SMC Corporation of America
Elite Part Number Search
Search Results "PSH-RT-01"

C = coupling, tube to tube L = elbow, barbs at 90 T = tee/ (-3) = (3 way tee) T90 = branches at 90 X = 4 way cross R = reducer RB = reducer bushing RC = reducer coupling RT = reducer tee RX = reducer cross A = adjustable BK = bulkhead F = female thread HN = hex nipple IRM = in-line reducer manifold M = manifold SW = swivel V = outlets at 60 C.

in one kit, and can be ordered using the order number for each respective tube bore size. 6-12-6 Series C95 ISO/VDMA Cylinder: Standard Type Double Acting, Single/Double Rod Dimensions: Without Mounting Bracket [First angle projection] C95SB Bore size Stroke CJ1 CJP CJ2 CM2 CG1 MB MB1 CA2 CS1 C76 C85 C95SB Bore size Stroke W C95 CP95 NCM NCA D-X 20Data Bore size (mm) B e11 E R AM D EE PL RT

7 contained in one kit, and can be ordered using the order number for each respective tube bore size. 6-13-8 8 Series CP95 ISO/VDMA Cylinder: Standard Type Double Acting w/ End of Stroke Cushioning Dimensions: Without Mounting Bracket [First angle projection] CP95SB Bore size Stroke Cushion valve Port CJ1 CJP CJ2 4-RT CM2 VD AM WH CG1 L8 + Stroke H MB ZZ + Stroke MB1 CA2 CS1 CP95SB Bore size

.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com MB MB1 CA2 CS1 C76 C85 C95SB Bore size Stroke W C95 CP95 NCM NCA D-X 20Data Bore size (mm) B e11 E R BG (MIN) AM D EE PL RT L12 KK SW G L8 VD VA WA WB WH ZZ ZY L2 L9 22 24 32 32 40 40 30 35 40 45 45 55 12 16 20 20 25 30 G 1/8 G 1/4 G 1/4 G 3/8 G 3/8 G

San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com L8 + Stroke H MB ZZ + Stroke MB1 CA2 CS1 CP95SB Bore size Stroke W C76 C85 C95 CP95 NCM NCA DVD -X AM WH WH + Stroke L8 + Stroke H 20ZY + Stroke Data Bore size (mm) AM KK L8 SW B D G EE BG (MIN) PL RT I12 E R VD VA I9 WA WB WH ZZ ZY I2 M10 x 1.25 32 6 16 94 22 30 10 27 12

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: w/Units Selection Function, Piping Specification: 01 (R 1/8), Option 1: W (Lead Wire w/Connector, 2m Waterproof), Option 2: A (Bracket)

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: w/Units Selection Function, Piping Specification: 01 (R 1/8), Option 1: W (Lead Wire w/Connector, 2m Waterproof), Option 2: None, Option 3: Y (w/o Operation Manual)

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: w/Units Selection Function, Piping Specification: 01 (R 1/8), Option 1: W (Lead Wire w/Connector, 2m Waterproof)

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: w/Units Selection Function, Piping Specification: 01 (R 1/8), Option 1: w/o Lead Wire, Option 2: A (Bracket)

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: w/Units Selection Function, Piping Specification: 01 (R 1/8), Option 1: w/o Lead Wire, Option 2: B (Panel Mount Adapter)

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: M (SI units only), Piping Specification: 01 (R 1/8)

Output Specification: L2 (IO-Link/Switch output 1 + Switch output 2), Units specification: w/Units Selection Function, Piping Specification: 01 (R 1/8), Option 1: W (Lead Wire w/Connector, 2m Waterproof), Option 2: D (Panel Mount Adapter + Front Protection Cover)

X Y Z B FT FV FX FY FZ RT Z CD CZ L U Z ZZ TD TT TY TZ Z ZZ RY ZZ RR LS LY RY CX TX Bore (mm) Front Rear Front Rear 40 0.032 0.059 800 500 500 800 500 15 9.0 138 3.2 27 13 24 175 71 9.0 100 29.5 30 16 165 175 117 140 40 42 12 60 80 42 39 10 22 62 93 10 70 15 85 146 147 1000 (1001 to 1200) 81 (88) 12 (20) 90 (120) 50 (58) 110 (144) 46 (47) 159 (163) 0.032 0.059 50 1200 600 600 600 15

CS1B125SCS1125, #1 CS1B140SCS1140, #1 CS1B160SCS1160, #1 CS1B180SCS1180, #1 CS1B200SCS1200, #1 CS1B250SCS1250, #1 CS1B300SCS1300, #1 1.10-12 Air Cylinder Series CS1 Foot/CS1L Lube (CS1L), Non-lube (CS1LN), Air-hydro (CS1LH) CJ1 CJP CJ2 Long stroke CM2 C85 CG1 MB C95 CA1 CS1 With auto switch/CDS1L (mm) Style Bore (mm) Long stroke range (mm) Stroke range (mm) J B FA G LD LH AL E F KA LX RT

From the formula C=VA/4=(RT/2M)0.5A, the conductance for 1cm is C=11.6A l/sec, at an air temperature of 20C. Valve closing The time from the cut off of power to the actuation solenoid valve until 90% of the valve (XLm) return stroke has been completed is the valve closing response time.

. -4i -2 .44 -.4 5000 4m0 40 30 m 2500 2000 1500 12.5 1 0 ===-rt=='-t {E -.2-_L-2. d r / .zx. :2. 4 6 (mm) Fig.6.14 Theortical Force of pneumatic cylinders, trom 2.5 to 30 mm (left and top scales) and from 32 to 300 mm (right and bottom scales) for 19,.1-a"ng,5 bg!.

MXS MXQ MXF -H -R -W MXW N L Centre trunnion: CBA1T Bore size Stroke MXP MG MGP MGQ (mm) MGG Symbol Foot Center trunnion Clevis Flange Stroke range Stroke range Stroke range ZZ Stroke range MGC FD LD LH LT LX RT X Y Z B FT FV FX FY FZ RT Z CD CZ L U Z ZZ TD TT TY TZ Z ZZ RY ZZ RR LS LY RY CX TX Bore (mm) Front Rear Front Rear 40 0.032 0.059 800 500 500 800 500 15 9.0 138 3.2 27 13 24 175

across flats KA S + Stroke 4 x J With rod boot 2 x P MB MB1 C CA2 d 4 x LD CS1 LS + Stroke ZZ + Stroke ZZ1 + l + Stroke CS2 With auto switch: CDS1L ~ = Width across flats KA S + Stroke 4 x J 2 x P With rod boot ~ = ~ = C d 4 x LD LS + Stroke ZZ + Stroke ZZ1 + l + Stroke (mm) Stroke range* Type Bore size (mm) (mm) Long stroke range (mm) A AL B C D E EA F FA G J K KA LD LH LS LT LX LY MM N RT

Note 3) Calculated at 1 RT = 4.535kW Note 4) If the product is subjected to a short power outage (including voltage sag), it may take a long time to start operating normally or be unable to restart normally due to the protective equipment triggered after the power is recovered. Note 5) The value shown in it is a reference value at rated condition and is not the guaranteed value.

Note 3) Calculated at 1 RT = 3300 kcal/h Note 4) If the product is subjected to a short power outage (including voltage sag), it may take a long time to start operating normally or be unable to restart normally due to the protective equipment triggered after the power is recovered. Note 5) The value shown in it is a reference value at rated condition and is not the guaranteed value.