Refer to gauge guide (P.94). r w q w q Sample Order Number Port 2P 4PL 01 S BP10 e r t 0 4 4 4 4 1 MPA e 2P 4PL qIN wOUT erGauge port (Inlet) Specifications BP1030 15 to 300 psig (0.1 to 2.1 MPa) BP1001 0.5 to 10 psig (0.0034 to 0.07 MPa) BP1002 1 to 30 psig (0.007 to 0.2 MPa) BP1006 2 to 60 psig (0.014 to 0.4 MPa) BP1010 5 to 100 psig (0.034 to 0.7 MPa) BP1020 15 to 200 psig (0.1 to 1.4
3 e r !2 !1 u t w y CHK CHN CHM CHM CHS CH2 o !
Actuator driving system Inside of clean room w t e q r t q Cylinder relief port piping w Solenoid valve exhaust piping e Breathing piping of regulator r Drain piping t Exhaust Cleaner for Clean room/AMP series Cylinder relief port piping Series 10-/12-/21(atmospheric release type) Connect the relief port piping with the dedicated duct piping installed outside the clean room or with the exhaust
A 40 150 C73 21 C D M 2 R A 40 150 C73 Number of auto switches Mounting style 2 pcs. 1 pc.
Bore size 12 to 25 Without auto switch, With auto switch CD hole H10 0.4 0.2 CX CL 4 x CN R M CT A + Stroke CW CZ Applicable Cylinders/Double Clevis Pivot Bracket Part No. (mm) Hexagon socket A CN part no.
(R1) Sphere R (R1) Sphere R (R1) NDH10 NDH10 A1 A1 NZ E1 NX 0.2 0.4 NL L1 NO U1 NL L1 NO U1 NX +0.4 +0.2 (mm) Part no.
0 e e u u r i !1 r t !1 !0 Port 1 Port 2 Port 1 Port 2 Valve element A t q q o o w Valve element B y w Port 3 3 Port valve 2 Port valve Working Principle When the pilot operated solenoid valve !2 is not energized, the valve element A t connected to the piston u is closed by the return spring i. Then valve element B y connected to the valve element A t is open.
Keep rotating the initial air supply adjustment nut r to the right, and the minimum possible initial air supply flow is the point at which the name plate and adjustment nut mark align closest to where torque is felt. (The initial air supply adjustment nut r is set at the minimum flow rate position at factory shipment.
Pad assembly ZL ZH ZH Pad Locking status: Acceptable e ZH -X267 q Lock plate w Lock screw r Stud assembly Unlocked ZHP ZHP Adhesion q Remove the lock screw. w Push the lever (on the ejector side) of the lock plate to slide it to a position where it stops completely. e Pull out the pad assembly. r Pull out the stud assembly from the pad assembly. t Remove the holder. y Remove the plate from
.: P Without bracket Air pressure supply (P) port Thread size: Q R J K Note 1) 4 x Sa Thread depth Sb 2 x L O H I N G A M Vacuum flow Dust bag When dust bag is mounted T F E D Suction air Discharge air Suction air U C C B Hose band V (mm) A 73 B 34 C 19 D 10 E 13.2 F 16.2 G 69.8 H 31 I J 35 K 27 L 4.5 M 35 N 18 O P 13 Q Rc1/8 R 28 Sa M3 x 0.5 Sb 5 T 300 U 150 V 190 Model ZH10--X185 ZH20--
Color Symbol Symbol Color Black White Red Color Blue Yellow Green BU Y G B W R 15-6-13 Series TRBU Installation on One-touch Fittings Caution Lengths of tubes to be inserted into One-touch fittings are indicated on the outer layer of TRBU tubes.