XC47 to to XC58 XC58 XC59 XC59 S, W, Y S, W, Y S, W, Y S, W, Y S, W, Y 30 to 100 to Change of port direction to XC61 XC61 XC63 One side hydro, One side air XC62 XC62 Reverse mounting of auto switch 50, 63 80, 100 XC64 One side hydro, One side air Chart 8. Combination between -X and -XC (Refer to page 11-7-49 for made-to-order/details on -X.)
(mm/s) Me: Dynamic moment L : Overhang to work piece center of gravity (mm) a = 3000 2000 m L1 0 10 20 30 Transfer load m (kg) L2 600 400 L2 (mm) Mer Rolling Yawing m 200 L2 Mer 10 20 30 0 Transfer load m (kg) m a =1000 4000 a = 2000 L3 (mm) L3 a = 3000 2000 m Mey a 10 20 30 0 Transfer load m (kg) Refer to page 183 for deflection data. 162 17 Courtesy of Steven Engineering, Inc.-230 Ryan
F G F Port size M K M K E J C B R C B R H J H IN OUT OUT IN OUT OUT A P Min. clearance for maintenance A Min. clearance for maintenance Metal bowl with level gauge Metal bowl with drain cock Drain cock with barb fitting With drain cock Metal bowl Metal bowl with drain cock & level gauge B B B B B B S Barb fitting Applicable tubing T0604 S Standard specifications Accessory specifications Bracket
Selecting Conditions/Table 1 Vertical Upward facing Downward facing Horizontal l = Eccentric distance l = Distance between the plate and load center of gravity m Mounting orientation m m l = Eccentric distance Maximum load speed V Graph (Slide bearing type) Graph (Ball bushing type) 50 to 200mm/s 201 to 400mm/s 50 to 200mm/s 201 to 400mm/s 50 to 200mm/s 201 to 400mm/s 1 , 2 3 , 4 1 3, 1 4
Selecting Conditions/Table 1 Vertical Upward facing Downward facing Horizontal l = Eccentric distance l = Distance between the plate and load center of gravity m Mounting orientation m m l = Eccentric distance Maximum load speed V Graph (Slide bearing type) Graph (Ball bushing type) 50 to 200mm/s 201 to 400mm/s 50 to 200mm/s 201 to 400mm/s 50 to 200mm/s 201 to 400mm/s 1 , 2 3 , 4 1 3, 1 4
CNS CLS CLQ MLGP RLQ MLU Selection Conditions/Table (1) ML1C DVertical Upward facing Downward facing Horizontal -X l1 = Eccentric distance 20l2 = Distance between the plate and load center of gravity m Data Mounting orientation m m l1 = Eccentric distance Maximum load speed V 201 to 400 mm/s 50 to 200 mm/s 50 to 200 mm/s 201 to 400 mm/s 50 to 200 mm/s 201 to 400 mm/s Graph (Slide bearing
CNS CLS CLQ MLGP RLQ MLU Selection Conditions/Table (1) ML1C DVertical Upward facing Downward facing Horizontal -X l1 = Eccentric distance 20l2 = Distance between the plate and load center of gravity m Data Mounting orientation m m l1 = Eccentric distance Maximum load speed V 201 to 400 mm/s 50 to 200 mm/s 50 to 200 mm/s 201 to 400 mm/s 50 to 200 mm/s 201 to 400 mm/s Graph (Slide bearing
P=0 41 (1 2 Mounlin9 holes L2 0 1 4 ( 3 . 5 ) Tgpe 541,/ Sitle Ported , r r ' : , a M Type Plug Connector(M) 11YY3,13-941-g"-'s;i.;l-M3 L Type Plug Connector(L) 0.1413.5) Dia.
P=0 41 (1 2 Mounlin9 holes L2 0 1 4 ( 3 . 5 ) Tgpe 541,/ Sitle Ported , r r ' : , a M Type Plug Connector(M) 11YY3,13-941-g"-'s;i.;l-M3 L Type Plug Connector(L) 0.1413.5) Dia.
P=0 41 (1 2 Mounlin9 holes L2 0 1 4 ( 3 . 5 ) Tgpe 541,/ Sitle Ported , r r ' : , a M Type Plug Connector(M) 11YY3,13-941-g"-'s;i.;l-M3 L Type Plug Connector(L) 0.1413.5) Dia.
