, AWD30 30 30 32 AC40 AF40, AR40, AW40 AL40, AFM40, AFD40 AWM40, AWD40 36 36 32 AC40-06, AF40-06, AR40-06, AW40-06 AL40-06, AFM40-06, AFD40-06 E500-06 44 40 32 3/4 E600-06 E600-10 3/4 1 AC50, AC55, AC60, AC50B, AC55B, AC60B AF50, AR50, AL50, AF60, AR60, AL60 53 48 35 Notes) in model numbers indicates a thread type.
Factory mounting of a piping adapter on the AC models is available as a special order.
*-A AR30-A AFM30-A AL30-A AR30-A AFM30-A AL30-A AR30-A AF40-A AF40-A AW40-A AF40-A AW40-A AC40*-A AR40-A AFM40-A AL40-A AR40-A AFM40-A AL40-A AR40-A AF40-06-A AF40-06-A AW40-06-A AF40-06-A AW40-06-A AC40*-06-A AR40-06-A AFM40-06-A AL40-06-A AR40-06-A AFM40-06-A AL40-06-A AR40-06-A 10 Option / Semi-standard : Select one each for a to m.
AL10 AL20 AL30 AL40 AL40-06 AL50 AL60 OUT IN No.
AL10 AL20 AL30 AL40 AL40-06 AL50 AL60 OUT IN No.
Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air
Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air
In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.
HRX-OM-Q026-V Operation Manual Installation Operation Original Instructions Thermo Chiller HRSH Series HRSH100-A-20HRSH100-A-40HRSH100-A-20-S HRSH150-A-20HRSH150-A-40HRSH150-A-20-S HRSH200-A-20HRSH200-A-40HRSH200-A-20-S HRSH250-A-20HRSH250-A-40HRSH250-A-20-S HRSH300-A-20HRSH300-A-40HRSH100-W-20HRSH100-W-40HRSH100-W-20-S HRSH150-W-20HRSH150-W-40HRSH150-W-20-S HRSH200-W-20HRSH200-W-40HRSH200
Part name Main material AC50(A,B)-D AC20(A,B,C,D)-D AC30(A,B,C,D)-D AC40(A,B,C,D)-D AC40(A,B,C,D)-06-D AC60(A,B)-D (1) Seal HNBR Y220P-050S Y320P-050S Y420P-050S Y520P-050S Y620P-050S Note 1) The number in the table and structural drawing is consistent with the number in [8. How to Replace the Products] (P23) and [9. Disassembly Drawing] (P24).
Remove a housing from a body by rotating 4 mounting screws counterclockwise with a hexagon wrench key. Hexagon wrench key Nominal: 5 2) Remove the valve guide. Hold the valve guide with a spanner on the spanner flat to rotate it counterclockwise and remove the valve guide. Spanner Nominal: 30 3) Remove the valve spring. 4) Remove the valve assembly.
Remove a housing from a body by rotating 4 mounting screws counterclockwise with a hexagon wrench key. Hexagon wrench key Nominal: 5 2) Remove the valve guide. Hold the valve guide with a spanner on the spanner flat to rotate it counterclockwise and remove the valve guide. Spanner Nominal: 30 3) Remove the valve spring. 4) Remove the valve assembly.
Min. Dripping Flow Rate(l/min): 40, Oil Storage Capacity(cm3): 135, Case: [Resin] Polycarbonate Case, Inlet Side Connection Type: G, Inlet Side Plumbing Thread Nominal: 3/8, Outlet Side Connection Type: G, Outlet Side Plumbing Thread Nominal: 3/8, Drain Exhaust: [Not Provided] No Drain Cock, Flow Direction: [Right] From Left to Right, Size of Body: 40, Accessory: Without optional
Body Size: 40, Thread: F (G), Port Size: 03 (3/8), Mounting: None, Semi-Standard, Body Size 10: Standard, Semi-Standard, Body Size 20: Standard, Semi-Standard, Body Size 30, 40, 50 & 60: Standard
AC30*-B AR30-B AFM30-A AL30-A AR30-B AFM30-A AL30-A AR30-B AF40-A AF40-A AW40-B AF40-A AW40-B AC40*-B AR40-B AFM40-A AL40-A AR40-B AFM40-A AL40-A AR40-B AF40-06-A AF40-06-A AW40-06-B AF40-06-A AW40-06-B AC40*-06-B AR40-06-B AFM40-06-A AL40-06-A AR40-06-B AFM40-06-A AL40-06-A AR40-06-B AF50-A AW60-B AF50-A AC50*-B AR50-B AL50-A AR50-B AL50-A AF60-A AF60-A AC55*-B AR50
To release residual pressure, select a model with a back flow mechanism.
2 w i A A' Cylinder tube sectional view A-A !
L4 L4 L5 A L5 D3 D3 T T D2 L1 D2 L1 L2 L2 AS ASP Metric Size ASN A M1 L5 Max.
For a facility with a large installation area that can vent the air naturally: Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility with a small installation area that cannot vent the air naturally: Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.