Dripping Flow Rate(l/min): 15, Oil Storage Capacity(cm3): 25, Case: [Resin] Polycarbonate Case, Inlet Side Connection Type: Rc, Inlet Side Plumbing Thread Nominal: 1/8, Outlet Side Connection Type: Rc, Outlet Side Plumbing Thread Nominal: 1/8, Drain Exhaust: [Not Provided] No Drain Cock, Flow Direction: [Right] From Left to Right, Size of Body: 20, Accessory: With Bracket, Pressure
Body Size: 20, Thread: Rc (Rc: for Sizes 20~60; M5: for Size 10), Port Size: 01 (1/8), Mounting: B (Bracket), Semi-Standard, Body Size 10: Standard, Semi-Standard, Body Size 20: Standard, Semi-Standard, Body Size 30, 40, 50 & 60: Standard
An example of HRS090-A-20 "3~" stands for "3 interphase".
In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
Note 3) : Select with an option E1, E2, E3 or E4. -16- 4-2. AC20A-D to AC60A-D 30 03 DE AC A D Symbol Description Body size 20 30 40 50 60 Nil Rc Thread type N NPT F G 01 1/8 02 1/4 03 3/8 Port size 1/2 04 06 3/4 10 1 Nil Without auto drain a Float type C N.C. (Normally closed) Drain port is closed when pressure is not supplied. auto drain D N.O.
center 3-position exhaust center 2(B) (A)4 2(B) (A)4 (EA)5 1 (P) 3(EB) (EA)5 1 (P) 3(EB) 1 (P) 2 (B) 3 (EB) 4 (A) 5 (EA) 3-position pressure center 2(B) (A)4 (EA)5 1 (P) 3(EB) Component Parts No.
Installation environment specifications Sound noise:HRSH300-A: 71dB(A) HRSH100/150/200/250-A: 68dB(A) HRSH150/200-W: 60dB(A) HRSH100/250-W: 61dB(A) * Front 1m, height 1m, rated condition 3.2 Installation HRSH Series 3-8 HRX-OM-Q026 Chapter 3 Transport and Setting Up 3.2.5 Installation and maintenance space It is recommended to keep the space around the product shown in Fig. 3-3.
An example of HRS150-A-20 "3~" stands for "3 interphase".
For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
Rated Rated Sensitivity voltage x size voltage current of leak [V] [A] current [mA] 3 wires x14AWG HRS018-A-20-R HRS030-A-20-R 1-phase 10 30 (3 wires x 2.0mm2) 200, (including ground) Cable diameter: 8.5 to 11.5 mm 200-230V AC 230 HRS0-A-20-T-R (50/60Hz) (High pressure pump 15 30 [Optional]) HRS-R Series 3.3 Installation 3-9 HRX-OM-W058 Chapter 3 Transport and Setting Up 3.3.3 Preparation
2.4 Operation display panel . 2-4 Chapter 3 Transport and Setting Up . 3-1 3.1 Transport. 3-1 3.1.1 Transportation using casters . 3-2 3.2 Installation . 3-3 3.2.1 Environment . 3-4 3.2.2 Location (Required ventilation rate and facility water source) . 3-6 3.2.3 Installation and Maintenance Space . 3-7 3.3 Installation . 3-8 3.3.1 Mounting . 3-8 3.3.2 Electrical wiring . 3-9 3.3.3 Preparation
Terminal no.12 Switch Terminal no. 12 11 Recommended accessory cable dia. is 0.14 to 1.5mm2 10 9 Terminal no.1 Fig. 3-8 Wiring of contact for remote signal inputsExample 3.3 Installation HRS-R Series 3-14 HRX-OM-X027 Chapter 3 Transport and Setting Up 3. Inset the signal cable through the hole and fit the nipple A, nipple B and lock nut. Then fit the cap A, cap B and rubber bushing.
Table 3-3 Power supply cable and Earth Leakage BreakerRecommended Recommended earth Terminal block leakage breaker Power screw Recomm Tighten Sensiti Rated Model supply Cable qty. x size diamet ended ing Rated vity curren voltage er crimp torque voltage of leak t terminal [V] current [A] [mA] 3 cores x10AWG HRS060-A-20 30 (3 cores x 5.5mm2) (including ground) 200, 1-phase 1.5Nm M4 5.5-4 30
Table 3-3 Power supply cable and Earth Leakage BreakerRecommended Recommended earth leakage breaker Model Power supply Sensitivity voltage Cable qty. x size Rated Rated of leak voltage current current [V] [A] [mA] 1-phase 200-230V AC (50/60Hz) 3 cores x12AWG HRS040-A-20 200, Recomm 230 20 30 Terminal (3 cores x3.5mm2) HRS040-W-20 block ended (including ground) screw crimp diameter terminal
2.4 Operation display panel . 2-4 Chapter 3 Transport and Setting Up . 3-1 3.1 Transport. 3-1 3.1.1 Transportation using casters . 3-2 3.2 Installation . 3-3 3.2.1 Environment . 3-4 3.2.2 Location (Required ventilation rate and facility water source) . 3-6 3.2.3 Installation and Maintenance Space . 3-7 3.3 Installation . 3-8 3.3.1 Mounting . 3-8 3.3.2 Electrical wiring . 3-9 3.3.3 Preparation
2.4 Operation display panel . 2-4 Chapter 3 Transport and Setting Up . 3-1 3.1 Transport. 3-1 3.1.1 Transportation using casters . 3-2 3.2 Installation . 3-3 3.2.1 Environment . 3-4 3.2.2 Location (Required ventilation rate and facility water source) . 3-6 3.2.3 Installation and Maintenance Space . 3-7 3.3 Installation . 3-8 3.3.1 Mounting . 3-8 3.3.2 Electrical wiring . 3-9 3.3.3 Preparation
Prepare a forklift. The product will be delivered in the packaging shown below. 3. Hanging transportation 1) Crane manipulation and slinging work should be done by an eligible person. 2) Do not grip the piping on the right side or the handles of the panel. 3) When hanging by the eye bolts, be sure to use a 4-point hanging method.
A molded-case circuit breaker (MCCB) must be used with the input cables of the main circuit power supply. 3 3 3.
[inch] Connection Weight [g] With a rib X Y Nylon Urethane L1 M Rib 1/8 1/8 KQ2L01-U01m1 11.11 7.1 6.7 9.5 10 14.5 17.9 16.7 13.3 3 2.5 2.5 6 1/4 KQ2L01-U02m1 14.29 7.1 6.7 9.5 10 14.5 19.2 16.4 13.3 3 2.5 2.5 12.1 D1 5/32 1/8 KQ2L03-U01m1 11.11 8.2 7.7 10 10 14.8 17.4 16.7 13.3 4.6 3.3 3 6.2 V 1/4 KQ2L03-U02m1 14.29 8.2 7.7 10 10 14.8 19.7 17.4 13.3 4.6 3.3 3 12.3 V L2 A D2 3/16 1/8 KQ2L05
When resuming operation after deactivating the alarm, make a home position return. 3 48 3.