REC Type Solid state switch Reed switch 3-wire: 100 A or less, 2-wire: 0.8 mA or less (4) Leakage current None CX Note 2) Operating time 1 ms or less (3) 1.2 ms Impact resistance 1000 m/s2 300 m/s2 CY 50 M or more at 500 M VDC (Between lead wire and case) Insulation resistance Note 3) MQQ M 1000 VAC for 1 minute (Between lead wire and case) 1500 VAC for 1 minute (1) (Between lead wire and
CJP Type Solid state switch Reed switch Leakage current 3-wire: 100 A or less, 2-wire: 0.8 mA or less (4) None CJ2 Note 2) Operating time 1 ms or less (3) 1.2 ms Impact resistance 1000 m/s2 300 m/s2 CM2 Insulation resistance 50 M or more at 500 M VDC (Between lead wire and case) Note 3) CG1 1000 VAC for 1 minute (Between lead wire and case) 1500 VAC for 1 minute (1) (Between lead wire and
MTS Type Solid state switch Reed switch 3-wire: 100 A or less, 2-wire: 0.8 mA or less (4) Leakage current None MY Note 2) Operating time 1 ms or less (3) 1.2 ms Impact resistance 1000 m/s2 300 m/s2 CY 50 M or more at 500 M VDC (Between lead wire and case) Insulation resistance Note 3) MG 1000 VAC for 1 minute (Between lead wire and case) 1500 VAC for 1 minute (1) (Between lead wire and case
CL1 Type Solid state switch Reed switch 3-wire: 100 A or less, 2-wire: 0.8 mA or less (4) Leakage current None MLGC Note 2) Operating time 1 ms or less (3) 1.2 ms Impact resistance 1000 m/s2 300 m/s2 CNG 50 M or more at 500 M VDC (Between lead wire and case) Insulation resistance Note 3) MNB 1000 VAC for 1 minute (Between lead wire and case) 1500 VAC for 1 minute (1) (Between lead wire and
MTS Type Solid state switch Reed switch 3-wire: 100 A or less, 2-wire: 0.8 mA or less (4) Leakage current None MY Note 2) Operating time 1 ms or less (3) 1.2 ms Impact resistance 1000 m/s2 300 m/s2 CY 50 M or more at 500 M VDC (Between lead wire and case) Insulation resistance Note 3) MG 1000 VAC for 1 minute (Between lead wire and case) 1500 VAC for 1 minute (1) (Between lead wire and case
MTS Type Solid state switch Reed switch 3-wire: 100 A or less, 2-wire: 0.8 mA or less (4) Leakage current None MY Note 2) Operating time 1 ms or less (3) 1.2 ms Impact resistance 1000 m/s2 300 m/s2 CY 50 M or more at 500 M VDC (Between lead wire and case) Insulation resistance Note 3) MG 1000 VAC for 1 minute (Between lead wire and case) 1500 VAC for 1 minute (1) (Between lead wire and case
0.1 100 200 300 400 500 1000 1500 100 200 300 400 500 1000 1500 100 200 300 400 500 1000 1500 Piston speed (mm/s) Piston speed (mm/s) Piston speed (mm/s) Piston speed (mm/s) ML2B/M1 (Pitch moment) ML2B/M2 (Roll moment) ML2B/M3 (Yaw moment) 30 40 20 20 5 4 3 10 10 5 4 3 ML2B40 ML2B40 2 5 4 3 Moment (Nm) Moment (Nm) Moment (Nm) 2 ML2B32 ML2B32 1 ML2B40 ML2B40 ML2B40 ML2B40 2 1 ML2B25 ML2B25
0 10 20 30 40 Circulating fluid temperature [C] Circulating fluid temperature [C] HRR030-A-20, HRR030-W-20 [50 Hz] [60 Hz] 4000 4000 25C 25C 3500 3500 Cooling capacity [W] Cooling capacity [W] 3000 3000 32C 2500 2500 32C 2000 2000 40C 1500 1500 40C 1000 1000 Ambient temperature or facility water temperature Ambient temperature or facility water temperature Ambient temperature or facility
1000 500 400 300 200 100 1500 1000 500 400 300 200 100 1500 1000 500 400 300 200 100 MY3B max.
