SMC Corporation of America
Elite Part Number Search
Search Results "ISE70-N02-L2-LB"

This next generation ISE70 pressure sensor provides continuous quantitative values, as well as switched digital outputs when pressure set points are met.  This sensor is also IO-Link compatible. 

This next generation ISE70 pressure sensor provides continuous quantitative values, as well as switched digital outputs when pressure set points are met.  This sensor is also IO-Link compatible. 

. 20 LD LC Regenerative option Variable dimensions Mass LA LB LC LD [kg] [lb] LEC-MR-RB-032 30 15 119 99 0.5 1.1 LEC-MR-RB-12 40 15 169 149 1.1 2.4 11 15 11.

Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1, L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1, L2, L3 L2 L3 L1C Control power supply Connect the control power supply.

For 3-phase or 1-phase 200 to 230VAC 40 For 1-phase 100 to 120VAC PE terminal 6 L1 L1 L2 2-M5 screw L2 L3 CNP1 CNP1 Screw size: M4 Tightening torque: 1.2 [N m] (10.6 [lb in]) N N P1 P3 P1 Screw size:M4 Tightening torque:1.2[Nm] P4 P2 P2 P P C C CNP2 CNP2 D D L11 L11 L21 L21 Mounting hole process drawing Mounting hole process drawing Mounting screw Screw size: M5 Tightening torque: 3.24[N

(a) Delta connection For the 3-phase (L1/L2/L3) delta connection, an instantaneous power failure occurs in the voltage between a pair of lines (e.g. between L1 and L2) among voltages between three pairs of lines (between L1 and L2, L2 and L3, or L3 and L1).

OUTLINE DRAWINGS (2) LECSA-S4 [Unit: mm] Mass: 0.7[kg] (1.54[lb]) Terminal layout CNP1 CNP2 24V 0V L1 L2 P C U V W Mounting screw Screw size: M5 Tightening torque: 3.24[N m] (28.7[lb in]) 9 3 9.

) L1 = 50 [mm] L2 = 40 [mm] m L2 L1 Item Load factor an Note 1.

F02 C01 A2 B2 2 49.6 (N02: 50.1) M5 x 0.8 thread depth 5 30 26.2 20 8.45 20 30 Width across flats 17 10 2 x M3 x 0.5 thread depth 4 Piping port 02: R1/4 N02: NPT1/4 3.5 8.8 Atmospheric vent port 2.6 14.7 25.1 46.2 2 12.4 26.2 10.1 8.45 22 14.5 Piping port Rc1/8 Piping port G1/4 -F02: G1/4 -C01: Rc1/8 27.7 21.7 8.45 8.45 Piping port TSJ1/4 Piping port URJ1/4 -B2: TSJ1/4 -A2: URJ1/4 736 Series

11 One-touch Screw-in One-touch N01 N02 N02 Screw-in Screw-in Screw-in ZH15DA08 10 10 One-touch One-touch One-touch 08 03 10 One-touch Screw-in One-touch 02 03 03 Screw-in Screw-in Screw-in ZH15DA09 11 11 One-touch One-touch One-touch 09 N03 11 One-touch Screw-in One-touch N02 N03 N03 Screw-in Screw-in Screw-in ZH18DA10 12 12 One-touch One-touch One-touch 10 03 12 One-touch

: 48.9 Atmospheric vent port 02 4 x 2.6 Depth 7 or less 20 30 25 8.5 11 R1/4 M5 x 0.8 Thread depth 5 4.2 N02 30 20 NPT1/4 17 Piping port 02: R1/4 N02: NPT1/4 2.5 If there is a possibility that the atmospheric vent port of the switch will be exposed to water or dust, insert a tube into the atmospheric vent port and route the other end of the tube to a safe place away from water or dust. *

: 48.9 Atmospheric vent port 02 4 x 2.6 Depth 7 or less 20 30 25 8.5 11 R1/4 M5 x 0.8 Thread depth 5 4.2 N02 30 20 NPT1/4 17 Piping port 02: R1/4 N02: NPT1/4 2.5 If there is a possibility that the atmospheric vent port of the switch will be exposed to water or dust, insert a tube into the atmospheric vent port and route the other end of the tube to a safe place away from water or dust. *

LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 Main circuit power supply L2 L2 L3 L3 N P1 P2 N Connect between P1 and P2. (Connected at time of shipping.)

LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 Main circuit power supply L2 L2 L3 L3 N P1 P2 N Connect between P1 and P2. (Connected at time of shipping.)

LECSB1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 L2 L2 Main circuit power supply L3 L3 Regeneration converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.)

LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 L1 Main circuit L2 L2 power supply L3 L3 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. N N P1 P2 Connect between P1 and P2. (Connected at time of shipping.)

(Example) For M3: L1 = 6 mm Applicable shaft types: J, K, T The maximum dimension L2 is, as a rule, twice the thread size. (Example) For M3: L2 = 6 mm Applicable shaft types: J, K, T 2. Q1 = M L2 = L2 + (3 x P) 3. L1 + (3 x P) L2 + (3 x P) 4. L2 = Q2 = M L1 = 5. Q2 = M 6.