SMC Corporation of America
Elite Part Number Search
Search Results "SS5Q13-06LD1-EN"



Note) The start of production dates of the new auto drains (slightly different depending on model) are as follows:
IDF1 to 2E and IDF/IDU3E to 37E: March 2019
IDF/IDU55E to 75E: June 2019
IDH4 and IDH6: March 2019

Confirm the installation position of each device with the “Air Preparation Equipment Model Selection Guide” which can be found here.
Note) The nominal filtration ratings of the elements of each device installed allow for the compressed air required for the application to be created in stages.