U B A Approx. U A B D-A7H D-A80H D-F7 D-J79 D-F7W D-J79W D-F7F D-F7NTL D-F7BAL SMC SMC Approx. U Approx. U Approx. U SMC SMC Approx. U A B B A Approx. U D-A73C D-A80C D-J79C B A A B Approx.
U A B B A D-A7H D-A80H D-F7 D-J79 D-F7W D-J79W D-F7F D-F7NTL D-F7BAL SMC SMC Approx. U SMC SMC Approx. U B A B A Approx. U D-A73C D-A80C D-J79C D-A7*C,D-A80C Approx. U Approx. U D-A7*C,D-A80C A B A B Approx.
Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.
Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com c B part e f d 2.
M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C
M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C
C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-M9W D-M9V D-M9WV D-M9 D-M9W D-M9V D-M9WV D-M9 D-M9W D-M9V D-M9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E 16.5 25 4.5 18.5 49 6.5 7.5 38 21 MIW8-8D MIS12
Open EO Closed EC K L J M5 x 0.8 (finger closing port) G I M (mm) I 9 11 Model MHS2-50D MHS2-63D G 37.5 44 FZ 6 7 FX 31 38 FY 28 34.5 EC 22 30 EO 34 46 DC 70 86 DO 82 102 M 2 3 B 70 86 K 10 11 AC 3 4 J 24 28 AA 55 66 AB 52 62 NA 18 24 L 4H9 6H9 NB 10h9 12h9 CA 9 12 CB 20 22 0 -0.036 0 -0.043 +0.030 0 +0.030 0 Model MHS2-50D MHS2-63D SC 12 14 RB 34 38 O 5 5.5 4H9 5H9 VA Q 14 17 RA 52 66 VB
Model/Specifications MHT2-32D MHT2-40D MHT2-50D MHT2-63D Model Bore size (mm) Applicable auto switch Bracket no.
Model/Specifications MHT2-32D MHT2-40D MHT2-50D MHT2-63D Model Bore size (mm) Applicable auto switch Bracket no.
Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.
11 B 6.5 9 12 15 A 9.5 13.5 11.5 14 B 6 8.5 11.5 14.5 A 9 13 11 13.5 32 40 50 63 2.7-6
JIS B 8370: General rules for pneumatic equipment. JIS B 8361: General rules for hydraulic equipment. JIS B 9960-1: Safety of machinery Electrical equipment of machines. (Part 1: General requirements) JIS B 8433-1993: Manipulating industrial robots Safety. etc. 2) Labor Safety and Sanitation Law, etc. Caution: Operator error could result in injury or equipment damage.
Low Speed Cylinder Double Acting, Single Rod Series CQSX 12, 16, 20, 25 How to Order CQSX D B 20 30 Without auto switch 30 F9BW B 20 CDQSX D With auto switch Number of auto switches Built-in magnet 2 pcs. 1 pc. n pcs.
Example Rail mounting style CDJ2XB10-45-A Band mounting style CDJ2XB16-60-B Applicable Auto Switch/Refer to page 10-20-1 for further information on auto switches.
Example) For 10-CQSXB25-47D, a 3mm width spacer is installed in a standard stroke 10-CQSXB25-50D cylinder.
Contents Bore size (mm) Seal Kit List Description Material Note No. 20 25 32 40 50 63 80 100 MGP20-B-PS MGP25-B-PS MGP32-B-PS MGP40-B-PS MGP50-B-PS MGP63-B-PS MGP80-B-PS MGP100-B-PS @4 @5 @6 @7 #5 #6 $4 $5 Piston seal NBR Set of left nos. @4, @5, @6, @7, #5, $4, $5 Rod seal NBR Gasket A NBR Gasket B NBR Set of left nos. @4, @5, @6, @7, #5, #6, $4, $5 Set of left nos. @4, @5, @6, @7, #5, $4
A B A B A B A B A B A B Hs Hs Hs Hs Ht Hs Ht Hs Hw Hs Hw 3.5 1.5 6.5 4.5 0 0 0.5 0 2 0 4 2 11.5 9.5 40 37 38.5 69 81 69 71.5 31.5 81.5 38 31.5 73 3.5 1.5 6.5 4.5 0 0 0.5 0 2 0 4 2 11.5 9.5 50 42 42 77 86.5 77 76.5 35.5 86.5 42 35.5 78.5 6 5 9 2.5 1.5 3 2 8 4.5 3.5 6.5 5.5 14 13 63 49 46.5 91 93.5 91 83.5 43 93.5 47 43 85.5 9.5 7.5 4.5 12.5 6 4 6.5 4.5 8 6 10 8 17.5 15.5 80 107 57.5 53.5 107
B B B B B B RE A B 0 (0) 0 (0) 0 (2.5) 2 (6) 4 (7.5) 0 (0.5) 0 (0.5) 0 (3) 2.5 (6.5) 4.5 (8) 3.5 (6.5) 3.5 (6.5) 5.5 (9) 8.5 (12.5) 10.5 (14) 0 (2) 0 (2) 1 (4.5) 4 (8) 6 (9.5) 1 (4) 1 (4) 3 (6.5) 6 (10) 8 (11.5) 8.5 (11.5) 8.5 (11.5) 10.5 (14) 13.5 (17.5) 15.5 (19) 0.5 (3.5) 0.5 (3.5) 2.5 (6) 5.5 (9.5) 7.5 (11) 1 (0) 1 (0) 5.5 (1.5) 8.5 (4) 10.5 (6.5) 1.5 (0) 1.5 (0) 6 (2) 9 (4.5) 11 (7)
B B B B B B RE A B 0 (0) 0 (0) 0 (2.5) 2 (6) 4 (7.5) 0 (0.5) 0 (0.5) 0 (3) 2.5 (6.5) 4.5 (8) 3.5 (6.5) 3.5 (6.5) 5.5 (9) 8.5 (12.5) 10.5 (14) 0 (2) 0 (2) 1 (4.5) 4 (8) 6 (9.5) 1 (4) 1 (4) 3 (6.5) 6 (10) 8 (11.5) 8.5 (11.5) 8.5 (11.5) 10.5 (14) 13.5 (17.5) 15.5 (19) 0.5 (3.5) 0.5 (3.5) 2.5 (6) 5.5 (9.5) 7.5 (11) 1 (0) 1 (0) 5.5 (1.5) 8.5 (4) 10.5 (6.5) 1.5 (0) 1.5 (0) 6 (2) 9 (4.5) 11 (7)