Output Specification: Y (PNP Open Collector 2 Outputs + Copy Function), Unit Specification: Unit Selection Function, Switches w/Unit Selection not Permitted for Use in Japan, Piping Specification: 01 (R 1/8), Lead Wire: w/o Lead Wire, Bracket: None, Operation Manual: Y (w/o Operation Manual, w/o Calibration Certificate)
Output Specification: Y (PNP Open Collector 2 Outputs + Copy Function), Unit Specification: Unit Selection Function, Switches w/Unit Selection not Permitted for Use in Japan, Piping Specification: N01 (NPT 1/8), Lead Wire: w/o Lead Wire, Bracket: None, Operation Manual: Y (w/o Operation Manual, w/o Calibration Certificate)
Rated Vacuum Range: F (-100 to 100 kPa), Output Specification: Y (PNP Open Collector 2 Outputs + Copy Function), Unit Specification: Unit Selection Function, Switches w/Unit Selection not Permitted for Use in Japan, Piping Specification: N01 (NPT 1/8), Lead Wire: w/o Lead Wire, Bracket: None, Operation Manual: Y (w/o Operation Manual, w/o Calibration Certificate)
CG-T020 CG-T025 CG-T032 CG-T040 CG-T050 CG-T063 N/A N/A Clevis CG-D020 CG-D025 CG-D032 CG-D040 CG-D050 CG-D063 CG-D080 CG-D100 Single rod clevis I-G02 I-G03 I-G03 I-G04 I-G05 I-G05 I-G08 I-G10 Double rod clevis Y-G02 Y-G03 Y-G03 Y-G04 Y-G05 Y-G05 Y-G08 Y-G10 Rod clevis pin IY-G02 IY-G03 IY-G03 IY-G04 IY-G05 IY-G05 IY-G08 IY-G10 Rear clevis pin CD-G02 CD-G25 CD-G03 CD-G04 CD-G05 CD-G06 IY-G08
-XC47 to -XC58 S, W, Y -XC59 to -XC61 Change of port direction S, W, X, Y Z, T, J, K -X7* Heat resistant type (100C) S, W, X, Y Z, T, J, K Angle adjusting screw -X16 Fluororubber seal S, W, X, Y Z, T, J, K -X10 Both sides angle adjustable S, W, X, Y Z, T, J, K 0 0 9 0 y 1 a y A port B port w a y n w e -X11 One side angle adjustable, One side with cushion io k y of e S, W, X, Y Z, T, J, K
X = E4 = E2 = DApplicable shaft type: W Applicable shaft type: W [mm] Size CRB2, CRBU2 Y L2 L4 max 10 3 to 8 5-(8-Y) to (Y-1) Y-1 15 3 to 9 6-(2-Y) to (Y-1.5) Y-1.5 20 3 to 10 7-(10-Y) to (Y-1.5) Y-1.5 30 5 to 13 8-(13-Y) to (Y-2) Y-2 40 7 to 15 9-(15-Y) to (Y-4.5) Y-4.5 [mm] Size CRB2 CRBU2 X L1 L3 max X L1 L3 max 10 5 to 14 9-(14-X) to (X-3) X-3 3 to 14 9-(14-X) to (X-1) X-1 15 8 to 18
Applicable shaft type: W (mm) Size L2 Y (mm) Size 10 X L1 3 to 8 5-(8-Y) to (Y-1) 10 15 9-(14-X) to (X-3) 5 to 14 3 to 9 6-(9-Y) to (Y-1.5) Y = L1= 15 20 8 to 18 10-(18-X) to (X-4) 3 to 10 7-(10-Y) to (Y-1.5) L2 = 20 30 10 to 20 10-(20-X) to (X-4.5) 5 to 13 8-(13-Y) to (Y-2) X = 30 40 10 to 22 12-(22-X) to (X-5) 7 to 15 9-(15-Y) to (Y-2) CRB1 Free-Mounting Type CRBU2 CRB2 Symbol: A11 Symbol
YZ VFS3320-D/DZ/Y/YZ VFS3420-D/DZ/Y/YZ VFS3520-D/DZ/Y/YZ Lead wire O.D.
LEC Y 3.
A r-ll B T-l I t# r. r-1 zK 9K Flg. 8.25 Two cylinder cascade- P N E U M A T I C T E C H N O L O G Y APPENDIX SYMBOLS T H E S Y M B O L S F O R F L U I D P O W E R S Y S T E M S A N D C O M P O N E N T S A R E S T A N D A B D T Z E D I N I S O 1 2 1 9 . T H E S T A N D A R D C O M B T N E S H Y D R A U L I C A N D P N E U M A T I C C O M P O N E N T S .
A r-ll B T-l I t# r. r-1 zK 9K Flg. 8.25 Two cylinder cascade- P N E U M A T I C T E C H N O L O G Y APPENDIX SYMBOLS T H E S Y M B O L S F O R F L U I D P O W E R S Y S T E M S A N D C O M P O N E N T S A R E S T A N D A B D T Z E D I N I S O 1 2 1 9 . T H E S T A N D A R D C O M B T N E S H Y D R A U L I C A N D P N E U M A T I C C O M P O N E N T S .
Applicable shaft type: W (mm) Y L2 L2 max Size (mm) E3 = E1 = Y = 10 3 to 8 5 ( 8 Y) to (Y 1) Y-1 L1 L3 max X Size L2 = L4 = 10 9 (14 X) to (X 1) 15 3 to 9 6 ( 9 Y) to (Y 1.5) Y-1.5 3 to 14 X 1 L1 = 15 10 (18 X) to (X 1.5) 20 3 to 10 7 (10 Y) to (Y 1.5) Y-1.5 3 to 18 X 1.5 L3 = X = 20 10 (20 Xs) to (X 1.5) 30 5 to 13 8 (13 Y) to (Y 2) Y-2 3 to 20 X 1.5 30 12 (22 X) to (X 2) 40 7 to 15 9 (
DO Without connector Y With connector DIN terminal (Type Y) Without connector YO Note) Do not replace V111 (G, H, L, M) to V115 (DIN terminal) and vice versa when replacing pilot valve assembly only.
Calculate the load factor for each direction. x = Xc/Lx, y = Yc/Ly, z = Zc/Lz 5. Confirm the total of x, y and z is 1 or less. x + y + z 1 When 1 is exceeded, consider a reduction of acceleration and work load, or a change of the work load center position and series. Acceleration [mm/s2]: a Work load [kg]: m Work load center position [mm]: Xc/Yc/Zc z y 1. Horizontal 3. Wall x y x z 2.
Shaft Type: Y Dimensions CRQ2XB CDRQ2XB Size Rotating angle Y Y Refer to How to Order on page 308 for further information.