s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
Material Cover Front rim Retaining rim Description Part no. includes M3 X 8 tapping screws (2 pcs.)
m3/sN02NPT1/4118 g90 gC01Rc1/8114 g86 g1 x 10?5 Pa?m3/s
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
s, Rise time 1 ns1.3 kg (without lead wire)11/2
1.02kgf/cm2j -O.1MPa 1MPa 11 O.2kgf/cm2j MPa, PSI kgflcm2. bar Unit setting mmHg, kPa, PSI kgflcm2 , bar MPa:O.01, PSI:1 kgf/cm2:O.1, bar:O.1 Min. setting range mmHg:10, kPa:2, PSI:O.2 kgf/cm2:O.02, bar:O.02 A variety of switch output modes Note1) J HysteresIs mode Adjustable (2digit or more) Adjustable (3digit or more) Applicable to a hysteresis mode, window comparator mode.and reversed
(Green) Indicator light Load Enclosure IP40 Environment resistance Blue DC () 3.4 3-wire 25AWG 2 m Lead wire with connector 11
Please keep this manual handy for future reference. 11 Connect the M12 connector cable. The M12 SPEEDCON connector connection method is explained below. (1)Align mark B on the metal bracket of the cable connector (plug/socket) with mark A. 7 10 8 1 9 (2)Align with mark C on the unit and insert the connector vertically.
(PORT2) 11 The power supply for output is properly. Green ON PWR(V) The power supply voltage for output is below 19 VDC. (When diagnostic parameter is enabled) Red ON Assembly Either of the following conditions are detected: The unit has not been configured correctly. The PLC is idle state.
Please keep this manual handy for future reference. 11 Connect the M12 connector cable.