SMC Corporation of America
Elite Part Number Search
Search Results "AL30-F03-23-A"

Bowl assembly for the AL30 to AL60 models comes with a bowl guard (steel band material). (except when the bowl material is metal) Please consult SMC for psi and F unit display specifications. When switching bowl materials from a polycarbonate or nylon product to a metal bowl with a level gauge, the oil feed tube assembly must be replaced.

Bowl assembly for the AL30 to AL60 models comes with a bowl guard (steel band material). (except when the bowl material is metal) Please consult SMC for psi and F unit display specifications. When switching bowl materials from a polycarbonate or nylon product to a metal bowl with a level gauge, the oil feed tube assembly must be replaced.

2 w i A A' Cylinder tube sectional view A-A !

For a facility having a large installation area (that can vent the air naturally): Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level.

For a facility having a large installation area (that can vent the air naturally): Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level.

HRX-OM-Q026-V Operation Manual Installation Operation Original Instructions Thermo Chiller HRSH Series HRSH100-A-20HRSH100-A-40HRSH100-A-20-S HRSH150-A-20HRSH150-A-40HRSH150-A-20-S HRSH200-A-20HRSH200-A-40HRSH200-A-20-S HRSH250-A-20HRSH250-A-40HRSH250-A-20-S HRSH300-A-20HRSH300-A-40HRSH100-W-20HRSH100-W-40HRSH100-W-20-S HRSH150-W-20HRSH150-W-40HRSH150-W-20-S HRSH200-W-20HRSH200-W-40HRSH200

In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.

Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air

Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air

For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.

Factory mounting of a piping adapter on the AC models is available as a special order.

L4 L4 L5 A L5 D3 D3 T T D2 L1 D2 L1 L2 L2 AS ASP Metric Size ASN A M1 L5 Max.

E F F E E B C Cross interface E: 4-Rc F: Without thread A D E Model Y14-M5 Y24-01 Y24-02 Y34-01 Y34-02 Y44-02 Y44-03 Y54-03 Y54-04 Applicable model AC10 Port size M5 1/8 1/4 1/8 1/4 1/4 3/8 3/8 1/2 C 14 D 25 B 16 A 23 AC20 22 40 40 40 AC25, AC30 28 48 43 49 AC40 Cautions in Mounting 36 54 48 60 62 When mounting a cross interface directly on the IN side of the lubricator, be sure to use a

Facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air vent on a wall at a low level.

For a facility having a large installation area (that can vent the air naturally): Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level.

HRX-OM-Y120-D Operation Manual Communication function Thermo-chiller Air-Cooled refrigerated type Water-Cooled refrigerated type HRL100-A-20/40 HRL100-W-40 HRL200-A-20/40 HRL200-W-40 HRL300-A-20/40 HRL400-A-40 Keep this manual available whenever necessary 2023 SMC CORPORATION All Rights Reserved To Users, Thank you for purchasing SMCs Thermo chiller (hereinafter referred to as the product

HRX-OM-W069-A Operation Manual Communication function Thermo-chiller Air-Cooled refrigerated type HRL100-A HRL200-A HRL300-A Keep this manual available whenever necessary 2023 SMC CORPORATION All Rights Reserved To Users, Thank you for purchasing SMCs Thermo chiller (hereinafter referred to as the product).

C0.5 file chamfer AL B MM R sphere TP R sphere DC 30 H W1 T H H H Symbol: A12 Symbol: A13 Symbol: A14 Symbol: A15 30 C 30 DA DA C0.5 R sphere DA DA C AL MM 30 A H T W1 A H C A H H Symbol: A16 Symbol: A17 Symbol: A18 Symbol: A19 MM 30 MM 30 DA MM 30 AL MM 30 H A H A A C H A H Symbol: A20 Symbol: A21 Symbol: A22 Symbol: A23 DA 30 30 DA L RD 30 MM 30 MM MM DB DB T T C B A H A A A L K H W H H

Position (Standard type) Auto switch model D-Y59l D-Y69l D-Y7P D-Y7PV D-Y7H D-Y7lW D-Y7lWV D-Z7l D-Z8l D-M9l D-M9lV D-M9lW D-M9lWV D-M9lA D-M9lAV D-F5l D-J59 D-F59F D-F5NT D-A5l D-A6l D-A59W D-G39 D-K39 D-A3l D-A44 D-A9l D-A9lV D-P3DWA D-P4DW Bore size A B A B A B A B A B A B A B A B A B A B 32 10 8 6 4 6.5 4.5 11.5 9.5 0 0 4 2 0 0 3.5 1.5 5.5 3.5 3 1 40 9 9 5 5 5.5 5.5 10.5 10.5 0 0 3 3

8-8 8.4.5 HRSE024-A-20/23-(T) . 8-8 8.5 Pump capacity . 8-9 8.5.1 HRSE012/018-A-10 . 8-9 8.5.2 HRSE012/018/024-A-20/23 . 8-9 8.5.3 OPTION-T (HRSE012/018-A-10-T). 8-10 8.5.4 OPTION-T (HRSE012/018/024-A-20/23-T) . 8-10 8.6 Sample DoC.