m (95% filtered particle size)Max. 0.1 mg/m3 (ANR) (Before saturated with oil: 0.01 mg/m3 (ANR) or less, approx. 0.008 ppm) (2)PolycarbonateStandard450.44
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
m (95% filtered particle size)Max. 0.1 mg/m3 (ANR) (Before saturated with oil: 0.01 mg/m3 (ANR) or less, approx. 0.008 ppm) (2)PolycarbonateStandard250.22
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
See Fig. 4] For FN112-10, two screws are mounted in the middle of the guide assembly [M3 See Fig. 4] 2-6. The element can now be pulled out of the cover. Do not disassemble the element any further. Note) Reassembly should be performed by reversing the disassembly procedure. Refer to the schematic drawings for the assembly and disassembly procedures for the cover, seals etc.
X 0.5 M10 X 1.0 9 18.5 25.5 32.5 3 27.5 34.5 41.5 3 10 19 22 6 14.5 21 28 12 12 3.5 M4 X 0.7 M15 X 1.5 13 20.5 27 34 4 32.5 39 46 5 12 27 31 7 16.5 22.5 29 19 14 4.2 M5 X 0.8 M22 X 1.5 20 23.5 29.5 36 5 37.5 43.5 50 6 Plug Mounting Style CJPS B C E G H K MM NN 5st 10st F 15st R 5st 10st S 15st W Q 5st 10st Z Bore (mm) 6 10 15 A 15st 7 12 13.9 6 12.5 19.5 26.5 8.5 9 3.5 M3 X 0.5 M10 X 1.0
A I 18 6 21 9 5 5 23 34 Side A Side B 12-11-13 14 Series MRHQ Dimensions MRHQ16 A B 41 50 66.5 4-M5 x 0.8 depth 8 30 Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com 0 -0.062 47h9 +2.2 -0.2 20.9 opened 0 -0.1 5 41 +0.03 0 3-4H9 depth 6 (one each on three sides) 4-M3
Moment (Nm) Payload (N) ML1C/M2,M3 How to calculate the load ratio A. Consider q Max. payload, w static moment, e dynamic moment (when stopper collides) when calculating the Max. allowable moment and payload. Evaluate q and w as a (average speed), and e as (collision speed =1.4a).
.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com 4-M3 x 0.5 depth 6 (Bracket mounting screw) 7 8 47.5 2-4.5 (Bracket mounting hole) 15.5 20 25 49 4 L3 7 7 L Dimension n: Stations n L 1 35 27 13 2 54 46 32 3 73 65 51 4 92 84 70 5 6 130 122 108 7 149 141 127 8 168 160 146 9 187 179 165 10 206 198 184
Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com Mounting screw (M4) Terminal block cover M3 screw Gasket 6 mm Electrical entry 2-G3/4 Step 3.
.: 23 (ø3.2, use ø1/8" Tubing), Thread: R, Port Size: M3 (M3 x 0.5)
.: 23 (ø3.2, use ø1/8" Tubing), Thread: R, Port Size: M3 (M3 x 0.5)
m (95% filtered particle size)Max. 0.1 mg/m3 (ANR) (Before saturated with oil: 0.01 mg/m3 (ANR) or less, approx. 0.008 ppm) (2)PolycarbonateOption80.18
m (95% filtered particle size)Max. 0.1 mg/m3 (ANR) (Before saturated with oil: 0.01 mg/m3 (ANR) or less, approx. 0.008 ppm) (2)PolycarbonateStandard250.22
m (95% filtered particle size)Max. 0.1 mg/m3 (ANR) (Before saturated with oil: 0.01 mg/m3 (ANR) or less, approx. 0.008 ppm) (2)PolycarbonateStandard250.22
m (95% filtered particle size)Max. 0.1 mg/m3 (ANR) (Before saturated with oil: 0.01 mg/m3 (ANR) or less, approx. 0.008 ppm) (2)PolycarbonateStandard250.22