SMC Corporation of America
Elite Part Number Search
Search Results "CDLA2F80-1000-E-M9PWSAPC"

200 1000 2 2 50 200 50 200 3 3 CN2 Communication cable PC PC is prepared by customer) Refer to 8CN2 TB/PC Power supply connector(P.23) for usage.

RSH20, 32 Graphq Graphw 1.0 RSH20 RSH32 0.9 Bore size 50, 63, 80/ = 0 Bore size 50, 63, 80/ = 0.1 Operating pressure P [MPa] 0.8 1300 1300 80 0.7 1200 1200 0.6 1100 1100 0.5 1000 1000 0.4 900 900 0.3 63 80 Load weight m [kg] Load weight m [kg] Load weight m [kg] Load weight m [kg] 0.2 800 800 50 0.1 700 700 600 600 0 500 100 200 300 400 63 Lateral load F [N] 500 500 50 400 400 RS1H50, 63,

When used as a switch output device Setting of NPN open collector 2 outputs Setting of PNP open collector 2 outputs Brown DC(+) q Brown DC(+) q Load Black OUT1 r Black OUT1 r Load Main circuit Main circuit + + 12 to 24 VDC 12 to 24 VDC White OUT2 w White OUT2 w Load Load Blue DC() e Blue DC() e When used as an IO-Link device Brown L+ q L+ Black C/Q r Main circuit C/Q IO-Link master White

Water bath Q = T x V x x C h x 60 x 1000 10 x 2 x 1 x 103 x 4.2 x 103 20C V = 15 x 60 x 1000 After 15 min, = 93.3 W cool 30C down to 20C.

Actuator driving system Inside of clean room w t e q r t q Cylinder relief port piping w Solenoid valve exhaust piping e Breathing piping of regulator r Drain piping t Exhaust Cleaner for Clean room/AMP series Cylinder relief port piping Series 10-/12-/21(atmospheric release type) Connect the relief port piping with the dedicated duct piping installed outside the clean room or with the exhaust

(A) 2 (A) 2 1 (P) 3 (R) 1 (P) 3 (R) q w e r q w e r N.O. N.O. (A) 2 (A) 2 1 (P) 3 (R) 1 (P) 3 (R) Component Parts No.

Determination of load's kinetic energy (E) bore size E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 8-16-8.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 8-16-8.)

Material: Chrome molybdenum steel (nickel plated) mm Bore size (mm) YA 03 B D E F M T1 T2 Part no.

Determination of load's kinetic energy (E) bore size E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 8-16-8.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 8-16-8.)

N06 NPT3/4 5/16(inch) N04 2xNPT1/2 6) 5 DC24V *1G JIS B0202 ISO1603 ISO1179 8) Z 7 L L 0.3(m) 11) A NPN LO B PNP M M 0.3(m) MO 12) 9) M SI (kPa) D P (:psi) E 10) 14 GN (G) B G *7ZL212 27mm ZL212 (2 /1 , 4 ) E (2 ) F (2 ) V (1 ) 13 G 2m) W (2m) 5 No.ZL3-OM00801-A 2. 2.1 (1/P) (2/V) ZL3 ZL6 (3/E) // / (G) (2/V) 2.2 ZL6 1 ZL6 (ZL6-SC1-A) 2), 6 No.ZL3-OM00801-A 3. 3.1

supply field wireable connector (7/8 inch) q End Plate Bracket e Reinforcing Brace This bracket is used for the end plate of DIN rail mounting.

Determination of load's kinetic energy (E) E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 1548.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 1548.)

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 200mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: SAPC (0.5m Cord Length, M8-3 Pin Connector)

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 100mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewied Connector: L (3m)

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 100mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: SAPC (0.5m Cord Length, M8-3 Pin Connector)

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 150mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewied Connector: L (3m)

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 150mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewied Connector: SDPC (0.5m Cord Length, M12-4 Pin Connector)

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 200mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen.

Magnet: D (Built-in), Mounting: F (Front Flange), Style: Aluminum Tube, Bore Size: 80mm, Thread: Rc, Stroke: 200mm, Option: w/o Rod Boot, Cushion: Both Sides (Air-hydro has No Cushion), Lock Operation: E [Spring Lock (Lock Exhaust)], Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewied Connector: SDPC (0.5m Cord Length, M12-4 Pin Connector)