SMC Corporation of America
Elite Part Number Search
Search Results "CDJ5L16SR-45-B"

NZ M5 x 0.8 9 70 50 4 44 89.8 85 M3 x 12 M5 x 45 14 NY M4 x 0.7 8 70 50 4 44 89.8 85 M3 x 12 M5 x 45 14 NX M5 x 0.8 9 63 50 5 47.2 89.8 85 M4 x 12 M5 x 45 9 NW M5 x 0.8 9 70 50 5 45 89.8 85 M4 x 12 M5 x 45 9 NV M4 x 0.7 8 63 50 5 47.2 89.8 85 M4 x 12 M5 x 45 9 NU M5 x 0.8 9 70 50 5 45 89.8 85 M4 x 12 M5 x 45 11 NT M5 x 0.8 9 70 50 4 44 89.8 85 M3 x 12 M5 x 45 12 NM2 M4 x 0.7

MLGC Front flange CNA Bore (mm) B BZ FT FD FX FZ FY CB 20 25 32 40 57.5 69 69 76 5.5 5.5 6.6 6.6 6 7 7 8 52 60 60 66 38 45 45 52 65 75 75 82 25 30 30 36 Rear flange/CLG1GN Front flange/CLG1FN CV/MVG CXW Refer to p.3.1-30 for long stroke dimensions.

0.6 55 50 70 15 76 96 13.5 20 19 11 353.5 393.5 Rotating Angle Bore size [mm] A B A + B + 90 32, 40 25 45 160 50, 63 40 60 190 80, 100 30 55 175 32 C96N Series Construction (Double Rod) @0!

5 A-A t y @2 C B e @1 !0 C B r w C-C B-B !4 !2 Body Table !3 Component Parts No. Description Material Note No.

button dimensions b L M1 M2 Applicable tubing O.D.

Refer to page 4 for minimum stroke with auto switch. 32 is only available for B series rod sizes. CH2 H B B 50 100 CH D2 H B B 50 100 A53 Standard Type With Auto Switch Number of auto switches With auto switch (built-in magnet) 2 pcs. 1 pc. 3 pcs. "n" pcs.

3 A-A B B @1 !8 B-B w Component Parts No. Description Material Note No.

-A22 ZPT125 50-(B/N/T)01-A22 ZPT125 75-(B/N/T)01-A22 ZPT125 100-(B/N/T)01-A22 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T3 25-(B/N/T)01 ZPB-T3 50-(B/N/T)01 ZPB-T3 75-(B/N/T)01 ZPB-T3 100-(B

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com A A a B B s j C f g t C0.5 C0.2 b C0.2 d e 45 45 Section A-A p k C0.5 45 (d) C n h i l C0.5 q m O Section B-B r (I) View C (mm) a b c d e f g h i o j k m n p q r s l t Model 0 0.2 0.05 0.15 +0.2 0 +0.1 0 +0.2 0 CXS6

A B 2-P C L L C A B A B LVA10 2-F B B K LVA60 LVA20 With flow rate adjustment With indicator (Max.

A B Hs Hs Hs Hs Hs Hs Hs Hs Hs Hs D-M9lV D-M9lWV D-M9lAV D-A9lV D-M9lV D-M9lWV D-M9lAV D-A9lV 17 B A A B D-H7l D-H7lW D-H7BA D-H7NF D-C7l D-C80 D-F7l D-F7lW D-J79 D-J79W D-F7BA D-F79F D-A7lH D-A80H 17 A B A B D-F7lV D-F7lWV D-F7BAV D-A7l D-A80 D-A79W D-H7C 17 A B A B D-C73C D-C80C D-J79C D-A73C D-A80C 17 Auto Switch Made to Order B A B A 102 C85/C75 Series Auto Switch Proper Mounting

Optional specifications Note 2) With barb fitting B With drain guide B Metal bowl B 85 123 166 166 200 200 276 292 293 Metal bowl with level gauge Model B V AC10 AC20 AC25 AC30 AC40 AC40-06 AC50 AC55 AC60 161 161 195 195 272 287 288 160 160 194 194 271 286 287 186 186 220 220 296 312 313 38 38 45 45 45 45 45 4 F.R.L.

Model A B C Accessory fittings Clamp fitting L AERSBAN-DSET 100 86 30 Clamp A: 2pcs. A 70 AERSBAN-ESET 70 56 Clamp B: 1pc. B 45 11 24 11.

wire electrical entry) P EB EA 31 50 67 81 37 37 43 6-Rc 3/4 61 103 (P , EA, EB port) 72 [ ] = A, B port Rc 3/4 Formula for manifold weight M = 0.911n + 1.621 (kg) n: Station 144 (72) 60 11 60 Non plug-in type: VV5FR5-10Station 1Bore size U side 2.3 (Electrical entry) Manual override (Non-locking) 21 R5.5 B B B B A A A A B B B n A A A B B B B A A A A 3 L2 L1 P = 51 11 11 71.5 (Pitch) P =

F D GA 80 H 8 BQ GK GQ GL GR 5 BZ BP GC GB GD 3.5 B1 AL B B2 BN BC 13 1/8 1/8 1/8 1/8 1/8 1/8 1/8 1/8 Up to 400 55 8 8 41 4 6 38 4 26 40 73.5 15.5 63.5 8 13 20 8 6 Up to 450 64.5 8 9 45 7 9 45 7 32 4 47 83.5 19.5 74.5 10 22 17 90 13 CNS 25 8 6 Up to 450 64.5 8 9 45 7 9 45 7 32 4 47 83.5 19.5 74.5 12 22 17 90 13 32 10 8 Up to 500 70 11 8 50 7 11 52 8 41 4 54 90.5 21 80 14 24 22 100.5 16 40

-A22 ZPT125 50-(B/N/T)01-A22 ZPT125 75-(B/N/T)01-A22 ZPT125 100-(B/N/T)01-A22 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T1 25-(B/N/T)01 ZPB-T1 50-(B/N/T)01 ZPB-T1 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T2 25-(B/N/T)01 ZPB-T2 50-(B/N/T)01 ZPB-T2 75-(B/N/T)01 ZPB-T3 25-(B/N/T)01 ZPB-T3 50-(B/N/T)01 ZPB-T3 75-(B/N/T)01 ZPB-T3 100-(B

C B A stroke A C 3) 2nd stage: B-A stroke operation Following the 1st stage, when the air pressure is supplied from the C port, the rod operates the B-A stroke. B B-A stroke B A C 4) Cylinder retraction When the air pressure is supplied from the B port, the rod retracts completely. B stroke A stroke A stroke or B stroke operation can be made individually.