INSTALLATION 2 1 to 2 6 2.1 Installation direction and clearances . 2 2 2.2 Keep out foreign materials . 2 3 2.3 Cable stress . 2 4 2.4 SSCNET cable laying. 2 4 2.5 Inspection items . 2 6 2.6 Parts having service lives . 2 6 3.
(Serial transmission kit: EX126) 2-Rc 3/4 3(R) port 2-Rc 1/2 1(P) port 4-G 1/2 Conduit port VQC SMC SMC SMC SMC SMC SMC SMC SQ 95.5 2 B 2 B 2 B 2 B 2 B 2 B 2 B 2 B 77.5 90 72 VQ0 13 55.5 42.7 43.5 20.5 VQ4 4 A 4 A 4 A 4 A 4 A 4 A 4 A 4 A 33.5 11.5 15.7 12 2-Rc 1/8 (Pilot exhaust port) VQ5 (6.5) 21.5 2-Rc 1/8 (External pilot port) 27 2n-Rc 1/4, 3/8, C8, C10, C12 <4(A), 2(B) port> Rc 1/4:
Symbol Size Port size Symbol Voltage Electrical entry A B C D E F H J K L M N 2 Grommet 1 N.C. 3 1/8 Size 1 A 5 24 VDC 4 C37 N.O. 2 1/4 3 5 B Grommet 100 VAC 2 With surge voltage suppressor C 110 VAC 1/8 3 D 200 VAC 5 Stainless steel E 230 VAC 2 1/4 3 F 24 VDC 5 G DIN terminal 24 VDC With surge voltage suppressor A B D E H J L M 4 H 100 VAC Size 2 2 1/4 N.C. 7 J 110 VAC C37 4 5 N.O. 3/8
A) 4 (B) 2 (A) 4 (B) 2 1 (P) 5 (R1) 3 (R2) 1 (P) 5 (R1) 3 (R2) q w e q w VQ5201 VQ5200 (A) 4 (B) 2 (A) 4 (B) 2 1 (P) 5 (R1) 3 (R2) 1 (P) 5 (R1) 3 (R2) e e r q w r q w VQ5301 VQ5401 VQ5300 VQ5400 (A) 4 (B) 2 (A) 4 (B) 2 (A) 4 (B) 2 (A) 4 (B) 2 1 (P) 5 (R1) 3 (R2) 1 (P) 5 (R1) 3 (R2) 1 (P) 5 (R1) 3 (R2) 1 (P) 5 (R1) 3 (R2) VQ5500 (A) 4 (B) 2 VQ5501 (A) 4 (B) 2 1 (P) 5 (R1) 3 (R2) 1 (P) 5 (R1
(n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 60 + 30 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 65 + 30 (n 4) 2 70 + 30 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 10 + 30 n (n = 2, 4, 6, 8 ) Note 1) (n = 4, 8, 12, 16 ) Note 2) 2 (Different surfaces, Same surface) 1 95 100 D-M9A 85 15 80 (n 2) 2 80 + 40 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 85 + 40 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 95 + 40 (n 4) 2 100 +
144.5 143 112.5 83.5 179 46.8 59.2 106 9 9 U side 55.5 M5 ground screw 19 34.5 34 n 12 X 2n-Rc 3/8, 1/2 4(A), 2(B) port B 2 A 4 6 B 2 A 4 Indicator light 5 B 2 A 4 A 4 SMC SMC SMC SMC A A B B B B B Manual override L2 L1 58.5 P = 41 B 2 A 4 A B 3 B 2 A 4 A B 2 A 34.5 48 68.5 P = 41 B 2 A 4 A 1 A X 12 Stations R4.5 15.5 17 22 51 69 117 2-Rc 1/8 (External pilot port) 107.8 179 (Single, Double
Internal circuit and wiring example Output specification PSE57-02 Voltage output: 1 to 5 V Output impedance: Approx. 1 k PSE57-02-28 Current output: 4 to 20 mA Allowable load impedance: 500 or less (at 24 VDC) 100 or less (at 12 VDC) : The unconnected terminals are used in SMC, so please do not connect them. -11No.PS-OMT0006-C Troubleshooting Cross-reference for troubleshooting Problem
Applicable dryer Material IDF4E IDU4E IDF6E to 11E IDU6E to 11E IDF22E, IDU22E IDF15E, IDU15E IDF37E, IDU37E IDF-AP601 NPT 1/2 R 1/2 23 26 38 IDF-AP603 NPT 3/4 R 3/4 23 32 43 IDF-AP604 IDF-AP605 IDF-AP606 IDF-AP607 Rc 1 NPT 1 Rc 1 1/2 Rc 2 NPT 1 R 1 NPT 1 1/2 NPT 2 Copper alloy 2 27 46 50 Male thread side A 31 35 54 70 55 65 D IDF55E, 75E, IDU55E, 75E IDF1E to 3E IDU3E C IDF-AP609 NPT 3/8
fluid return port Rc 1/2 Drain port Rc 1/4 (Plugged) Y-type strainer Facility water outlet Rc 1/2 1/2 (Accessory) (108) Facility water inlet Rc 1/2 Caster with adjuster (unfixed) (4 x 38) (541) (436) (57) Y-type strainer and eye bolts included.
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter
HRZ Series 5.3 Operation Screen 5-5 5-5 HRX-OM-X010 Chapter 5 System Operation 5.3.3 Status screen 2 POWER ON 2 1 3 4 Figure 5-5 Status screen 2 Table 5-4 Status screen 2 No.
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter
Series 70 8 Series 80 1 2WNO 2 2WNC 3 3WNC 4 3WNO 5 3WDC 6 3WMP 18 Direct Lift 2WNO 27 Direct Lift 2WNC 28 Pilot Lift 2WNC G 1/32 H 3/64 J 1/16 K 3/32 L 7/64 N 1/8 O 5/32 P 3/16 U 7/32 R 1/4 A 9/32 S 5/16 T 3/8 V 5/64 B 1/2 C 5/8 D 1 E 1 1/2 Y 3/4 F 2 W 3 SS BR AL 1/8 NPT 7 4 2 1/8 NPT 8 5 2 1/4 NPT 9 6 3 3/8 NPT 1 10 1/2 NPT 33 12 11 1 NPT 23 13 1 1/2 NPT 24 14 3/4 NPT 29 19 2 NPT 26 16
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter
O 5/32 P 3/16 U 7/32 R 1/4 A 9/32 S 5/16 T 3/8 V 5/64 B 1/2 C 5/8 D 1 E 1 1/2 Y 3/4 F 2 W 3 D No Option Ports T Metering (1/32 1/8 orif.)
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter
Starting the Product . 4-1 4.1 Before Starting . 4-1 4.2 Preparation for Start . 4-2 4.2.1 Power supply . 4-2 4.2.2 Setting of circulating fluid temperature . 4-2 4.3 Preparation of circulating fluid . 4-3 4.4 Starting and Stopping . 4-6 4.4.1 Starting the product . 4-6 4.4.2 Stopping the product . 4-7 4.5 Check items after starting . 4-8 4.6 Adjustment of Circulating Fluid . 4-8 Chapter