JIS B 8370: JIS B 8361: JIS B 9960-1: -((1 :) JIS B 8433-1993: *2) : : : 1 2. 3. 1. 2. 3. 4. 2 2 - No.ZB-OM00301 3 1 1 *3) 1 1 () () () 3 - No.ZB-OM00301 () () 4 - No.ZB-OM00301 () * JIS B 8392-1 2.4.32.6.3 () 5 - No.ZB-OM00301 * F.G.
Secure either Body (A) or Body (B) and push out Vane Shaft , then separate Body (A) from Body (B). Remove Vane Shaft , Stoppers and . [How To Assemble] Mount O-ring and Vane Shaft to Body (B) . Mount Stopper Packing to Stopper . Mount Stoppers and to Body (B) . (Note: Be careful of stopper position) Insert Body (A) into Vane Shaft .
E: Emitter C: Collector B: Base B: Base Load Electrical appliance connected to the output, e.g. relay, solenoid, etc. E: Emitter C: Collector Fig.2 NPN type Fig.3 PNP type Operating humidity range Humidity range for proper operation of equipment. Load current Current flow through the electrical appliance once the output is energized.
Fixing to the DIN rail Place the DIN rail in the groove B and tighten the hexagon socket head cap screw. Tightening torque: 0.61 to 0.63 Nm Step 1 B Step 2 Hexagon socket head cap screw 4) Manifold mounting The spacers packed together with the parts set must be used for assembly. Their purpose is to create a common ground connection.
A B 10 20 20 40 B B B 25 45 A A 30 55 Detection hole Detection hole 40 65 50 75 Electrified object Electrified object 60 90 70 100 75 105 (2) After installation, confirm if electrified potential is correctly measured. (Unit: mm) Detected value of electrified potential depends on ambient installation conditions. Confirm detection condition of sensor electrified potential.
Operating Pressure MPa How to Order 2 TH0425 TH0806/TH1075/TH1209 TH0604 Metric size TH0604 N 20 1 TH1008/TH1210 Length per roll Indication of tubing model Roll size 20m roll 100m roll Symbol 20 100 0.5 Color indication 0 -20 0 20 40 60 80 100120140160180200 Color Symbol N R BU B Translucent Red (Translucent) Blue (Translucent) Black (Opaque) Operating Temperature C Note) The maximum operating
ZSE4 ISE4 ZSE5 ISE5 Detection nozzle: 1.0 Piping: 6 X 4 tubing Supply pressure: 0.1MPa Detection distance: 100m ZSE6 ISE6 Detection nozzle: 1.0 Piping: 6 X 4 tubing 5m Supply pressure: 0.2MPa ZSE3 ISE3 4.0 2.5 Set value 50m 300m 100m 200m GS 2.0 3.5 PS Response time (sec) 1.5 3.0 ISA 1.0 2.5 ZSE1 ISE1 Response time (sec) Piping length 0.5 ZSE2 ISE2 2.0 10m 8m ZSP 50 150 0 1.5 100 200 250
Insulation resistance 100M or more at 500VDC 1500VAC for 1 min.
1-C 2-A 2-B 1-C 2-B 1-C 2-B 1-C 2-B 1-C 2-B 1-C 2-B 1-C 2-B 1-C 2-B 1-C 2-B 1-C 2-B 2-B 2-B 1-A 1-B 1-C 2-A 2-B 1-C 2-A 2-B 2-B 2-B 2-B 2-B 1-A 1-B 1-C 2-A 2-B 2-B 2-B 2-B 2-B 2-B Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com 6 1/8, 1/4 500 1.5 0 1,000 2,000 3,000
B 89 A A B Section BB Coupling P.C.D.
27.5 B 17 19 18 23.5 A 13.5 11.5 18.5 23 B 12.5 14.5 13.5 19 B 9 11 10 15.5 B 7 9 8 13.5 B 13 15 14 19.5 A 14.5 12.5 19.5 24 B 13.5 15.5 14.5 20 B 7.5 9.5 8.5 14 B 10.5 12.5 11.5 17 B 7 9 8 13.5 A 8 6 13 17.5 A 14 12 19 23.5 A 8.5 6.5 13.5 18 A 11.5 9.5 16 21 A 8 6 13 17.5 20 25 32 40 Note) When setting an auto switch, be sure to check its operation before adjusting.
U B A Approx. U A B D-A7H D-A80H D-F7 D-J79 D-F7W D-J79W D-F7F D-F7NTL D-F7BAL SMC SMC Approx. U Approx. U Approx. U SMC SMC Approx. U A B B A Approx. U D-A73C D-A80C D-J79C B A A B Approx.
(ZP)[1][2][8][0]17bit 14 37 14 (5) ON/OFF((DO)) ON/OFF [9][0] (a) DO [8][B][0][0]0004DO 0 0 0 4 4 DO (b) ON/OFF [9][2] [A][0] b31 b 1 b 0 1 ON 0 OFF bit 16 bit CN6 bit CN6 bit CN6 bit CN6 0 14 8 16 24 1 15 9 17 25 2 16 10 18 26 3 11 19 27 4 12 20 28 5 13 21 29 6 14 22 30 7 15 23 31 (c) DO DO[8][B][0][0] [8][B] [0][0] 0 DO 14 38 14 (6) (a) [8][B][0][0]0003 0 0 0 3 3 (b) ([8][B]
A B B B A B A B A B A B A 20 25 32 40 6.5 5.5 10.5 9.5 1 0 6 4 3 0.5 0 6 5 2.5 1.5 7 6.5 5.5 10.5 9.5 1 0 6 4 3 0.5 0 6 5 2.5 1.5 7 7.5 6.5 11.5 10.5 2 1 7 5 4 1.5 0.5 7 6 3.5 2.5 8 13.5 11.5 17.5 15.5 7 6 12 10 9 6.5 5.5 12 11 8.5 7.5 13 Note) Adjust the auto switch after confirming the operating conditions in the actual setting.
C D Side support B MY-S B 2-J E C D A B J M4 x 0.7 M5 x 0.8 M6 x 1 M8 x 1.25 C 15 25 35 45 E 4.9 6.4 8 11.7 F 3 4 5 6 H 3.4 4.5 5.5 6.6 A 61 67 81 100 120 142 172 G 6.5 8 9.5 11 D 26 38 50 64 B 71.6 79.6 95 118 142 164 202 Applicable cylinder MY1M16 MY1M20 MY1M25 MY1M32 MY1M40 MY1M50 MY1M63 Model MY-S16A B MY-S20A B MY-S25A B MY-S32A B MY-S40A 55 14.8 8.5 9 14 M10 x 1.5 80 B MY-S63A 70 18.3
Technical data 595 Series CQSS Proper Auto Switch Mounting Position (Detection at stroke end) Non-rotating rod a) b) Mounting 16 to 25 12 a) b) Mounting D-A9 D-A9V Hs Hs D-M9 D-M9W D-M9AL D-M9V D-M9WV D-M9AVL Hs Hs Proper Auto Switch Mounting Position Auto switch model Bore size (mm) A B W B W A B A Hs Hs B A D-A9V D-M9V/M9WV/M9AVL D-M9/M9W D-A9 12 16 20 25 5.5 4.5 19.5 5.5 17 5.5 4.5 1.5