Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com Bore size (Stroke (mm)) 8 12 16 20 25 25, 50, 75, 100, 125, 150 50, 75, 100, 125, 150 75, 100, 125, 150, 175, 200 100, 125, 150, 175, 200, 225, 250 100, 125, 150, 175, 200, 225, 250, 275, 300 Auto switch Nil Without
B (Mounting groove no.) C (Mounting groove no.)
A 1.5 12 11 12 6.6 6.6 6H9 ( ) depth 6 +0.030 0 B A 32 11.5 32 11.5 G (NN 1) x H H B-B A-A (mm) Model F 55 46 55 65 75 60 48 60 65 N 4 4 4 4 4 6 8 8 8 G 23 23 23 23 32 44 31 56 H 55 55 55 65 80 44 66 66 NN 2 2 2 2 2 3 4 4 4 GA 23 23 23 23 32 72 88 97 122 HA 55 55 55 65 80 65 88 132 132 I 16 16 16 16 16 31 20 18 18 J 56 56 56 66 90 100 150 205 230 K 35 45 55 65 75 100 125 150 175 KA 170
phase J B C D A A COM COM COM B 12 VDC GND F.G.
operating range A B A B A B 54 MXY6 34 59 5 MXY8 MX 39 67 MXY12 MTS 47 MY Solid State Switch D-M9B(V), D-M9N(V), D-M9P(V) Lead wire entries inside (mm) B B CY Model Mounting Switch operating range A B A B A B 50 MXY6 2 MG Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com
Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.
Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com c B part e f d 2.
9 Parallel pin o Cap B Clear anodized Aluminium alloy NBR @0 Piston seal !0 Cap C Urethane rubber NBR @1 Gasket !1 Head damper Nit riding Stainless steel NBR @2 Gasket !2 Rack Replacement Parts Bolts for Body Through-hole Mounting Description Kit no. Contents MHF2-12D MHF2-12D1 MHF2-12D2 Part no.
9 Parallel pin o Cap B Aluminium alloy Clear anodized NBR @0 Piston seal !0 Cap C Urethane rubber NBR @1 Gasket !1 Head damper Stainless steel Nit riding NBR @2 Gasket !2 Rack Replacement Parts Bolts for Body Through-hole Mounting Description Kit no.
50 3-5 depth 10 +0.02 0 16h9 0 0.043 (A, B, C common view) Misc.
Magnet: With Magnet, Mounting: Front Rectangular Flange Type, Bore Size: 80mm, Port Thread Type: NPT, Stroke: 150mm, Rod End Nut: Without Rod End Nut, Cushion: With Cushion in Both Sides, Port Position: Port on Top - Cushion Valve Down, Auto Switch: -, Lead Wire or Prewired Connector: -, Number: -
Magnet: D (With Magnet), Mounting: FY (Front Rectangular Flange Type), Bore Size: 80mm, Port Thread Type: TN (NPT), Stroke: 150mm, Rod End Nut: Without Rod End Nut, Cushion: With Cushion in Both Sides, Port Position: B (Port on Top - Cushion Valve Down)
M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C
M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C
In the case of mounting auto switch from B direction Step 2) Insert the auto switch into the auto switch installation groove from direction B. A B MHZ MHF Step 3) Slide the auto switch in the direction of the arrow until the indicator light illuminates.
L M9NL Refer to page 12-13-1 for further information on auto switches. Auto switches marked with a "" are made upon receipt of order.
Operating equipment: MHC2-6D A part a b c d e f = 20 (mm) = 3 (mm) = 4 (mm) = 4 (mm) = 5 (mm) = 6 (mm) b c a e B part f d z f1 x.Calculate the inertial moment of the attachment. Assuming the attachment material is aluminium alloy (relative density=2.7), r1= 16.4 (mm).
Operating equipment: MHC2-6D A part a b c d e f = 20 (mm) = 3 (mm) = 4 (mm) = 4 (mm) = 5 (mm) = 6 (mm) b c a Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com e B part f d z f1 x.Calculate the inertial moment of the attachment.