(mm) C D MHZ2-10D-X46 MHZ2-16D-X46 MHZ2-20D-X46 MHZ2-25D-X46 Model A B D9 4.5 11 5.2 7.5 7 13 5.8 2010 7 15 6 10.7 7 20 6.2 Dimensions other than the above are identical to the standard type; refer to pages 12-2-33 to 12-2-36. Reference values to establish criteria for needle adjustment.
(mm) C D MHZ2-10D-X46 MHZ2-16D-X46 MHZ2-20D-X46 MHZ2-25D-X46 Model A B D9 4.5 11 5.2 7.5 7 13 5.8 2010 7 15 6 10.7 7 20 6.2 Dimensions other than the above are identical to the standard type; refer to pages 12-2-33 to 12-2-36. Reference values to establish criteria for needle adjustment.
JIS B 8370: General rules for pneumatic equipment. JIS B 8361: General rules for hydraulic equipment. JIS B 9960-1: Safety of machinery Electrical equipment of machines. (Part 1: General requirements) JIS B 8433-1993: Manipulating industrial robots Safety. etc. 2) Labor Safety and Sanitation Law, etc. Caution: Operator error could result in injury or equipment damage.
A B A B B A B A B A B B A B A B A 10 16 2 2 6 6 2.5 2.5 1.5 1.5 0.5 0.5 4.5 4.5 3 3 3.5 3.5 8.5 8.5 0.5 0.5 2.5 2.5 6.5 6.5 3 3 2 2 1 1 5 5 3.5 3.5 4 4 9 9 1 1 Note) Adjust the auto switch after confirming the operating conditions in the actual setting.
U B A CHA B A Related Products D-F7 D-F7W D-J79 D-J79W D-A7 D-A7H D-A8 D-A8H D-F7V D-F7WV D-F7BA D-F7BAV D-F7NT D-F79F D-J79C D-A73C D-A80C 32 to 100 DApprox. U B A Approx.
Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.
Auto Switch Proper Mounting Position (Detection at Stroke End) D-A93 12 16 to 25 A B W A B W D-M9B/M9N 12 16 to 25 A B W A B W B D-A93 B D-M9B/M9N/M9P Bore size (mm) A 11.5 W 4 A 15.5 W 5.5 12 16 20 25 0.5 4.5 12 0 4.5 16 4 6 16 3.5 1 20 7.5 2.5 17 5.5 -1 21 9.5 0.5 Specific Product Precautions Be sure to read this before handling. Mounting Caution 1.
A B For details about certified products conforming to international standards, visit us at www.smcworld.com.
B 1.8 1.6 Groove position of auto switch A 10.4 12.8 Model MHK2-12 MHK2-16 A B Dimensions A and B of other models are same as standard switch grooves. Standard switch grooves 12-6-17
B 1.8 1.6 Groove position of auto switch A 10.4 12.8 Model MHK2-12 MHK2-16 A B Dimensions A and B of other models are same as standard switch grooves. Standard switch grooves 12-6-17
Extension locking F Retraction locking B CLJ2 CLM2 1 CLG1 Drop prevention Emergency stop CL1 A MLGC 2 B A CNG B MNB CNA A A CNS 3 B B CLS CLQ A RLQ A 4 B MLU B MLGP ML1C Mounting Caution 1. Be sure to connect the load to the rod end with the cylinder in an unlocked condition. If this is done in the locked state, it may cause damage to the lock mechanism. 2.
5 A B CL A CL1 MLGC B Extension locking Without magnet !0o#1 @8 t CNG MNB Section A-A' Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com CNA !3 @0 CNS CLS Section B-B' (Both ends tapped) CLQ MLGP Retraction locking Section B-B' (Through-hole) !4 !7 !
Calculate the moment of inertia for A and B separately as shown in the figures on the right. A part B part Procedure Calculation Calculation example 1. Check the operating conditions, dimensions of attachment, etc. Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.
Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com c B part e f d 2.
If using other screws, switch may be damaged. 12-13-16 17 Solid State Switch Direct Mounting Style D-Y59 /D-Y69 /D-Y7P(V) A B A B For details about certified products conforming to international standards, visit us at www.smcworld.com.
If using other screws, switch may be damaged. 12-13-16 17 Solid State Switch Direct Mounting Style D-Y59 /D-Y69 /D-Y7P(V) A B A B For details about certified products conforming to international standards, visit us at www.smcworld.com.
M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C
M9 M9V F9W(V) B Electrical entry is in the direction C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV D-M9 D-F9W D-M9V D-F9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C
C (mm) Proper mounting position Proper mounting position Proper mounting position D-M9 D-M9W D-M9V D-M9WV D-M9 D-M9W D-M9V D-M9WV D-M9 D-M9W D-M9V D-M9WV Model Model Model A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E A B C D E 16.5 25 4.5 18.5 49 6.5 7.5 38 21 MIW8-8D MIS12
For AC10-A For AC20-B For AC25-B For AC30-B For AC40-B For AC40-06-B For AC50-B For AC55-B For AC60-B For AC10A-A For AC20A-B For AC30A-B For AC40A-B For AC40A-06-B For AC50A-B For AC60A-B For AC10B-A For AC20B-B For AC25B-B For AC30B-B For AC40B-B For AC40B-06-B For AC50B-B For AC55B-B For AC60B-B For AC20C-B For AC25C-B For AC30C-B For AC40C-B For AC40C-06-B For AC20D-B For AC30D-B