SMC Corporation of America
Elite Part Number Search
Search Results "AL30-03-38-A"

Note 3) Bowl assembly for AL30 to AL60 comes with a bowl guard (steel band material). 52 AL10 to 60 Dimensions AL10 AL20 L D Bracket (option) G F Port size K M A Port size C B R C J H OUT OUT IN OUT OUT IN B R P Min. clearance for maintenance Min. clearance for maintenance A AL50, 60 AL30, 40 L D D L Port size Bracket (option) Bracket (option) G F G F Port size M K M K E J C B R C B R H

Note 3) Bowl assembly for AL30 to AL60 comes with a bowl guard (steel band material). 14-2-63 Series AL10 to 60 Dimensions AL10 AL20 L D Bracket (Option) G F Port size K M A Port size C B R C J H OUT OUT IN OUT OUT IN B R P Min. clearance for maintenance Min. clearance for maintenance A AL50/60 AL30/40 L D D L Port size Bracket (Option) Bracket (Option) G F G F Port size M K M K E J C B R

AC-OMX0051-D PRODUCT NAME Air Combination MODEL / Series / Product Number AC20(A)-(F,N)01~(F,N)02(C,E,E1,E2,E3,E4,G,M)-(1,2,3,6,C,J,N,R,Z,ZA)-D AC20B,C,D -(F,N)01~(F,N)02(C,E,E1,E2,E3,E4,G,M)-(1,2,6,C,J,N,R,Z,ZA)-D AC30(A)-(F,N)02~(F,N)03(C,D,E,E1,E2,E3,E4,G,M)-(1,2,3,6,8,J,N,R,W,Z,ZA)-D AC30B,C,D -(F,N)02~(F,N)03(C,D,E,E1,E2,E3,E4,G,M)-(1,2,6,8,J,N,R,W,Z,ZA)-D AC40(A)-(F,N)02~(F,N)04(C,D

(Pitch) P = 16 50 4(A) port side : Blue (For rubber seal) : Gray (For metal seal) 2(B) port side : Yellow 2 x M2.6 2 x 4-40 UNC [For N or T thread] 24.1 16 (7.9) 4 x 4.5 (For mounting) A B A B A 14 A B A 14 A B A 14 A B A 14 106.2 A 14 116.6 81.6 30.2 20 52.2 12 B 12 B 12 B 12 B 12 B L1 (Max. 3) 6.1 (Station n) (Station 1) -74.3 (Slide locking manual override) (74.7) 68.6 60.7 38 Panel fitting

Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air

For a facility having a large installation area (that can vent the air naturally): Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level.

For a facility having a large installation area (that can vent the air naturally): Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level.

Installation at indoor site 1 In case of facility having a large installation area (that can vent the air naturally) Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2 In case of facility having a small installation area (that can not vent the air naturally) Make a forced air exhaust vent on a wall at a high level and an air

HRX-OM-Q026-V Operation Manual Installation Operation Original Instructions Thermo Chiller HRSH Series HRSH100-A-20HRSH100-A-40HRSH100-A-20-S HRSH150-A-20HRSH150-A-40HRSH150-A-20-S HRSH200-A-20HRSH200-A-40HRSH200-A-20-S HRSH250-A-20HRSH250-A-40HRSH250-A-20-S HRSH300-A-20HRSH300-A-40HRSH100-W-20HRSH100-W-40HRSH100-W-20-S HRSH150-W-20HRSH150-W-40HRSH150-W-20-S HRSH200-W-20HRSH200-W-40HRSH200

For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.

For a facility having a large installation area (that can vent the air naturally): Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility having a small installation area (that can not vent the air naturally): Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level.

Note5) Note6) Y110-M5-A Y210-01-A Y310-(01)-A Y410-(02)-A Y510-(02)-A Y610-03-A Y610-(03)-A VHS40-02A VHS20-01A VHS30-02A VHS50-06A Pressure relief 3 port valve Note6) VHS40-03A VHS40-06A Attachment VHS20-02A VHS30-03A VHS50-10A VHS40-04A E400-02-A E200-01-A E300-02-A E400-03-A E600-06-A Piping adapter Note6) E100-M5-A E200-02-A E300-03-A E500-06-A E400-04-A E600-10-A E200-03-A E300-04

eJt Alj0to60 Drain cock with barb frtling:06 x 04 nylon tube AL30 to 60 Port size Drspay -a 15 Jor p odJcl dmp pl"_e ano p,es"urF qdJqe DSI "l AL10 to 60 Wfen mo,e lhan one specJcation s reqL red,Indcale n ascend ng nume ca then atphabeLLcaL ode( Nole)For M5 a.d \PTthreaa ypes Accessory a a a a a a a a a a a a a a a a a a a a a a a a a a a a a o a a a a a a a a a a a a a a a a a a o a a

Applicable Model 1/4, 3/8 1/4, 3/8, 1/2 3/4 1 AF30 AF40-06 AF50 AF60 AF40 Model Port size 3/4, 1 30 AF X2141 03 With element service indicator A special body type is required to mount the clogging checker. It cannot be mounted on a standard body. Option/Semi-standard: Select one each for a to f.

NPT 1/4 NPT 3/8 NPT 1/2 C 40 53 70 F 40 53 70 E 36 38 40 G 57 73 H 28 30 35 J 30 41 50 T M4 X 0.7 M4 X 0.7 M5 X 0.8 K 27 40 54 S 32 44 60 AL20 AL30 AL40 5 4 6 S F 3 7 8 2 9 1 W M 4 T BRACKET MOUNTING THREAD R C G J Q P K N 2 A E H L IN OUT Bracket (Optional) D Sight glass assy not applicable to AL20 9 Accessories 2-10 Residual Pressure Relief 3 Port Valve (V) 1 With the use of a 3 port valve

For a facility with a large installation area that can vent the air naturally: Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility with a small installation area that can not vent the air naturally: Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.

For a facility with a large installation area that can vent the air naturally: Make an air outlet on a wall at a high level and air inlet on a wall at a low level, to allow for adequate airflow. 2. For a facility with a small installation area that cannot vent the air naturally: Make a forced air exhaust vent on a wall at a high level and an air inlet on a wall at a low level. 3.

(Hook spanner Nominal: 34/38) 2) Remove the element. Hold the element with a spanner to rotate it counterclockwise and remove the element. Spanner Nominal: 7 AFM20 AFD20 Assembly 3) Mount the element. Hold the element with a spanner to rotate it clockwise and mount the element. Refer to the Check item for the tightening torque.

(Hook spanner Nominal: 34/38) 2) Remove the element. Hold the element with a spanner to rotate it counterclockwise and remove the element. Spanner Nominal: 7 AFM20 AFD20 Assembly 3) Mount the element. Hold the element with a spanner to rotate it clockwise and mount the element. Refer to the Check item for the tightening torque.