SMC Corporation of America
Elite Part Number Search
Search Results "CDJP2B6-10D-B-A90"

Magnet: Built-in, Mounting: Basic, Bore Size: Ø6 mm, Stroke: 10 mm, Rod End Thread: With Thread, Auto Switch: A90--Reed, DC Volt >5<24, AC Volt <100, LED, 2 Wire, 0.5M, Lead Wire or Prewired Connector: -, Number: -, Option: -

This is a legacy product, and replaced byCDJP2B6-10D-A90

(mm) C D MHZ2-10D-X46 MHZ2-16D-X46 MHZ2-20D-X46 MHZ2-25D-X46 Model A B D9 4.5 11 5.2 7.5 7 13 5.8 2010 7 15 6 10.7 7 20 6.2 Dimensions other than the above are identical to the standard type; refer to pages 12-2-33 to 12-2-36. Reference values to establish criteria for needle adjustment.

(mm) C D MHZ2-10D-X46 MHZ2-16D-X46 MHZ2-20D-X46 MHZ2-25D-X46 Model A B D9 4.5 11 5.2 7.5 7 13 5.8 2010 7 15 6 10.7 7 20 6.2 Dimensions other than the above are identical to the standard type; refer to pages 12-2-33 to 12-2-36. Reference values to establish criteria for needle adjustment.

Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.

Rod side mounting/Without auto switch Head side mounting/Without auto switch C D Mounting bolt Model C D Mounting bolt Model CQSB12-5D -10D -15D -20D -25D -30D CQSB16-5D -10D -15D -20D -25D -30D CQSB20-5D -10D -15D -20D -25D -30D -35D -40D -45D -50D CQSB25-5D -10D -15D -20D -25D -30D -35D -40D -45D -50D CQSB12-5D -10D -15D -20D -25D -30D CQSB16-5D -10D -15D -20D -25D -30D CQSB20-5D -10D -

M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C

M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C

C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-M9W D-M9V D-M9WV D-M9 D-M9W D-M9V D-M9WV D-M9 D-M9W D-M9V D-M9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E 16.5 25 4.5 18.5 49 6.5 7.5 38 21 MIW8-8D MIS12

D-Y7 W N B D-Y7BA D-Y69 A B D-Y7 WV N B Protrusion [mm] In-line Perpendicular A B D-Y59 O MHW2-20D S 7 12 5 12 12 O MHW2-25D S 7 11 5 10 11 O MHW2-32D S 4 9 2 8 9 O MHW2-40D S 3 8 1 7 8 Hysteresis Switch operating position (ON) O MHW2-50D S 1 6 5 6 Switch return position (OFF) N B D-Y7BA Auto switch model No. Gripper model No.

Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.

Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com c B part e f d 2.

MHL2-10D MHL2-16D MHL2-20D MHL2-25D MHL2-32D MHL2-40D 0.3 0.8 0.4 0.5 0.7 0.5 Auto Switch Mounting Bracket: Part No. 0.6 0.5 Auto switch part no.

60204-1: Safety of machinery -Electrical equipment of machines (Part 1: General requirements) ISO 10218-1992: Manipulating industrial robots-Safety JIS B 8370: JIS B 8361: JIS B 9960-1: -1 ) JIS B 8433-1993: *2) 1. 2. 3. 1. 2. 3. 4. 3 180 / 1 1.5 *3) *3)1 1 () 4 1. 1-1.

When closed 8.8 When open 22.8 7 Standard Type/Series MHZ2 Finger Position/Options Side Tap Mounting Type [1N1] Through Hole in Opening/Closing Direction [2N2] 4-MM Attachment mounting thread C C B A 4-H Attachment mounting hole S S O O B A Unit: mm Unit: mm Model A 3 4 5 6 Model A 3 4 5 6 B 5.7 7 9 12 C 2 2.5 4 5 MM M2.5 x 0.45 M3 x 0.5 M4 x 0.7 M5 x 0.8 B 5.7 7 9 12 H 2.9 3.4 4.5 5.5 1

1.5~2 SMC AF AR 4. 4-1 13 - 4-2 1 15 2 16 3 17 B 4 18 5 19 6 20 7 21 U 8 22 R 9 A 23 C 10 B 24 11 A 25 12 13 14 MHL2-10D MHL2-16D MHL2-20D MHL2-25D MHL2-32D MHL2-40D 26 27 28 29 30 NBR MHL10-PS MHL16-PS MHL20-PS MHL25-PS MHL32-PS MHL40-PS ) 262627282930 1 14 - 4-3 1 U U 2 R B B R 3 15 - 4-4 1 2 O O O 3 16 - Revision history 4-14-1, Sotokanda, Chiyoda-ku

D-F9WV D-F8 Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E 18.5 31 6.5 20.5 41 8.5 20.5 33 4.5 17 20.5 31 4.5 15 20.5 41 4.5 15 20.5 51 4.5 35 22.5 43 6.5 27 22.5 33 6.5 17 22.5 43 6.5 27 22.5 53 6.5 37 MIW12-12D MIW20-20D 6 4 4 2 18.5 29 6.5 20.5 31 8.5 MIS12-10D MIS20-10D 4 2 6 4 2.5 4 18.5 39 6.5 20.5 41 8.5 MIS12-20D MIS20-20D 6 4

D-F9WV D-F8 Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E 18.5 31 6.5 20.5 41 8.5 20.5 33 4.5 17 20.5 31 4.5 15 20.5 41 4.5 15 20.5 51 4.5 35 22.5 43 6.5 27 22.5 33 6.5 17 22.5 43 6.5 27 22.5 53 6.5 37 MIW12-12D MIW20-20D 6 4 4 2 18.5 29 6.5 20.5 31 8.5 MIS12-10D MIS20-10D 4 2 6 4 2.5 4 18.5 39 6.5 20.5 41 8.5 MIS12-20D MIS20-20D 6 4

MHY2-10D MHY2-16D MHY2-20D MHY2-25D MHY2-10D MHY2-16D MHY2-20D MHY2-25D 6 8 10 12 4 5 8 10 0.88 2.1 4.3 7.4 0.59 1.3 3.3 5.9 M3 x 0.5 M4 x 0.7 M5 x 0.8 M6 x 1 M3 x 0.5 M4 x 0.7 M5 x 0.8 M6 x 1 Body through-hole How to Mount the Attachment to the Finger Applicable bolts Max. tightening torque (Nm) Max. screw-in depth (Lmm) Model MHY2-10D MHY2-16D MHY2-20D MHY2-25D 6 8 10 12 0.88 2.1 4.3 7.4

Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.