SMC Corporation of America
Elite Part Number Search
Search Results "CJ2B16-15+15Z-XC10"

Selection of air quality by purpose For these cases, degree of quality is 15 4 +3 5 specified as 1, 4, and 2 respectively. 40 5 +7 25 Refer to Guide (1). Refer to Guide (2). Refer to Guide (3). Refer to below piping system chart. Refer to Guide (4) page 14-14-4.

Series RSH 20, 32, 50, 63, 80 How to Order RSH 20 15 D L Z73 Heavy Duty Stopper Cylinder Bore size Number of auto switches 20mm 32mm 50mm 63mm 80mm 20 32 50 63 80 S 2 1 Auto switch Stroke Without auto switch (Cylinder built-in magnet) 15mm 20mm 30mm 40mm 20 32 50/63 80 * Refer to the table below for auto switch model nos.

1.5 METER CABLE, STATION 15, VALVE, VV5Q51/55 MANIFOLD, 22, VV5Q51/55 NO SIZE RATING, 0.08844 lb

Flash Operating voltage 24 VDC +20%/-15%, Class 2 1 ON US2 [US3, US4 .. etc] is present (> approx. 22.8 VDC). Detected: < approx. 20.4 VDC Cancelled: > approx. 21.6 VDC 3 : If the US2 power supply is not present or below the dropout level, the SF LED will also flash and the error code "0x01F1" will be generated.

I/O monitor(I/O ) 15 2. Diagnosis Data() 24 3. Sys. Configuration() 27 4. Parameter Setting() 33 5.

If using the product to detect very small flow rates, warm up the product for 10 to 15 minutes first. There will be a drift on the display or the analogue output of approximate 2 to 3% immediately after the power supply is turn on, within 10 minutes. The output is off for 3 seconds after power is supplied. Use settings suitable for the operating conditions.

No.PF-OMN0005-E PRODUCT NAME Voltage Monitor for PFMV5 MODEL / Series / Product Number PFMV3## Table of Contents Safety Instructions 2 Model Indication and How to Order 9 Summary of Product parts 12 Definition and terminology 13 Mounting and Installation 15 Installation 15 Wiring 17 Flow Setting 21 Function Setting 23 Default settings 23 F0 Auto-preset 24 F1 Setting of OUT1 26 F2 Setting

If using the product to detect very small flow rates, warm up the product for 10 to 15 minutes first. There will be a drift on the display or the analogue output of approximate 2 to 3% immediately after the power supply is turn on, within 10 minutes. Check regulators and flow adjustment valves before introducing the fluid.

If using the product to detect very small flow rates, warm up the product for 10 to 15 minutes first. There will be a drift on the analogue output of approximate 2 to 3% immediately after the power supply is turn on, within 10 minutes. Check regulators and flow adjustment valves before introducing the fluid.

No.PF-OMN0012-H PRODUCT NAME Digital Flow Switch (Remote type monitor unit) MODEL / Series / Product Number PF3W3## Table of Contents Safety Instructions 2 Model Indication and How to Order 9 Summary of Product parts 12 Definition and terminology 13 Mounting and Installation 15 Installation 15 Wiring 16 Flow Setting 21 Function Setting 24 Default settings 25 F0 Selection of sensor 26 F1 Setting

Doc.No.LFE*-OMZ0011 Product Name Electromagnetic Digital Flow Switch Integrated Display Type Model/ Series/ Product Number LFE#(Z) SMC Corporation Contents Safety Instructions 2 Model Indication and How to Order 11 Summary of Product Parts 14 Definition and Terminology 15 Mounting and Installation 17 Installation 19 Piping Method 20 Wiring 22 Setting the Detected Flow Rate 24 Function Setting

Doc.No.LFE*-OMZ0012 Product Name Electromagnetic Digital Flow Switch Remote Type Model/ Series/ Product Number LFE#(Z) SMC Corporation Contents Safety Instructions 2 Model Indication and How to Order 11 Summary of Product Parts 13 Definition and Terminology 14 Mounting and Installation 15 Installation 17 Piping Method 18 Wiring 20 Maintenance and Inspection 22 Troubleshooting 23 Specifications

When conducting maintenance, obtain the necessary parts indicated in the maintenance parts list (Refer to P.15), and perform work according to the maintenance and operation manuals.

Also, it should be noted that the discharge rate will be less than the normal condition. 2) Air consumption Air consumption Caution Air consumption L/min[ANR] 0 5 10 15 20 25 30 35 40 45 L/min[ANR] -If the compressor output is selected based on air consumption, 0.75kW per 100L/min (ANR) is the guide. 1 2 3 4 5 6 7 8 9 10 Hz Cycle Hz 15 3) Viscosity characteristics With reference to the

T With stand for vertical installation 8 1 15 9 D-sub 15 pin (Socket type) Fixed screw: M2.6 Description No.

The maximum operating 0 5 10 15 20 25 30 ( temperature for the valve is 150oC. If the heater temperature is over 200oC or valve temperature is Time (sec.) Duration of the inrush current flow (as a guide) over 150oC, please use thermostat to control the heaters to prevent overheating.

40 800/50 XL1A25-60S-1 XL1A25-60S-2 XL1A25-60S-2 1 1 1 H5 AC100V 200/40 400/70 400/80 / AC200V 800/40 1600/80 1600/80 XLA-63-2 XLA-80-2 AC90240V XL1A25-60S-2 XL1A25-60S-3 1 1 H4 AC100V 400/100 600/150 / AC200V 1600/100 2400/150 XL1A25-60S-3 XL1A25-60S-2 1 2 H5 AC100V 600/130 800/180 / AC200V 2400/130 3200/180 1[W] 216 PTC 200V PTC 200 150 100V PTC 0 5 10 15

Step 7 Reassembly of bonnet assembly (No.2) 3 Bolt 1 2 4 Bonnet assembly Pilot port Bolt size, Tool, Tightening torque of bolt (Nm) valve Bolt size Hex Tightening size wrench torque XLF-16 M3 3 0.7 -25 M5 4 1.5 -40 M6 5 2.5 -50 M8 6 6.1 -63 M10 8 15 -80 Body Supply air pressure of 0.4MPa (G) to the pilot port.

Step 6 3 Bolt b Tightening torque of bolt a Nm 1 Tightening torque of bolt b Nm Valve size Tightening torque 2 Valve size Tightening torque 4 All sizes 0.3 XLA-16 0.7 -25 1.5 -40 2.5 -50 6 Bonnet assembly -63 6 -80 15 -100 20 Bolt a Heater Pilot port -160 102 Cover Body Apply 0.4MPa of air pressure to the pilot port.

Step 6 Tightening torque Nm Valves 3 Bolt Size Tightening Torque 3 1 X*C-25 1.5 Bolt 2 -40 2.5 1 -50 6 2 -63 6 4 4 -80 15 Bonnet assembly Body Assemble Body and Bonnet assembly by tightening the bolt in numerical order. Manually tighten bolts until O-ring is compressed.