SMC Corporation of America
Elite Part Number Search
Search Results "ZSE20C-T-P-N02-W"

1 t i With auto switch (Built-in magnet) 20, 25 12, 16 t y e !2 !0 q r !3 !1 w t !1 !2 !0 o q r !3 w y e Component Parts No.

50 or less Chloride ion (Cl) [mg/L] 50 or less Sulfuric acid ion (SO42) p p p p p [mg/L] 50 or less Acid consumption amount (at pH4.8) [mg/L] 70 or less Total hardness 1.Thoroughly read the Operation Manual.

P(2) P(1) P(1) Note 1) P P P P P P P P P P P P P P P P P P P P P P P P P Note 5) P Basic Foot Rod flange Head flange Integral clevis Single clevis Double clevis Note 3) Note 1) Note 1) P(1) Note 2) P(1) Note 2) P(1) P(1) P(1) Rod trunnion Head trunnion Boss-cut/Basic Boss-cut/Rod flange Boss-cut/Rod trunnion Note 1) Mounting nuts are not attached to the integral clevis, single clevis and

IDX-OM-V024-F PRODUCT NAME Refrigerated Air Dryer MODEL / Series IDFB60-11-C,L,R,T,V IDFB60-23-C,L,R,T,V IDFB70-23-C,L,R,T,V IDFB80-23-C,L,R,T,V IDFB90-23-C,L,R,T,V This manual is intended to explain the installation and operation of the product.

Applicable bore (mm) A D L MM N R W B C H d Applicable bore (mm) Part no.

Applicable bore (mm) A D L MM N R W B C H d Applicable bore (mm) Part no.

MC MC PRR THR MC C01 CM MC OLP1 OLP2 CM OLR For Option M MOV MOV For Option M FM C11 MC TDR C11 FM PRS PRS P P IDF55E-30-T IDF75E-30-T GFCI For Option R GFCI For Option R GFCI GFCI Operation Failure Operation Failure 1 2 3 TB 1 2 3 TB MC1 TDR MC1 TDR PRR PRR MC1THR MC1THR CM CM OLR MC2 MC2 FM FM THP THS THP MC1 MC1 MC1 MC1 MC2 MC2 P PRS1 P PRS1 TDR THR PRR PRS2 PRS2 TDR THR PRR P

operating pressure Lo Fn W Guide First tentative bore size determination F3 D1.6 x P First tentative bore size determination F2 D1.6 x P First tentative bore size determination F1 D1.6 x P WB Inclined operation W+WBWV PPV W + WB>WV P>PV Allowable driving force table (Fn) (n = 1, 2, 3) Determination of allowable load weight & pressure F1 = x (W + WB) x 9.8 Horizontal F2 = (W + WB) x

. l b t t . l b kwh Volume ins 16387 in3 16.387 ft3 0.0283 ft3 28.329 gal(U.S.)3.785 Volume mm3 6.10 x 10-5 cm3 (cc) 0.0610 m3 35.320 L 0.0353 L 0.2642 Weight g 0.0353 kg 2.2046 1.356 N . m 1.356 J 3.6 l\rJ mm3 cm3 (cc) m3 L L rn3 in3 Energy ft3 N. m f t 3 J gar(u.s.)

L3 A3 Graph (1) Load Weight: W Mr Static moment Dynamic moment MXY6 W My W L3 A3 0.6 A2 L2 Rubber stopper screw MX Load weight W kg Mr 0.5 L1 A1 Metal stopper screw Mp 0.4 W MTS My W 0.3 W MY 0.2 Mey Mep 0.1 We CY We 0.0 A2 L3 A3 L2 Collision speed V mm/s 0 100 200 300 400 500 280 560 MG Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650

IDX-OM-U010-H PRODUCT NAME Refrigerated Air Dryer MODEL / Series IDFC60-23-C,L,R,T,V IDFC70-23-C,L,R,T,V IDFC80-23-C,L,R,T,V IDFC90-23-C,L,R,T,V This manual is intended to explain the installation and operation of the product.

Nil 3 S n B L F G C D T Type Lube Non-lube Air-hydro MB Nil N H MB1 Auto switch Without auto switch Refer to the table below for the applicable auto switch model.

The amount of air requirement of rotary actuator = 0.06 x V x (P/0.1)/t L /min(ANR) V : Inner volume = cm3 P : Absolute pressure = {Operating pressure (MPa) + 0.1} t : Operating time = s Calculate the required air volume separately for the linear motion part and the rotary motion part.

Payload W (kg) 9-14-7 Series ML1C Basic Type +0.06 +0.01 AA depth BB 4-V depth W 4-S through, counterbore T, depth U +0.06 +0.01 CC depth DD B + Stroke Manual override rod A + Stroke 3-Rc FF Actuating port Actuating port 3-Rc FF Brake releasing port 2-Rc FF Actuating port 5 depth 5 +0.06 +0.01 5 depth 5 2-Rc FF Actuating port +0.06 +0.01 4-Y depth Z P + Stroke Bottom Side Piping Port Size

Payload W (kg) 9-14-7 8 Series ML1C Basic Type +0.06 +0.01 AA depth BB 4-V depth W 4-S through, counterbore T, depth U +0.06 +0.01 CC depth DD B + Stroke Manual override rod A + Stroke 3-Rc FF Actuating port Actuating port 3-Rc FF Brake releasing port 2-Rc FF Actuating port 5 depth 5 +0.06 +0.01 5 depth 5 2-Rc FF Actuating port +0.06 +0.01 4-Y depth Z P + Stroke Bottom Side Piping Port Size

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com d n i n i W g c e t i r o i d n e p a t e p i P Leakage Voltage It must be noted that when connecting C-R element parallel to switching element, leakage current flows through C-R element and the leak voltage increases

Drip failure can cause damage to the components that need lubrication. 14-2-62 Lubricator Series AL10 to 60 Construction AL10 AL20 JIS Symbol w w e q q t IN OUT IN OUT F.R.L. y y AV r u u AU AF AR AL30/40 AL50/60 IR w w q t VEX q e e t AMR IN OUT OUT IN ITV y r IC i r u VBA VE VY1 y G u PPA AL Component Parts Description Material Note No.