Stations: 10 Stations (Note: 2 Stations are Required for Terminal Box Mounting), Port Size: C10 (ø10 One-touch Fitting), Thread: Rc (PT), Kit Name: T (Terminal Box), Box Mounting Position: 0 (U Side Mounting), Control Unit: None, Release Valve Rated Voltage: w/o Air Release Valve, Option 1: SD (Built-in Silencer, Direct Exhaust from D Side), Option 2: W (IP65 Protection Compatible)
Stations: 2 Stations, Port Size: C10 (ø10 One-touch Fitting), Control Unit: None, Release Valve Rated Voltage: w/o Air Release Valve, Option 1: None, Option 2: W (Dust Poof IP65 Rated)
Model: 10 (Side Ported), Connector Type: F (D-sub Connector, IP40, 25 Pins), Connector Entry Direction: 2 (Lateral), Valve Stations: 6 Stations, P,E Port Location: U (U Side, 2 to 10 Stations), SUP/EXH Block: S (Internal Pilot, built-in Silencer), A,B Port Size: C10 (ø10 One-touch Fitting)
Actuation: 1 (2-Position Single), Electrical Entry: LL (L-type Plug Connector w/Cover), Lead Wire Length: 3 (300mm), Manual Override: E (Push-turn Locking Lever Type), A,B Port Size: C10 (ø10 One-touch Fitting, Metric), Thread Type: Rc, Bracket: F1 (w/Foot Bracket, 2-position, Single Only)
Series: 3 (10-SV3000), Base Type: 10FD, Connector Entry Direction: 2 (Lateral), Valve Stations: 03 (3 Stations), P, E Port Location: D (D Side, 2-10 Stations), Pilot Type: Internal Pilot, A, B Port Size: C10 (One-touch Fitting for Ø10)
The VQC series has five standard wiring packages bringing a world of ease to wiring and maintenance work, while the protective enclosures of three of them conform to IP67 standards for protection from dust and moisture. The use of multi-pin connectors to replace wiring inside manifold blocks provides flexibility when adding stations or changing manifold configuration. The VQC series
The VQC series has five standard wiring packages bringing a world of ease to wiring and maintenance work, while the protective enclosures of three of them conform to IP67 standards for protection from dust and moisture. The use of multi-pin connectors to replace wiring inside manifold blocks provides flexibility when adding stations or changing manifold configuration. The VQC series
The VQC series has five standard wiring packages bringing a world of ease to wiring and maintenance work, while the protective enclosures of three of them conform to IP67 standards for protection from dust and moisture. The use of multi-pin connectors to replace wiring inside manifold blocks provides flexibility when adding stations or changing manifold configuration. The VQC series
The VQC series has five standard wiring packages bringing a world of ease to wiring and maintenance work, while the protective enclosures of three of them conform to IP67 standards for protection from dust and moisture. The use of multi-pin connectors to replace wiring inside manifold blocks provides flexibility when adding stations or changing manifold configuration. The VQC series
The VQC series has five standard wiring packages bringing a world of ease to wiring and maintenance work, while the protective enclosures of three of them conform to IP67 standards for protection from dust and moisture. The use of multi-pin connectors to replace wiring inside manifold blocks provides flexibility when adding stations or changing manifold configuration. The VQC series
