SMC Corporation of America
Elite Part Number Search
Search Results "RZQA63TN-125-60-A93VZ"

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 150mm, First Stroke: 80mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 50mm, First Stroke: 30mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 200mm, First Stroke: 90mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 75mm, First Stroke: 40mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 175mm, First Stroke: 50mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 300mm, First Stroke: 200mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 175mm, First Stroke: 130mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 175mm, First Stroke: 20mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 50mm, First Stroke: 40mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 100mm, First Stroke: 80mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Mounting: Both Ends Tapped, Bore Size: 63mm, Thread: NPT Thread, Full Stroke: 250mm, First Stroke: 30mm, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -

Ensure that the oil tank fluid volume (minimum fluid level MIN(r) dimension) is 30 mm for 1/2B to 1B, 60 mm for 1 1/4B to 1 1/2B, 80 mm for 2B, and 120 mm or more for 2 1/2B to 3B, measured when there is no turbulence in the flow from the element opening or fluctuation in the fluid level.

) M3 M5 1 2 1 / 1 8 / 1 4 / 3 8 / 1 2 / 3 4 / 1 4 1 / 1 2 Model AS1200 AS1400 AS2200 AS3200 AS4200 M3/M5 M3 2.5 to 6 6 to 20 20 to 40 40 to 63 63 to 100 4.1-19 / 1 8, / 1 4 / 3 8 / 1 2 In-line M3/M5 / 1 8, / 1 4 / 1 4, / 3 8 2.5 to 25 20 to 40 32 to 63 32 to 63 40 to 100 40 to 100 AS1000 AS2000 AS3000 AS3500 AS4000 AS5000 4.1-23 / 1 4, / 3 8 / 1 4, / 3 8, / 1 2 / 1 4, / 3 8, / 1 2 63 to 125

Takes only 60 seconds for element replacement. Element replacement in only 60 seconds Replacement in less than two minutes is possible including removal of liquid. Removing liquid . 45 seconds Removing the case Replacing the element . 51 seconds Installing the case Air vent G1/4 Cover (SUS304) S.O.E. (Single Open Element) can be installed.

135 180 4-11 225 (266) (60) AIR VENT G 1/4 q q A (43) OUT IN e e 150 r B t 120 327 188 (519) w w 84 OUT 2-R 1 r IN 53 DRAIN G 1/4 Note Parts list Dimensions (mm) A B No.

Takes only 60 seconds for element replacement. Element replacement in only 60 seconds Replacement in less than two minutes is possible including removal of liquid. Removing liquid . 45 seconds Removing the case Replacing the element . 51 seconds Installing the case Air vent G1/4 Cover (SUS304) S.O.E. (Single Open Element) can be installed.