Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: K + S
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: A + K + T
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: K + T
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: A + B + K
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: High-pressure Pump Mounted
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: A + B1 + K + M
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: K + M
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: A + K + M + S
Cooling Capacity: 25kW, Thread: NPT, w/Rc-NPT Conversion Fitting, Option: w/Earth Leakage Breaker
$2 are for 20 to 40.
. 9-11 9.4.1 HRR012-A/W-10/20. 9-11 HRR Series HRX-OM-W002 Contents 9.4.2 HRR018-A/W-10/20. 9-11 9.4.3 HRR024-A/W-20. 9-12 9.4.4 HRR030-A/W-20. 9-12 9.5 Heating capacity . 9-13 9.5.1 HRR012-A/W-10-,HRR018-A/W-10-. 9-13 9.5.2 HRR012-A/W-20,HRR018-A/W-20 . 9-13 9.5.3 HRR024-A/W-20,HRR030-A/W-20 . 9-13 9.6 Pump capacity. 9-14 9.6.1 HRR012/018/024/030-A/W. 9-14 9.6.2 HRR012/018-A/W-10-T/MT .
Model number: HRR010-AN/WN-10/20 The transition connector from Rc to NPT is enclosed as an accessory. For NPT piping, be sure to use this connector. Model number: HRR010-AF/WF-10/20 The transition connector from Rc to G is enclosed as an accessory. For G piping, be sure to use this connector.
The bore size is 25, so the allowable load by thrust will be 20 kg. Work load is 5.5 kg < 20 kg. OK The load is restricted to 20 kg when the stroke is 600 mm and Z = 100 mm taken from Graph (5) z (Refer to page 1495). (2) Allowable load by stroke Work load is 5.5 kg < 20 kg.
Model number: HRR050-AN/WN-20/40The transition connector from Rc to NPT is enclosed as an accessory. For NPT piping, be sure to use this connector. Model number: HRR050-AF/WF-20/40The transition connector from Rc to G is enclosed as an accessory. For G piping, be sure to use this connector.
As the circulating fluid temperature at this time is 20 oC, "AS.06" starts alarm monitoring at the same time as the operation start. Status (2): The circulating fluid temperature becomes within the set range of "AS.04", and starts "AS.04" alarm monitoring.
As the circulating fluid temperature at this time is 20 oC, "AS.06" starts alarm monitoring at the same time as the operation start. Status (2): The circulating fluid temperature becomes within the set range of "AS.04", and starts "AS.04" alarm monitoring".
End Lock Cylinder Series CBM2/20, 25, 32, 40 Series CBA1/40, 50, 63, 80, 100 CL Prevention of dropping at the rising end Locking of door MLG With front lock With rear lock CNA CNG MNB CNS Maintains the cylinders original position even if the air supply is interrupted.
CB At 0.05MPa except for lock part. CV/MVG Lock Specifications CXW Lock position Rear end, Front end, Both ends 20 215 25 330 32 550 40 860 Holding force (Max.)
Cooling Capacity: 150 (15.7kW), Thread: N (NPT, w/Rc-NPT Conversion Fitting), Option: AT (A + T)