(refer to P.41 11-2) 39 After reviewing of number of brake operation, press WRITE to switch to next input operation. The display will indicate PRG STEP P7 and present origin detection time. Next, enter desired origin detection time. The setting range is 09.99sec (1 unit as 10msec). Set the date with taking into the consideration of cylinder operating conditions.
L (mm) (mm) 25 32 40 12000(1mm) 25 MY-A25L 25 MY-S25A MY-S25B 32 MY-A32L 32 MY-S25A MY-S25B 40 MY-A40L 40 MY-S32A MY-S32B 6-2 CEU2 NPN P PNP 24 6-3 CE1-R 05 5m 10 10m 15 15m 20 20m C A B CD E F G () 25 7-1 AA BB CC DD EE HA KA KB KK 9 45.5 5.5 M5x0.8 9.5 69 30.5 16 M6x1 11 54 6.5 M6x1 12 84 32 15 M8x1.25 14 64 8.5 M8x1.25 12 102 41.5 19 M10x1.5 R S T U V W X Y Z 22 63.5 23.5 22 41
Operation 32 C96N32-PS 17 Rod seal 1 pc 40 Rod seal 1 pc 41 Piston seal 1 pc 42 Large cushion seal 2 pcs 43 Small cushion seal 1 pcs 45 Cylinder tube gasket 2 pcs 40 C96N40-PS 50 C96N50-PS 63 C96N63-PS 80 C96N80-PS 100 C96N100-PS Lock part is replaced as an entire unit. The seal kit for replacement contains the rod seal for the cylinder and lock.
35 How to change the auto switch detecting position 35 Auto switch operating angle and hysteresis angle 36 Operating range and hysteresis auto switch 37 Internal construction and component parts 37 Internal construction of rotary table with auto switch 39 MDSUA1/3 auto switch mounting 40 Maintenance and Inspection 40 Maintenance unit How to replace table unit / How to replace rotary unit 41
Allowable load a b Allowable thrust loadN Allowable momentNm Size Allowable radial load a b Basic type High precision N type 1 31 41 41 0.56 0.84 2 32 45 45 0.82 1.2 3 33 48 48 1.1 1.6 7 54 71 71 1.5 2.2 Unit used as flange mount Rotary table can be mounted from three directions-Two side of axial direction and one side of lateral face.
Refer to the operation manual of the setting software for how to perform a trial run. 41 - Operation . Operation flow The startup procedure varies depending on the power-on situation.
Crack on the back of the belt 41 -
7.6 How to detach and attach the dust seal band For the internal-check as the maintenance, the method of detaching and attaching the dust seal band is shown as the following.
Refer to the operation manual of the setting software for how to perform a trial run. 41 - Operation . Operation flow The startup procedure varies depending on the power-on situation.
/LEHS .20 4.1 . 20 4.2 . 21 4.3 . 22 5.23 5.1 . 23 5.2 . 24 5.3 . 27 . 27 . 29 (1). 31 (2). 32 (3). 33 . 34 5.4 . 36 . 36 . 38 1 - 6.39 7.40 7.1 . 40 7.2 . 41 7.3 . 41 7.4 . 42 7.5 . 44 7.6 . 44 8.45 8.1 . 45 8.2 . 46 8.3 . 50 8.4 . 53 .54 2 - LEH Series / (ISO/IEC)(JIS)1) 2) *1) ISO 4414: Pneumatic fluid power -General rules relating to systems ISO 4413: Hydraulic fluid power -General
DRV mon 1 Posn 123.45mm Speed MENUESC 41 - 6. 6.1 (1) LECP LECA No. TB Ver1.** TB Ver2.**2 TB Ver.5.11 LECPA PLC LECPLECA , , 1 1 LECPA aLECPLECA 100mm 42 - bLECPLECA 43 - (2) (2-1) LECPLECA INP ON ON INP OFF No.Step No.
