for 1 output, 2 m Lead wire with connector ZS-38-4L 4 cores for 2 outputs, 2 m Lead wire with connector + connector cover ZS-38-3G 3 cores for 1 output, 2 m Lead wire with connector + connector cover ZS-38-4G 4 cores for 2 outputs, 2 m Lead wire with connector for copy function ZS-38-5L 3 cores (for copy function), 1 m Lead wire with connector unit for copy function ZS-38-U for copy function
Example order CDLQB32-50-M9BW 1 unit BQ-2 2 pcs. BQ2-012 2 pcs. Note 2) Auto switch mounting brackets and auto switches are shipped together with cylinders. 836 Series CLQ Compact Cylinder with Lock Double Acting, Single Rod Auto Switch Mounting Bracket: Part. No.
Mey = 1/3 x 0.56 x 9.8 x (50+11)/1000 = 0.116 We = 0.56 A3 = 11 Obtain Meay = 1.1 from V = 140 in Graph (2). 2 = 0.116/1.1=0.1 2 = Me/Mea 1.1 Meay N.m D-X 140 V mm/s 3-3 Sum of Load Factors 1 + 2 + 2' = Applicable because 0.07 + 0.07 + 0.1 = 0.24 < 1 Individual -X Possible to use if the sum of the load factors does not exceed 1. 1 + 2 < 1 171 Series MXJ Fig. (2) Allowable Static Load: F(N
Brown Brown Load Load Switch 1 Switch 1 Blue Blue Brown Brown Switch 2 Switch 2 Blue Blue Leakage current Load Impendance x 2 pcs. x Power supply voltage Residual voltage x 2 pcs.
Description Material 1 Body Aluminum die-cast 2 Flange Aluminum die-cast 3 Bowl Stainless steel e r Replacement Parts No.
Memory map of input data Data (2 byte) Input area Branch connector (INPUT) MSB LSB MSB LSB 15 8 7 0 byte (b+1) byte (b) Word (a) COM A byte (b+3) byte (b+2) Word (a+1) COM B byte (b+5) byte (b+4) Word (a+2) COM C byte (b+7) byte (b+6) Word (a+3) COM D (a, b=0 to) Memory map of output data Data (2 byte) Output area Branch connector (OUTPUT) MSB LSB MSB LSB 15 8 7 0 byte (d+1) byte (b) Word
Ionizer . 8 1-2. Accessories. 8 1-3. Option . 10 2. Procedures to Operation . 10 3. Installation and Wiring . 11 3-1 Installation . 11 3-1-1. Precautions for Installation . 11 3-1-2. Installation of Ionizer . 12 3-2. Wiring . 13 3-2-1. Connection Circuit . 13 3-2-2. Wiring of the Power Supply Cable . 15 3-2-3. Wiring of the AC Adapter . 15 3-3. Timingchart . 16 4. Function . 17 4-1.
Contents 1 1 200 to 220 VAC 100 to 240 VAC 2 2 200 to 220 VAC 100 to 240 VAC PE 2 1 3 3 PE HRG HRS HRZ HRZD HRW HEC HEB HED Technical Data Related Products 2. Communication connector (RS-232C or RS-485) D-sub 9 pin (socket) Holding screw: M2.6 Signal contents 3 2 Pin No. RS-232C RS-485 5 4 1 1 Unused BUS+ 2 RD BUS 3 SD Unused 4 Unused Unused 5 SG SG 6-9 Unused Unused 9 8 7 6 3.
1.0 to 38.0 2 to 76 8 to 186 CFM x 10-2 CFM x 10-2 CFM x 10-1 CFM x 10-1 CFM x 10-1 flow Flow Min. setting/display unit 0.5 2.0 0.5 1.0 2.0 CFM x 10-2 CFM x 10-2 CFM x 10-1 CFM x 10-1 CFM x 10-1 Accumulated Setting/display flow range 0 to 9 ft3 x 10-2 0 to 9 ft3 x 10-1 flow Min. setting/display unit 1 ft3 x 10-3 1 ft3 x 10-1 Conversion of accumulated pulse 0.5 2.0 0.5 1.0 2.0 ft3 x 10-2/
VFA5120-03 2 pcs. VFA5220-03 2 pcs. DXT156-19-1A 1 pc.
Nominal thread size Required torque Port size Width across flats of attachment Rc1NPT1 36 to 38 Nm 1 45 mm Rc1 1/2, NPT1 1/2, Rc2, NPT2 48 to 50 Nm 1 1/2 60 mm 2 70 mm 16 No.PF-OMU0002-D Wiring Connection Connections should only be made with the power supply turned off. Use a separate route for the product wiring and any power or high voltage wiring.
PVC PVC PVC PVC PVC , -10No.PF-OMM0004-D -11No.PF-OMM0004-D N M8 M8 R / ZS-40-K PF3W704/720 4 3X8 ZS-40-L PF3W740 4 3X8 ZS-40-M PF3W711 4 4X10 M8 ZS-40-A 3 m 2 250 L/min PVC 25 A ZS-40-U25 25 A PVC 1 PVC 30 A ZS-40-U30 30 A PVC 1 25 A ZS-40-U25-A 1 M5x80 2 30 A ZS-40-U30-A 1 M5x65 2 PVC 1~2% -12No.PF-OMM0004-D 1 DC+ 2 OUT2 3 DC4 OUT1 M8 IN OUT OUT1OUT2 ON UP ON/OFF SET
Remarks Bracket A ZS-46-A1 Self tapping screws: Nominal size 3 x 8L (2 pcs.) Bracket B ZS-46-A2 Self tapping screws: Nominal size 3 x 8L (2 pcs.)
Problem Possible cause Investigation method Countermeasure (1)(2) Connect the (1) Check if the output current is 80 mA or more. appropriate load. (2) Check if the specified load is (3) Use a relay with a surge connected.
Breaker Operating Characteristics Common for all models 4 h 2 h 1 h 5 s 10 s 20 s 30 s 1 min 2 min 4 min 6 min 10 min 14 min 20 min 30 min Max.
Afterwards, do 1 and 2 alternately. 1. Reduce value of parameter No.PA09 to be less than present value. 2. Operate and ascertain the situation. The gain is adjusted automatically. For LECSB-T(Pulse input / Positioning), LECSS-T(SSCNET III/H) A. Auto tuning (Mode1) Set parameter No.PA08 0001. Afterwards, do 1 and 2 alternately. 1.
Product Description 1 1-1 Model 1 1-2 Specifications 1 1-3 Effective Torque 2 1-4 Key (Keyway) Position and Rotation Range 2 2. Internal Construction and Description of Individual Parts 3 2-1 Single Vane Type 3 2-2 Double Vane Type 4 3. Basic Circuit 5 3-1 Circuit Configuration 5 3-2 Preferred Components 5 4.
for NPN output Brown Brown Brown Black Blue Load Black Blue Relay Black Blue Load Switch 1 Switch 1 Switch 1 Load Relay contact Brown Black Blue Brown Black Blue Brown Black Blue Switch 2 Relay Switch 2 Switch 2 The indicator lights will light up when both switches are turned ON. 2-wire with 2 switch AND connection 2-wire with 2 switch OR connection
Circuit (of Class 2) which is of maximum 30 Vrms (42.4 V peak) or less, with UL1310 Class 2 power supply unit or UL1585 Class 2 transformer. The product is a UL approved product only if it has a mark on the body. Use the specified voltage. Otherwise failure or malfunction can result. Insufficient supply voltage may not drive a load due to a voltage drop inside the product.