9 w !4 CY3B10, 15 !4 !8 !7 !6 !5 !0 i o q u y t r !2 w !1 The above drawing is 15. (3 magnets are used in 10.) CY3B20 to 40 !3 !4 !1 !8 !6 !5 !7 !0 i q o u t y r e w !2 CY3B50, 63 !4 !8 !6 !5 !0 !7 i o q u y t !3 r !2 w !1 Component Parts Replacement Parts/Seal Kit Bore size (mm) 6 10 15 20 25 32 40 50 63 Kit no.
Vertical Mounting L W Mounting orientation W L Maximum speed (mm/s) Up to 100 Up to 200 Up to 300 Up to 400 Up to 500 Up to 600 Up to 800 All strokes Stroke (mm) (1) (2) (3) 8 Selection graph (4) (5) (6) (7) 12 to 40 Horizontal Mounting W W Mounting orientation L Direction for L can be up, down, left, right, or diagonal.
140 Load mass: m (kg) Load mass: m (kg) 180 1000 RLQ 700 800 900 600 125 160 500 MLU 600 140 400 500 125 400 MLGP 300 300 ML1C 200 200 [Example] 100 100 100 500 400 300 200 100 500 400 300 200 Maximum speed: V (mm/s) Maximum speed: V (mm/s) Graph 7 Graph 4 0.5 MPa P 0.5 MPa P 250 4000 3000 3000 200 2000 180 250 2000 160 140 200 1000 125 180 700 800 900 Load mass: m (kg) Load mass: m (kg
Load movement time: t (S) 5 4 3 1600 st 1400 st 1200 st 1000 st 800 st 600 st 500 st 400 st 300 st Example) 2 1 200 st 0.5 0.4 0.3 V' 100 st 0.2 280 V W 0.1 100 200 300 400 500 Maximum speed: V (mm/s) Cylinder stroke Movement distance of load Find the bore size. Step x 3.
Work W Work W Work W Work W Bracket Cylinder goes up Cylinder goes down Lever basic position Lever locked Lock released With cancel cap With lever detection switch RSQ When the lever stands erect (when the energy is absorbed), the switch turns on a signal that determines the pallet has reached the stop position. (For details of lever detection switch, refer to page 595.)
Application examples Horizontal transfer of workpieces, transfer of tools, low thrust clamping 32 mm Purpose of usage q 8 23 mm 1 kg Purpose of usage w Purpose of usage w 40 mm Purpose of usage w 27 mm 12 A guide with higher rigidity is necessary without 2 kg changing the thrust from the current model.
L1 A1 Mr Static moment Dynamic moment Graph (1) Load Mass: W W W MXJ4 A3 L3 L2 A2 0.10 L3 A3 Rubber stopper Mr Load mass W kg Mp 0.08 My Metal stopper W 0.06 W W 0.04 Mey Mep We 0.02 We L3 L2 A2 0.00 Collision speed V mm/s (Average speed x 1.4) 0 200 100 300 400 500 600 700 A3 MXJ6 Note) Static moment: Moment generated by gravity Dynamic moment: Moment generated by impact when colliding with
Hydraulic fluid Compatibility Standard mineral hydraulic fluid Compatible W/O hydraulic fluid Compatible O/W hydraulic fluid Compatible Water/Glycol hydraulic fluid Phosphate hydraulic fluid Not compatible Consult with SMC. 265 A CHKD Series Theoretical Output Unit: N Operating pressure (MPa) Bore size (mm) Rod size (mm) Operating direction Piston area (mm2) 10 3.5 7 314 3140 1099 2198
400, 450, 500 CA2 Up to 1800 50 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600 -XC4 With heavy duty scraper -XC5 Heat resistant cylinder (10 to 110C) -XC6 Made of stainless steel*3 *4 Up to 2700 63 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600 CS1 80 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600, 700, 800 -XC7 Tie-rod
Handling Technical Material Be sure to read before handling brake positioning system (CE2 + CEU2). 682 CE2 Series Prior to Use Example of Recommended Pneumatic Circuit Horizontal mounting Vertical flat mounting Vertical overhead mounting W W CEP1 CE1 CE2 CE2 ML2B W Note) In the case of light load, regulate head side supply pressure.
9 @2 @0 @1 e w !5 !6 !3 !2 !1 !0 q t r i S u y o !4 !8 !
, 200, 250, 300, 350, 400, 450, 500, 600 80 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600, 700, 800 100 25, 50, 75, 100, 125, 150, 175, 200, 250, 300, 350, 400, 450, 500, 600, 700, 800 Up to 2500 Cylinder model: MDWBD32-50-NW-M9BW Double clevis The manufacturing of intermediate strokes is possible.
4 t w e !5 Rod end male thread CHQB32 to CHQB100 r o !0 y q !2 !1 !4 u t !3 e w !5 Rod end male thread Description Material Note Parts List Replacement Parts: Seal Kit No. Bore size (mm) Seal kit no.
Positioning pin hole Counter-clockwise 5 Adjustment bolt A 5 (For counter-clockwise rotation end adjustment) 9 22 e B port .5 g Adjustment bolt B n ra (For clockwise rotation end adjustment) nt e e m is st w u k dj c lo a e is -c d w C A port B port n k er c lo o e l Clockwise C a nt c n dj k u o w o 0 u ti is C st ta e 19 m ro ro ta e ti o d n n e nt e ra ng n g e 5 9 ra With adjust bolt
25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600 2000 2000 2000 2000 2000 2000 2000 32 40 50 63 80 100 125 Minimum Stroke for Auto Switch Mounting 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600, 700, 800 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600, 700, 800 Refer to Minimum Stroke for Auto Switch Mounting on page 54.
63 1900 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600 80 1900 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600, 700, 800 100 1900 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600, 700, 800 2000 125 Intermediate strokes are available.
2000 63 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600 2000 80 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600, 700, 800 2000 100 25, 50, 80, 100, 125, 160, 200, 250, 320, 400, 500, 600, 700, 800 2000 Intermediate strokes are available. *1 Please consult with SMC for longer strokes.
W L In case the product is installed on the ceiling, regard the mounting bolt pitch as L. W L Mounting hole W Intermediate support mounting hole L L Distance between Load and Supports Mounting hole 140 130 25 120 CY3B CY3R 110 100 CY1S 90 4. When a 25 mm adjustment bolt is selected, the mounting holes will be hidden behind it. Adjust the adjustment bolt after the cylinder is installed.
0 o w !6 !5 !4 !3 y r t !1 A A Enlarged view of A Component Parts Description No.