SMC Corporation of America
Elite Part Number Search
Search Results "CNA2B40-800-D"

(n1) x 0.402 Ejector/Manifold ZZB-SM5 ZB0030-K1L(O)Vacuum pump system/Manifold ZZB-SM5 ZB31-Q1L(O)E F E F 1 Stations n D side U side 1 Stations n D side U side Vacuum pressure switch Vacuum pressure switch Vacuum pressure switch Vacuum pressure switch PV PD PV PD Port open to atmosphere PV PD PV PD Port open to atmosphere Port open to atmosphere Port open to atmosphere Supply valve Supply

D-A9V Solid state switches D-F9 D-F9V 2 color indication solid state D-F9W D-F9WV MXQ 6 MXQL 6 6 MXQ 8 MXQL 8 8 MXQ12 MXQL12 12 MXQ16 MXQL16 16 MXQ20 MXQL20 20 MXQ25 MXQL25 25 Function Options Adjuster Options With Buffer Mechanism With End lock Protects work pieces and tools, etc., by eliminating impact at the end of the extension stroke Buffer unit is auto switch capable Holds

mounting dimensions A (Port size) Y W C B Q V K OUT OUT IN IN Z Plate thickness AR20(K)-B to AR30(K)-B: Max. 3.5 AR40(K)-B : Max. 5 R F P2 S (Pressure gauge port size) Bracket (Option) U M J D T N AR50(K)-B/AR60(K)-B 2 x P1 A (Port size) B Q C K OUT IN R F P2 S (Pressure gauge port size) Bracket (Option) T N J M D U 75 Regulator AR10-A Series Regulator AR20-B to AR60-B Series Regulator with

Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-12 Connection of RS-232C HRS-R Series 3.3 Installation 3-19 HRX-OM-W058 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.

Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-12 Connection of RS-232C HRS-R Series 3.3 Installation 3-19 HRX-OM-X027 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.

Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-11 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-O021 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.

Configuration One thermo-chiller for one master. 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-9 Connection of RS-232C 3.3 Installation HRR Series 3-18 HRX-OM-X084 Chapter 3 Transport and Setting Up 3.4 Piping Piping port size Connect piping firmly.

P1 (D-sub 25P female) Cap P2 (D-sub 9P female) P3 (D-sub 9P male) Not used. (Only for maintenance) Power cable Contact signal cable Serial RS-485 communication cable Figure 3-10 Power Cable Insertion and Communication Cable Connection Correct phase rotation is required when attach the power cable to the breaker terminal.

Suite D Poway, CA 92064 Tel: (858) 679-1903 Fax: (858) 679 1904 SMC Pneumatics Inc. (Indianapolis) 3011 N Franklin Road Indianapolis, IN 46226 Tel: (317) 899 4440 Fax: (317) 898 4808 SMC Pneumatics Inc. (Boston) Zero Centennial Drive Peabody, MA 01960 Tel: (978) 326 3600 Fax: (978) 326 3700 SMC Pneumatics Inc.

D I N 'E Terminal 'T Conduit Temlnal 'H 24' Lead hing 01 %'(AXSrd.) t M5 NOM 10-32 ilanual Overrida _Recessed, Nonlocking (Std.)

E A F B C D Position For transporting a workpiece to a specific position Pushing For applying force to a workpiece or for measuring the size of a workpiece E A C F B D Setting completed (Download) Step 4 Step 3 Setting of operating conditions -Entering of the operating valuesAfter the operating conditions have been set, Click the [Download] button to complete the settings.

rain O utlet D rain S eparator C apillary Tube C om pressor C ondensor P ressure.

D-SMC, P-63 (M) 2nd printing September 1996. D-SMC, P-59(YG) March 1997. 29(YG) Printed in Japan.

Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Fig. 3-11 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-W038 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly. Incorrect piping might cause leakage of supplied or drained leakage and wet surrounding area and facility.

P2 (D-sub 9P female) Serial RS-485 communication cable P1 (D-sub 25P female) Contact signal cable Figure 3-12 Signal line mounting 3.3 Procedure for Installation HRZ Series 3-14 HRX-OM-X010 Chapter 3 Transporting and Installation 3.3.6 Installation of circulating fluid and facility water piping Regarding the circulating fluid and facility water pipings, consider carefully the suitability

*1 Fo r mo tor type S 2 and S6, note that the com patible driv er part number suffix is S1, S5. *3When v acuum ov er 50L/m in( ANR), select D. *2 (4) S troke [mm] Standard Produced upon receipt of order 300 200 400 500 600 700 800 900 1000 1200 1500 Str o k e (m m ) Ty pe LEJS40 LEJS63 *2Strok es other than standard and produced up o n receipt o f order are available as special orders,

Fitting screw size: M2.60.45 P3 (D-sub9 female receptacle) Cap P2 (CH2 D-sub25 female receptacle) P1 (CH1 D-sub25 female receptacle) Power cable Serial RS-485 or RS-232C cable Ferrite core(accessory) Rear CH2 contact signal / Analog cable CH1 contact signal / Analog cable Figure 3-8 Power Cable Insertion and Communication Cable Connection Do not drop a screw or washer in the electrical unit

An application which has the possibility of having negative effects on people, property, or animals, requiring special safety analysis. d. When used in an interlock circuit, dual interlock such as mechanical protection is necessary in case of accident. Periodical inspection is also necessary to confirm proper operation.

Cap P1 (D-sub 25P female) P2 (D-sub 9P female) P3 (D-sub 9P male) Not used. (Only for maintenance) Power cable Contact signal cable Serial RS-485 communication cable Figure 3-7 Power Cable Insertion and Communication Cable Connection Correct phase rotation is required when attach the power cable to the breaker terminal.