, D-F9WV D-F9P B, D-F9W D-A9V D-F9N D-F9V Number of auto switches 2 pcs. 15 (0.6) Note) 20 (0.80) Note) 10 (0.4) 10 (0.4) 5 (0.2) 10 (0.4) Note) 15 (0.6) Note) 20 (0.80) Note) 5 (0.2) 5 (0.2) 1 pc.
1 3 0 s.sll as6 I +s (84) (103) (122) 7.05 I 7.8 8.54 (17e) (198) (217)s.zg lro-oa 1o:g (236) (255) 1274) 1 1 . 5 4 r 1 2 . 2 8 (141) (160) Body Ported (Top Ported) /Type 21 Manifold NVV3KF3-21 -Stations-007 inch (mm) Lr Dimensions n: Stations 20 1 r v L-'-Ll I 1 0 1 1 10.79 11.54 12.28 (274) (2s3) (312) 4.8 5.55 (122J \141) (179) (198) 15.28 {388) t2 0ilnffision$ $mim llUlff 300 Base Mounted
Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-10 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-M090 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.
HOW TO ORDER N V F 1 1 0 H s D Z O 0 1 T F T T Opo.afing Pressure -J I 0 100 psi (CrP.055) | ' H 0 r 150 psi (C\p.05) | Solen
IDX-OM-W026-A / Series IDF22E-20(-A,C,K,L,M,R,T) IDF22E-30(-A,C,K,L,M,R,T) IDF37E-20(-A,C,K,L,M,R,T) IDF37E-30(-A,C,K,L,M,R,T) IDF55E-30(-A,C,L,M,R,T) IDF75E-30(-A,C,L,M,R,T) URLhttps://www.smcworld.com/ English instruction manual can be downloaded from our URLhttps://www.smcworld.com/ SMC ISO4414 *1) JIS B8370 *2 ) *1) ISO4414Pneumatic fluid power General rules and safety requirements
Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-10 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-R016 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.
Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-11 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-R005 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.
The button is to increase and the button is to decrease the set value. 2 B D D Press the button continuously to keep increasing the set value. Connecting/Disconnecting When mounting the connector, insert it straight into the socket, holding the lever and connector body, and push the connector until the lever hooks into the housing, and locks.
How to Order AD402 04 A D Semi-standard symbol: When plural options are required, indicate them in alphanumeric order.
Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-11 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-O021 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly.
When the volume of oil reaches a certain level, float e ascends, valve t descends via lever r, nozzle w closes, and the feeding of oil stops, thus completing the oil feeding process. When the oil inside the case is consumed, float e descends, valve t ascends via lever r, allowing oil to be fed from nozzle w.
:llv thn alphabtic:lly (Ex.: 27N.40(40/,m), 2N R Body g Port orl.d.--64, r NNFT Construction./Parts List Main Parts Parts List 1 1074-58 1 1 1 1r 1 636 NC4otr r 1185 l t l Series NAF Air Filter Float Type Flow Characteristics NAF5OOO N.O tvpe/ NAD44 With no pressure inside the bo!
Configuration 1 master : 1 thermo-chiller 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Fig. 3-11 Connection of RS-232C 3.3 Installation HRS Series 3-16 HRX-OM-W038 Chapter 3 Transport and Setting Up 3.4 Piping Connect piping firmly. Incorrect piping might cause leakage of supplied or drained leakage and wet surrounding area and facility.
4-wlre Internal Circuit and Wiring "26 analog output type "27 type NPN open collector "67 type PNP open collector 1---Red POlVer supply + Term~1 [ Rsd Power supply + Terminal , I I I + I I I I I I I I 12-24VDC I I : I l LED(Redj 13;D; r:.S.f*,3o'!
0 q 4 Series LVR Dimensions Integral ttings/LQ3 4 x 7 Mounting hole 1/8 (Rc, NPT) Pilot port A H D B G Model A B C D E LVR20-Z07(06) 40 40 49.3 68 20.1 LVR40-Z11(10) 82.5 82.5 89 115 33 LVR40-Z13(12) 82.5 82.5 89 115 33 LVR50-Z19 100 100 117.5 135 45 Breathing port M5 x 0.8 IN Model F G H J LVR20-Z07(06) 8 27 56 88 LVR40-Z11(10) 14 64.5 100 150.5 LVR40-Z13(12) 14 64.5 100 159.5 LVR50-Z19
D 2. Leakage voltage Caution Take note that the leakage voltage will increase when a resistor is used in parallel with a switching element or when a C-R circuit (surge voltage suppressor) is used for protecting a switching device because of the leakage voltage passing through the C-R circuit. The suppressor residual leakage voltage should be as 3% or less of the rated voltage. 3.
The used of turbine oil at temperatures lower than 0C leads to increased viscosity and may cause the valve to malfunction. d n i n i W g c e t i r o i d n e p a t e p i P Leakage Voltage It must be noted that when connecting C-R element parallel to switching element, leakage current flows through C-R element and the leak voltage increases. 2 thread to be left exposed Clamping Torque Switching
Conduit Current Type 2-wire: 4-20mA Current Type 2-wire: DIN cuffir tp6 2-'n6 qr: rlplr .rsmr and por alpdy or {-2oln^l Voltage 3-wire: 0-5V,0-10V Input impedance: 30(KQ) Voltage 3-wire: Input signal oI 0-5,0-10(V) Power supply of 12-15(V) xPlease be sur !
(Pairing) Red/green 24 V (Control and input) 24 V (Control and input) 1 1 FRANCE (33) 1 6476 1000 Orange LED is ON.
Hardware failure) 1 24 V (Output) 1 24 V (Output) HUNGARY (36) 23 513 000 OFF PROFINET communication is established. 2 0 V (Output) 2 0 V (Output) Torbgy u. 15-19, 2045 Trkblint, Hungary 3 2 PROFINETcontroller settings and EX600 configuration data do not match. 24 V (Control and input) 24 V (Control and input) 1 2 Red LED flashes. 3 3 4 5 4 1 Red LED is ON.