Rod trunnion, Head trunnion Clevis Bore LT XC NH AO AU TR LG AE AB XZ XV TZ TM TD e8 UW TT CD H9 8 24 13.1 20 1.5 12.5 2.5 64 8.1 4.5 65 13 38 26 4 20 6 4 10 24 13.1 20 1.5 12.5 2.5 64(71) 8.1 4.5 65(72) 13 38 26 4 20 6 4 12 27 18.5 25 2 15 3.2 75(79) 12.1 5.5 76(80) 18 58 38 6 25 8 6 16 27 18.5 25 2 15 3.2 82(82) 12.1 5.5 82(82) 18 58 38 6 25 8 6 20 30 24.1 32 4 20 4 95 16.1 6.6 90 20 66
70 95 125 60 32 M8 x 1.25 1/8 104 12 38 67 4 11 8 7 M12 x 1.75 depth 21 45 82.5 115 150 75 38 M8 x 1.25 1/8 115 12 47 T U V W WH W X Y Z Bore size (mm) 20 25 32 40 30 16 112 53 50 23 30 146 182 30 20 132 63 60 25 37 167 199 25 20 132 63 60 28.5 37 167 202 20 25 162 73 70 33 44 210 227 Without Rear Plate Stroke range (mm) Long Stroke R Z Y Bore size (mm) 20 25 32 40 Bore size (mm) 20 25 32
35% to 85% 5 to 20 60% to 95% Lead 16: LEY32A 112 Force [lbf] 21 to 50 60% to 85% 21 to 50 80% to 95% 90 1 to 4 20% to 65% 1 to 4 40% to 95% 67.4 LEY25lA LEY25l 5 to 20 35% to 65% 5 to 20 60% to 95% 45 21 to 35 50% to 65% 21 to 35 80% to 95% 22.5 1 to 4 20% to 85% 030 40 50 60 70 80 90 LEY32l 5 to 20 35% to 85% Set value of pushing force [%] 21 to 30 60% to 85% Max. 85% Note) For the vertical
Power supply cable (LEC-CK1-1) is an accessory.
Note 5) For command pulse input with an open collector method.
A b Initializing A driver fault occurred or an error took place in communication with the servo system controller. In this case, the indication changes. "Ab " "AC " "Ad " "Ab " The servo system controller is faulty. .
Note 5) For command pulse input with an open collector method.
An SSCNET III cable was disconnected. "Ab" is displayed in the corresponding axis and following axes. Replace the SSCNET III cable of the corresponding axis. Check if the connectors (CNIA, CNIB) are unplugged. Connect it correctly. The power of the driver was turned off. "Ab" is displayed in an axis and the following axes. Check the power of the driver. The driver is malfunctioning.
, during an intermediate stop with a 3 position closed center or perfect type valve.
An SSCNET III cable was disconnected. "Ab" is displayed in the corresponding axis and following axes. Replace the SSCNET III cable of the corresponding axis. Check if the connectors (CNIA, CNIB) are unplugged. Connect it correctly. The power of the driver was turned off. "Ab" is displayed in an axis and the following axes. Check the power of the driver. The driver is malfunctioning.
to 50 M N Bracket (See table below.) 4-O T Q 2-P AH AG B S W K U L AA AL AB A I J AI AJ 4-AK hole V AP R Y + Stroke Z + Stroke X AG For 4-AO AN AI Cutout window AM Mounting dimensions For standard strokes (mm) Bore size (mm) Stroke range (mm) O N M L K J I B AP AO AN AM AH AG AB AA AL AK AJ AI A 20 25 32 40 50 75, 100, 125, 150, 200 M6 x 1 depth 9 45 25 80 60 55 30 108 25 M6 115 65 125 112
Description 10 20 30 50 Seal kit P523010-20 P523020-20 P523030-20 P523040-20 No. Description Qty. No. Description Qty. No. Description Qty. No.
For details, refer to pages 3-7-19 and 3-7-20.
Local Area: (800) 258-9200-www.stevenengineering.com AL Width across flats 12 Element Width across flats XA Unlocking cam AP V I 4-AK hole Q PL PG J AI AJ R AB X A AG AA Y + Stroke Z + Stroke For 4-AO AN AI AM Cutout window Mounting dimensions Standard Stroke Bore size (mm) Stroke range (mm) A AA B I J K L M N GC GK GL GQ GR AB AG AH AI AJ AK AL AM AN AO AP 20 75, 100, 125, 150, 200 129 12
, 14, 16, 18, 20, 24, 28 Example: NCDA1B150-0200R+0300-XC11 will stroke 2" then an additional 3" for a total stroke of 5".
1, 2, 3, 4, 5, 6, 8, 10, 12, 14, 16, 18, 20 1, 2, 3, 4, 5, 6, 8, 10, 12, 14, 16, 18, 20, 24 1, 2, 3, 4, 5, 6, 8, 10, 12, 14, 16, 18, 20, 24, 28 Example: NCDA1B150-0200R+0300-XC11 will stroke 2" then an additional 3" for a total stroke of 5".
Rod clevis: GKM (ISO 8140) l1 [mm] Bore size [mm] Part no. e b d f h11 (Shaft) f H9 (Hole) l1 c (Min.) a (Max.) 32 GKM10-20 M10 x 1.25 10+0.5 +0.15 40 10 10 52 20 20 40 GKM12-24 M12 x 1.25 12+0.5 +0.15 48 12 12 62 24 24 50, 63 GKM16-32 M16 x 1.5 16+0.5 +0.15 64 16 16 83 32 32 80, 100 GKM20-40 M20 x 1.5 20+0.5 +0.15 80 20 20 105 40 40 125 GKM30-54 M27 x 2 30+0.5 +0.15 110 30 30 148 54 55
EB R W MF FB CD L UB CB MR TR AO AT XA SA AH AB TF UF E2 ZF XD H9 h14 H14 48 55 67 80 100 120 38 46 52 62 63 75 16 20 25 25 30 35 10 10 12 12 16 16 7 9 9 9 12 14 10 12 12 16 16 20 65 75 80 90 110 140 12 15 15 20 20 25 45 52 60 70 90 110 26 28 32 40 50 60 26 28 32 40 50 60 9.5 12 12 16 16 20 32 36 45 50 63 75 10 11 12 12 14 16 4.5 4.5 5.5 5.5 6.5 6.5 214 240 264 293 346 381 212 238 259 288
15 12 170 80 80 50 50 12 5.5 10 185 190 90 20 20 87 28 97.5 129.5 50 100 9 80 120 25 12 170 70 40 40 16 20 16 190 90 100 63 63 14 6.5 12 210 215 110 20 20 110 34 110 150 63 126 12 100 153 30 16 190 90 50 50 16 20 16 210 110 120 75 71 16 6.5 14.5 220 230 132 25 25 136 40 120 160 75 150 14 120 178 35 16 205 110 60 60 20 25 20 230 140 Max. 8 Max. 157 Max. 25 Max. 160 Max. 157 Max. 224 Min.
+Stroke MF Rod side mounting (F) W MF Head side single clevis style (C) Head side double clevis style (D) CD H9 CB H14 UB h14 0.2 0.6 EW L MR XD+Stroke Bore (mm) EW-0.2 -0.6 E1 EB R W MF FB CD L UB CB MR TR AO AT XA SA AH AB TF UF E2 ZF XD H9 h14 H14 48 55 67 80 100 120 38 46 52 62 63 75 16 20 25 25 30 35 10 10 12 12 16 16 7 9 9 9 12 14 10 12 12 16 16 20 65 75 80 90 110 140 12 15 15 20 20