2 5 4 4 4 1 1 1 1 1 1 21 21 11 9 8 6 3 9 3 3 22 23 25 26 27 28 23 7 5 2 2 5 2 5 35 36 20 12 10 15 16 17 18 19 13 15 10 16 17 4 4 4 34 24 14 2B 1B 2A 3A 1A 3B Main Board PCB2 2/2 1/2 23 22 25 26 27 22 37 38 39 40 32 20 20 21 10 12 13 15 16 15 16 18 24 24 11 14 3 9 8 6 2 7 7 2 5 (CN8) 4 4 1 1 1 5 1 21 11 3 9 8 6 1 23 2 22 25 26 27 1 22 2 2 7 7 6 2 7 5 (CN5) 1 37 2 38 4 39 3 40 32 3 20 2 20
B 2 B 2 B 2 2 B 2 B 2 B 2 B 2 B 2 B 2 B 2 PE R 3 R 3 R 3 R 3 P 1 P 1 P 1 P 1 X A 4 A 4 A 4 4 A 4 A 4 A 4 A 4 A 4 A 4 A 4 2-One-touch fitting (X, PE ports) Applicable tube O.D.: 6 2n-One-touch fitting (A, B ports) Applicable tube O.D.: 4 6 Applicable connector: 26 pin MIL type with strain relief (L4) L3 (conforms to MIL-C-83503) 7.6 Connector case attachment lever (both sides) (3.2) 101.2
2-2 . 2-2 2-2-3 . 2-2 2-2-4 . 2-3 2-2-5 . 2-3 2-3 . 2-5 3 / 3-1 . 3-1 3-2 . 3-1 3-3 . 3-2 3-4 . 3-2 3-5 . 3-2 3-6 . 3-2 4 4-1 . 4-1 4-2 . 4-1 4-2-1 () . 4-1 1 4-2-2 . 4-1 4-2-3 . 4-2 5 5-1 . 5-1 6 6-1 . 6-1 6-2 GWP . 6-2 6-3 . 6-3 6-4 . 6-4 6-5 . 6-7 7 A 7-1 . 7-1 7-2 . 7-1 7-3 . 7-1 7-4 . 7-1 7-5 . 7-2 8 C 8-1 . 8-1 8-2 . 8-1 9 K 9-1 . 9-1 9-2
. 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping . 2 3 2 2 4 Drain Tube . 2 3 2 2 5 Electric wiring . 2 4 2 3 Cautions about Reinstallation . 2 6 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation .
. 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping . 2 2 2 2 4 Drain Tube . 2 3 2 2 5 Electric wiring . 2 3 2 3 Cautions about reinstallation . 2 5 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation .
2 2 Installation . 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping. 2 2 2 2 4 Drain Tube . 2 3 2 2 5 Electric Wiring . 2 4 2 3 Cautions for Reinstallation . 2 5 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation
: Pneumatic fluid power General rules and safety requirements for systems and their components *2) JIS B8370 URLhttps://www.smcworld.com/ i i-1 . i-1 i-1-1 . i-1 i-2 . i-2 i-2-1 . i-2 i-2-2 . i-3 i-2-3 . i-3 i-2-4 . i-3 i-2-5 . i-3 i-2-6 . i-4 i-2-7 . i-4 i-2-8 . i-5 i-2-9 . i-5 i-3 . i-6 i-4 / . i-7 1 1-1 . 1-1 2 2-1 . 2-1 2-2 . 2-1 2-2-1 . 2-1 2-2-2 . 2-2 2-2-3
. 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping . 2 3 2 2 4 Drain Tube . 2 3 2 2 5 Electric wiring . 2 4 2 3 Cautions about Reinstallation . 2 6 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation .
rules and safety requirements for systems and their components *2) JIS B8370 URLhttps://www.smcworld.com/ i i-1 . i-1 i-1-1 . i-2 i-2 . i-3 i-2-1 . i-3 i-2-2 . i-4 i-2-3 . i-4 i-2-4 . i-4 i-2-5 . i-4 i-2-6 . i-5 i-2-7 . i-5 i-2-8 . i-6 i-2-9 . i-6 i-3 . i-7 i-4 . i-8 1 1-1 . 1-1 2 2-1 . 2-1 2-2 . 2-1 2-2-1 . 2-1 2-2-2 . 2-2 2-2-3 . 2-2 2-2-4 . 2-2 2-2-5 . 2-3
. 2-2 2-2-3 . 2-2 2-2-4 . 2-3 2-2-5 . 2-3 2-3 . 2-5 3 / 3-1 . 3-1 3-2 . 3-1 3-3 . 3-2 3-4 . 3-2 3-5 . 3-2 3-6 . 3-2 4 4-1 . 4-1 4-2 . 4-1 4-2-1 () . 4-1 1 4-2-2 . 4-1 4-2-3 . 4-2 5 5-1 . 5-1 6 6-1 . 6-1 6-2 GWP . 6-3 6-3 . 6-4 6-4 . 6-5 6-5 . 6-7 7 C 7-1 . 7-1 7-2 . 7-1 8 K 8-1 . 8-1 8-2 . 8-1 9 L 9-1 . 9-1 9-2 . 9-1 9-3 . 9-2 9-4 . 9-2 10 M 10-1