 50 (n 2) (n = 2, 4, 6, 8, ) Note 1) 1 15 90 100 110
MGP Piston speed 50 to 700 mm/s 50 to 1000 mm/s Rubber bumper Basic cylinder MGQ Cushion Built-in shock absorbers (2 pcs.)
25 25 25 25 25 25 51 to 100 37.5 37.5 37.5 37.5 37.5 37.5 101 to 150 50 50 50 50 50 50 201 to 300 100 100 100 100 100 100 301 to 400 125 125 125 125 125 125 401 to 500 150 150 150 150 501 to 600 175 175 601 to 700 200 200 701 to 800 73 81 89 89 101 101 1 to 50 86 94 102 102 114 114 51 to 100 98 106 114 114 126 126 101 to 150 111 119 127 127 139 139 201 to 300 161 169 177 177 189 189 301
32, 40, 50, 63, 80 and 100.) 8-21-18 18 Guide Cylinder Series MGG Construction 20 to 50/MGG #8 !
Model C D 25 30 35 40 45 50 25 30 35 40 45 50 25 30 35 40 45 50 55 60 65 70 30 35 40 45 50 55 60 65 70 75 C' D' 30 35 40 45 50 55 30 35 40 45 50 55 30 35 40 45 50 55 60 65 70 75 35 40 45 50 55 60 65 70 75 80 Mounting bolt Mounting bolt CQSKB12-5D -10D -15D -20D -25D -30D CQSKB16-5D -10D -15D -20D -25D -30D CQSKB20-5D -10D -15D -20D -25D -30D -35D -40D -45D -50D CQSKB25-5D -10D -15D -20D -
-XC7: Reverse Mounting of Rotation Shaft (Size: 50 to 100) . -XC8 to -XC11: Change of Rotation Range (Size: 50 to 100) . -XC30 Fluoro Grease (Size: 30 to 100) . -XC31 to -XC36: Change of Rotation Range and Rotation Direction of Shaft . -XC37 to -XC42: Change of Rotation Range and Angle Adjusting Direction. -XC43 to -XC46: Change of Rotation Range and Angle Adjusting Direction.
701 to 800 801 to 900 901 to 1000 801 to 900 1 to 50 51 to 100 101 to 150 151 to 200 201 to 300 301 to 400 401 to 500 501 to 600 601 to 700 701 to 800 32 40 50 63 80 100 73 37.5 50 75 100 125 86 98 111 136 161 186 36 23 12.5 25 81 37.5 50 75 100 125 94 106 119 144 169 194 41 23 12.5 25 89 37.5 50 75 100 125 102 114 127 152 177 202 51 25 12.5 25 150 227 89 37.5 50 75 100 125 102 114 127 152
for 25 and 32, 55% for 40 and 60% or less for 50, respectively.)
for full strokes 25, 50 and 75.
for 32, 55% for 40 and 60% or less for 50, respectively.)
A Graph 1 Graph 2 120 60 110 B 100 50 C P1 63 63 90 80 40 70 Regulator Circuit C Load weight (kg) Load weight (kg) P2 60 30 50 50 A 50 Regulator valve 40 20 40 40 30 B 32 32 20 10 C P1 10 0 0 0.4 0.3 0.3 0.5 0.6 0.7 Operating pressure (MPa) 0.4 0.5 0.6 0.7 Operating pressure (MPa) Selection example Confirmation of allowable kinetic energy Selection conditions: Transfer direction: Vertical
+150-XC11 Dual stroke cylinder RZQ-CDQ2 Additional cylinder tube length RZQA300-150 CDQ2A300D Bore Size (mm) A 32 591 37 345.5 382.5 40 606 37 355 392 50 631 41 355.5 396.5 63 631 44.5 357.5 402 A port pressurization at initial (retracted) position.
Operate the cylinder at a load ratio of 50% or less. The lock might not disengage or might become damaged if a load ratio of 50% is exceeded. 5. Do not synchronize multiple cylinders. Do not operate two or more end lock cylinders synchronized to move a single workpiece because one of the cylinder locks may not be able to disengage when required. 6.
40 133 341 364 M30 x 1.5 30.5 1/2 98 45 30 1/ 5 stroke 120 346 75 40 141 367 388 M36 x 1.5 34.5 3/4 106 50 25 The minimum stroke with rod boot is 30 mm or more.
Air Cylinder: Single Rod Series MB 32, 40, 50, 63, 80, 100, 125 How to Order 50 L 32 MB With auto switch MDB M9BW L 32 50 Made to Order For details, refer to page 291.
4 Square Tube Type Air Cylinder: Standard Type Double Acting, Single Rod Series MB1 32, 40, 50, 63, 80, 100 How to Order MB1 L 32 50 Without auto switch MDB1 50 L 32 Y7BW With auto switch Number of auto switches 2 pcs. 1 pc. 3 pcs. n pcs.