() Step No. mm/s 1 2 2 2 mm mm/s mm/s / mm mm mm 1 ABS 100 200.00 1000 1000 0 6.0 12.0 0.5 2 ABS 50 100.00 1000 1000 0 6.0 12.0 0.5 0 3 ABS 50 100.00 1000 1000 0 6.0 12.0 0.5 4 ABS 50 100.00 1000 1000 0 6.0 12.0 0.5 1 INC 500 800.00 1000 1000 1 0 0 10 2 INC 500 900.00 1000 1000 1 0 0 10 1 3 INC 500 900.00 1000 1000 1 0 0 10 4 INC 500 900.00 1000 1000 1 0 0 10 Step No. 02047 No.41
CN5I/O . 23 6.1 . 23 6.2 (NPNPNP ) . 23 (1) I/O (NPNPNP ) . 23 (2) I/O . 23 6.3 . 24 6.4 I/O . 27 7. . 28 7.1 . 28 7.2 . 31 7.3 . 33 8. . 34 8.1 . 34 8.2 . 34 8.3 . 35 (1) . 35 (2) (). 35 (3) . 35 8.4 . 36 8.5 . 36 9. (). 37 9.1 . 37 9.2 . 38 10. . 39 10.1 . 39 10.2 I/O . 39 (1) . 39 (2) . 40 (3) . 41 (4) HOLD. 42 (5) . 42 2 - 6 . 42 (7) . 43 11. . 44 11.1 . 44 11.2 (). 45 11.3 I/O . 46 11.4
CN5I/O .23 6.1 /.23 6.2 /(NPNPNP ).23 (1) I/O (NPNPNP ).23 (2) I/O .23 63 /.24 64 I/O .27 7 .28 71 .28 72 .31 73 .33 8 .34 81 .34 82 .34 83 .35 1 .35 2 (.35 3 .35 84 .36 85 .36 9 .37 91 .37 92 .38 10 .39 101 .39 102 I/O .39 1 .39 2 .40 3 .41 4 HOLD.42 5 .42 2 - 6 .42 7 .43 11 .44 111 [5m ].44 112 [820m].44 113 [5m ].45 114 [820m] .45 115 I/O .46 116 .46 117 .47 12. .48 12.1 .48 12.2 .49 13
Refer to the electric actuators instruction manual for details. 41 - 10.
(CN2SW) . 16 4.3 (LEC) . 17 5. . 19 5.1 CN4 . 19 5.2 CN3 . 19 5.3 CN1CONT . 19 5.4 CN2PC/TB . 20 .CN4 . 21 6.1 . 21 1 - 6.2 . 21 6.3 . 22 . 23 7.CN3 . 24 8.CN1IF (CONT) . 25 8.1 . 25 8.2 . 27 9.CN2TB/PC . 28 9.1 . 28 10.LED . 29 10.1 LED . 29 10.2 IF LED . 29 11. . 30 11.1 . 30 11.2 . 30 11.3 . 30 11.4 . 32 12. . 33 12.1 . 33 12.1.1 . 39 12.2 IF ( ) . 40 12.3 (IO ) . 41
Specifications 41 Dimensions 43 Accessories 46 -1No.EX-OME0015-F Safety Instructions These safety instructions are intended to prevent hazardous situations and/or equipment damage.
Figure 5-41 Serial Communication Setting Screen 2 [Tips] The setting has not taken effect while the box is flashing. 2. Touch the [Enter] key. The MESSAGE screen is displayed. Figure 5-42 Serial Communication Setting Screen 2 3. Touch the [YES] key. The setting takes effect.
GEN2 EX500-S103 EX500-DXP# Table of Contents Safety Instructions 3 Product Overview 9 System construction 9 EX500 GW unit Model Indication and How to Order 10 Summary of Product parts 10 Mounting and Installation 11 Installation 11 Wiring 12 LED Display 17 Setting of EtherNet/IPTM using RSLogix5000TM 20 I/O memory map 22 Web server function 30 Specification 39 Specifications 39 Dimensions 41
Width across flats of attachment 3/8 24 mm 1/2 28 mm 3/4 35 mm 1 41 mm Ensure that the piping is tightened to the required torque. The tightening torque for connection threads is shown in the table below.
Operations . 39 8.1 Return to origin . 39 (1) Return to origin operation . 39 (2) How to command the return to origin . 40 8.2 Positioning operation . 41 8.3 Jog operation / inching operation . 42 (1) Jog operation . 42 (2) Inching operation . 42 8.4 Servo ON . 43 8.5 Response time for the controller input signal . 43 9.