(increment of 0.1 s), 1 to 10 s (increment of 1 s), 20 s, 30 s, 40 s, 50 s, or 60 s.
Made to Order How to Order Transition wiring cable length IZS41 CF X13 For IZS40 Cable full length 1 m 3 m Symbol 01 03 Model with Made-to-order transition wiring cable Available in 1 m increments from 1 m to 20 m. Note 1) 11 m or longer power cables are not CE Marking-compliant. Note 2) Use standard power supply cables for 2 m, 5 m and 8 m lengths.
T) View Z (mm) Dimensions A B C D M N S T U V Model LVQ20-S-3 LVQ30-S-3 LVQ40-S-3 LVQ50-S-3 LVQ60-S-3 25.5 46 31.5 58 7 15 83 35.3 10.6 7 23.5 47 29.5 59 7 15 113.5 36.9 16.5 10 23.5 47 29.5 59 7 20 119 37.9 22 35 70 41 82 7 20 171.5 64 25 17 35 70 41 82 7 20 182.5 66 32 With indicator, High back pressure spec. with indicator N.C. valve Dimensions (mm) S Model LVQ20-S-4 LVQ30-S-4 LVQ40-
Also Available: End Lock Se ee Smooth Gylinder Series CA2Y s/to to sl.o0mm Mect anicalv tocl<8 tha cyltnder posltton at end d s40 to slu)mm Mai ntai n s s m ooth operati on at low pressure and low speecl. s40 to a100mm Al lo ws vari ou s wo rkl oad connections.
Load factor: ( (Load weight x 9.8)/Theoretical force) x 100% Conditions Series CJ2 Series CM2 6 x 1 m AS3301F-06 8 x 1 m AS3301F-08 AN110-01 Series MB/CA2 Series CJ2 Series CM2 4 x 1 m Series MB/CA2 Body ported Tubing bore x Length Speed controller Silencer Base mounted Tubing bore x Length Speed controller Silencer AS2301F-04 6 x 1 m 4 x 1 m AS1301F-04 AN120-M5 SYJ5120-M5 SYJ5140-01 AN101
Component parts Cable length 1.5 m 3 m 5 m 8 m VVZS3000-21A-1 VVZS3000-21A-2 VVZS3000-21A-3 VVZS3000-21A-4 Plug MIL standard Number of terminals: 25 Cable: 25 cores x 0.3 mm2 Applicable base VV5Z3-45F For details, refer to page 3-3-8.
hole / NC(D)Q8N(Z)S T (Inch) Symbol Bore E 056 (9/16") 075 (3/4") 106 (1-1/16") 150 (1-1/2") 200 (2") 250 (2-1/2") 0.20 0.25 0.25 0.34 0.34 0.41 43 Series NCQ8 Dimension Both ends tapped NC(D)Q8A-(C)(M) NC(D)Q8WA-(C)(M) NC(D)Q8A-S(M) NC(D)Q8A-T(M) Both Ends Tapped (Inch) O1 R Bore size Remarks R R O1-Thread 056 (9/16") 075 (3/4") 106 (1-1/16") 150 (1-1/2") 200 (2") 250 (2-1/2") #4-40UNC
Load weight kg Load weight kg m s m s Type of impact s m 1 2 m2 Kinetic energy E1 Thrust energy E2 Fs Fs + mgs Fs mgs Absorbed energy E E1 + E2 Symbols : Speed of impacting object (m/s) m: Mass of impacting object (kg) F: Cylinder thrust (N) g: Gravitational acceleration (9.8 m/s2) s: Shock absorber stroke (m) Note) The speed of the impacting object is measured at the time of impact
B C E E H L1 L1 L2 L2 M Min. port size LQ3E2A-S 1/4" 4 6 17 16 16 34.5 33.5 39.5 38.5 20 3.9 LQ3E3A-S 3/8" 5 9 22.5 19.5 21 47.5 44.5 49.5 46.5 25 6.3 LQ3E4A-S 1/2" 6 10 24.5 22.5 24 52.5 50.5 54.5 52.5 29 9.5 LQ3E5A-S 3/4" 7 14 26.5 24 32 64 61.5 66 63.5 37 15.8 LQ3E6A-S 1" 8 18 30 26 41 78 74 80 76 49 22 LQ3E7A-S 1 1/4" 9 22 35 35 50 92.5 92.5 97.5 97.5 64 28 M H Class 7 929 A LQ3 Series