The operating time for D-J51 is 2 ms or less and for D-P4DWL is 40 ms or less. 4) 980 m/s2 for the trimmer type sensor section, 98 m/s2 for the amplifier section.
SY100-30-3AS Z Without lead wire: (with connector and 2 of sockets only) SY100-30-A Rated voltage R 5 6 V S R 1 2 24 VDC 12 VDC 6 VDC 5 VDC 3 VDC 100 VAC 50/60 Hz 200 VAC 50/60 Hz 110 VAC 50/60 Hz [115 VAC 50/60 Hz] Lead wire length U Nil 6 10 15 20 25 30 50 300 mm 600 mm 1000 mm 1500 mm 2000 mm 2500 mm 3000 mm 5000 mm For AC voltage valves there is no S option.
Lead wire length Nil 300 mm 6 600 mm 10 15 20 25 30 50 1000 mm Connector cable mounting 1500 mm 2000 mm 2500 mm 3000 mm 5000 mm Triangle mark Arrow mark Connector Assembly with Cover: Dimensions (40) Gray (10) (8) (4.1) Red Black (6.9) Note) Connector cable should be mounted in the correct direction.
PDisconnectionPress the lever against the connector housing and pull it outward from the solenoid : 300 600 1000 1500 2000 2500 3000 5000 For DC SYJ312-5LO-M3 SY100-30-4A-20 6 10 15 20 25 30 50 How to Order To order a valve with lead wire length of other than 300mm, indicate part numbers. of the valve without connector and the required connector assembly separately.
Fix the adjusting bolt to around 0.5 mm projection from the shock absorber as shown below. m: Weight of impact object (kg) g : Gravitational acceleration (9.8 m/s2) RHC 2000 1500 Stroke adjusting unit MK(2) Note) The speed of the impact object is measured at the time of impact with the shock absorber.
Fix the adjusting bolt to around 0.5 mm projection from the shock absorber as shown below. m: Weight of impact object (kg) g : Gravitational acceleration (9.8 m/s2) RHC 2000 1500 Stroke adjusting unit MK(2) Note) The speed of the impact object is measured at the time of impact with the shock absorber.
Fix the adjusting bolt to around 0.5 mm projection from the shock absorber as shown below. m: Weight of impact object (kg) g : Gravitational acceleration (9.8 m/s2) RHC 2000 1500 Stroke adjusting unit MK(2) Note) The speed of the impact object is measured at the time of impact with the shock absorber.
]) (2000 [mm/s2]) (3000 [mm/s2]) Note 2) Work load [lb] Horizontal Vertical Actuator specifications Electric specifications Lock unit Pushing force [N] Note 3) 4) 5) Speed [mm/s] Note 5) Max. acceleration/deceleration [mm/s2] Pushing speed [mm/s] Note 6) 50 or less 30 or less 35 or less Positioning repeatability [mm] 0.02 Screw lead [mm] Impact/Vibration resistance [m/s2] Note 7) 10 5 2.5
Do not drop, bump or apply excessive impacts (300 m/s2 or more for reed auto switches and 1000 m/s2 or more for solid state auto switches) while handling. Although the body of the auto switch may not be damaged, the inside of the auto switch could be damaged and cause malfunction. 2. Observe the proper tightening torque for mounting an auto switch.
]) 20 40 60 30 45 60 Horizontal (2000 [mm/s2]) 30 60 70 40 60 80 Work load [kg] Note 2) For LECPA (3000 [mm/s2]) 12 30 30 20 40 40 (2000 [mm/s2]) 18 50 50 30 60 60 Actuator specifications Vertical Note 15) (3000 [mm/s2]) 7 15 29 10 21 42 Pushing force [N] Note 3) Note 4) Note 5) 63 to 122 126 to 238 232 to 452 80 to 189 156 to 370 296 to 707 Speed [mm/s] Note 5) 18 to 400 9 to 200 5 to 100
C) Circulating fluid temperature (C) HEC012 Circulating fluid: Clear water Circulating fluid: FC-3283 50 70 90 110 130 150 F 50 70 90 110 130 150 F 3000 3000 Facility water: 68F (20C) Facility water: 50F (10C) 2500 2500 Facility water: 50F (10C) Cooling capacity (W) Cooling capacity (W) Facility water: 68F (20C) 2000 2000 Facility water: 95F (35C) 1500 1500 Facility water: 95F (35C) 1000