C B R H J H IN OUT OUT IN OUT OUT A P Min. clearance for maintenance A Min. clearance for maintenance AL10, AL20 AL30, AL40, AL40-06, AL50, AL60 Applicable model Drain cock with barb fitting With drain cock With drain cock Metal bowl Metal bowl with level gauge Metal bowl with drain cock Metal bowl with drain cock Metal bowl with drain cock & level gauge Optional B specifications B B B B
Pressure Control Equipment Industrial Filters A !4 Spring return !5 !6 !4 Spring extend A A-A section (port on rod end) A-A section (port on rod end) With auto switch Spring return Spring extend !4 !5 !6 !4 A A Auto Switch Auto Switch A-A section (port on rod end) A-A section (port on rod end) The numbers are the same as the "Construction" of the CQ2 series catalog (CAT.ES20-205).
*-A AR30-A AFM30-A AL30-A AR30-A AFM30-A AL30-A AR30-A AF40-A AF40-A AW40-A AF40-A AW40-A AC40*-A AR40-A AFM40-A AL40-A AR40-A AFM40-A AL40-A AR40-A AF40-06-A AF40-06-A AW40-06-A AF40-06-A AW40-06-A AC40*-06-A AR40-06-A AFM40-06-A AL40-06-A AR40-06-A AFM40-06-A AL40-06-A AR40-06-A 10 Option / Semi-standard : Select one each for a to m.
AL10 AL20 AL30 AL40 AL40-06 AL50 AL60 OUT IN No.
AL10 AL20 AL30 AL40 AL40-06 AL50 AL60 OUT IN No.
Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air
Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air
In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
HRX-OM-Q026-V Operation Manual Installation Operation Original Instructions Thermo Chiller HRSH Series HRSH100-A-20HRSH100-A-40HRSH100-A-20-S HRSH150-A-20HRSH150-A-40HRSH150-A-20-S HRSH200-A-20HRSH200-A-40HRSH200-A-20-S HRSH250-A-20HRSH250-A-40HRSH250-A-20-S HRSH300-A-20HRSH300-A-40HRSH100-W-20HRSH100-W-40HRSH100-W-20-S HRSH150-W-20HRSH150-W-40HRSH150-W-20-S HRSH200-W-20HRSH200-W-40HRSH200
Part name Main material AC50(A,B)-D AC20(A,B,C,D)-D AC30(A,B,C,D)-D AC40(A,B,C,D)-D AC40(A,B,C,D)-06-D AC60(A,B)-D (1) Seal HNBR Y220P-050S Y320P-050S Y420P-050S Y520P-050S Y620P-050S Note 1) The number in the table and structural drawing is consistent with the number in [8. How to Replace the Products] (P23) and [9. Disassembly Drawing] (P24).
Remove a housing from a body by rotating 4 mounting screws counterclockwise with a hexagon wrench key. Hexagon wrench key Nominal: 5 2) Remove the valve guide. Hold the valve guide with a spanner on the spanner flat to rotate it counterclockwise and remove the valve guide. Spanner Nominal: 30 3) Remove the valve spring. 4) Remove the valve assembly.
Remove a housing from a body by rotating 4 mounting screws counterclockwise with a hexagon wrench key. Hexagon wrench key Nominal: 5 2) Remove the valve guide. Hold the valve guide with a spanner on the spanner flat to rotate it counterclockwise and remove the valve guide. Spanner Nominal: 30 3) Remove the valve spring. 4) Remove the valve assembly.
Manifold overall length Manifold overall length Approx. 29% reduced SY5000 manifold SY5000 3 stations SY3000 manifold SY3000 4 stations Mixed manifold SY5000 3 stations SY3000 4 stations For serial transmission EX260 A B A B A B A B A B A B A B A B A B A 14 A B A 14 A B A 14 A B A 14 A B A 14 A B A 14 Installation space A A A A A A A A B B B B B B B B 12 B 12 B 12 B 12 B 12 B 12 B 136.7 mm
AC30*-B AR30-B AFM30-A AL30-A AR30-B AFM30-A AL30-A AR30-B AF40-A AF40-A AW40-B AF40-A AW40-B AC40*-B AR40-B AFM40-A AL40-A AR40-B AFM40-A AL40-A AR40-B AF40-06-A AF40-06-A AW40-06-B AF40-06-A AW40-06-B AC40*-06-B AR40-06-B AFM40-06-A AL40-06-A AR40-06-B AFM40-06-A AL40-06-A AR40-06-B AF50-A AW60-B AF50-A AC50*-B AR50-B AL50-A AR50-B AL50-A AF60-A AF60-A AC55*-B AR50
For a facility with a large installation area that can vent the air naturally: Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility with a small installation area that cannot vent the air naturally: Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
For a facility with a large installation area that can vent the air naturally: Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility with a small installation area that can not vent the air naturally: Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
For a facility with a large installation area that can vent the air naturally: Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility with a small installation area that cannot vent the air naturally: Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.