SMC Corporation of America
Elite Part Number Search
Search Results "LER50K-2-R1"

(n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 60 + 30 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 65 + 30 (n 4) 2 70 + 30 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 10 + 30 n (n = 2, 4, 6, 8 ) Note 1) (n = 4, 8, 12, 16 ) Note 2) 2 (Different surfaces, Same surface) 1 95 100 D-M9A 85 15 80 (n 2) 2 80 + 40 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 85 + 40 (n 4) 2 (n = 4, 8, 12, 16 ) Note 2) 95 + 40 (n 4) 2 100 +

8 MB n (Same side) 2 (Different sides or Same side) 20 25 25 MB1 (n2) 2 (n2) 2 (n2) 2 25 + 55 n = 2, 4, 6, 8 20 + 55 n = 2, 4, 6, 8 25 + 55 n = 2, 4, 6, 8 n (Same side) D-A59W CA2 1 15 25 25 D-F5 D-J5 D-F5W D-J59W D-F5BAL D-F59F 15 25 25 2 (Different sides or Same side) CS1 (n2) 2 (n2) 2 (n2) 2 15 + 55 n = 2, 4, 6, 8 25 + 55 n = 2, 4, 6, 8 25 + 55 n = 2, 4, 6, 8 n (Same side) C76 1 10 25

n = 2, 3, 4 60 + 30 (n 2) n = 2, 4, 6, 8 100 + 100 (n 2) n = 2, 3, 4 90 + 100 (n 2) n = 2, 4, 6, 8 65 + 30 (n 2) n = 2, 4, 6, 8 75 + 30 (n 2) n = 2, 4, 6, 8 80 + 30 (n 2) n = 2, 4, 6, 8 85 + 30 (n 2) n = 2, 4, 6, 8 95 + 100 (n 2) n = 2, 4, 6, 8 100 + 100 (n 2) n = 2, 4, 6, 8 105 + 100 (n 2) n = 2, 4, 6, 8 110 + 100 (n 2) n = 2, 4, 6, 8 D-A3 D-G39 D-K39 n (Different sides) n (Same

n = 2, 3, 4 60 + 30 (n 2) n = 2, 4, 6, 8 100 + 100 (n 2) n = 2, 3, 4 90 + 100 (n 2) n = 2, 4, 6, 8 65 + 30 (n 2) n = 2, 4, 6, 8 75 + 30 (n 2) n = 2, 4, 6, 8 80 + 30 (n 2) n = 2, 4, 6, 8 85 + 30 (n 2) n = 2, 4, 6, 8 95 + 100 (n 2) n = 2, 4, 6, 8 100 + 100 (n 2) n = 2, 4, 6, 8 105 + 100 (n 2) n = 2, 4, 6, 8 110 + 100 (n 2) n = 2, 4, 6, 8 D-A3 D-G39 D-K39 n (Different sides) n (Same

2 2 2 2 2 3 3 28 32 38 46 58 70 82 100 5.5 5.5 6.6 6.6 9 11 11 14 6 7 7 8 9 9 11 14 C85 C76 CG1 MB End boss is machined on the flange for E.

VEX1-17 1 pc. 0 1 For VY1B0 B 01 1 8 2 Common external pilot 210 2 Note 1) 10 stations 2 stations 1 Internal pilot 0 1 For VY120 2 1 4 02 Piping thread type 2 Common external pilot 8 2 8 stations Nil Rc G Note 2) A B C 3 8 1 4 2 stations 1 F N Internal pilot 0 1 For VY140 4 3 8 NPTF NPT 2 Common external pilot T 6 3 8 1 2 6 stations VY manifold pilot type Body size B, 2 Note 1) In the case

OO 3.24 5 . 1 2 8.01 Techn Vacuum System Specification (continued) 2.

Obtain the actual moment of inertia ). ) = )1 + )2 m1, m2: Mass of load 1 and 2 r1, r2: Radius of load 1 and 2 L: Distance from the shaft to the center of gravity of load 2 Calculation Example m1 = 2.5 kg, m2 = 0.5 kg, r1 = 0.1 m, r2 = 0.02 m, L = 0.08 m 0.12 )1 = 2.5 x = 1.25 x 10-2 kgm2 2 0.022 )2 = 0.5 x + 0.5 x 0.082 = 0.33 x 10-2 kgm2 2 ) = (1.25 + 0.33) x 10-2 = 1.58 x 10-2 kgm2 Front

. 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping . 2 3 2 2 4 Drain Tube . 2 3 2 2 5 Electric wiring . 2 4 2 3 Cautions about Reinstallation . 2 6 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation .

rules and safety requirements for systems and their components *2) JIS B8370 URLhttps://www.smcworld.com/ i i-1 . i-1 i-1-1 . i-2 i-2 . i-3 i-2-1 . i-3 i-2-2 . i-4 i-2-3 . i-4 i-2-4 . i-4 i-2-5 . i-4 i-2-6 . i-5 i-2-7 . i-5 i-2-8 . i-6 i-2-9 . i-6 i-3 . i-7 i-4 . i-8 1 1-1 . 1-1 2 2-1 . 2-1 2-2 . 2-1 2-2-1 . 2-1 2-2-2 . 2-2 2-2-3 . 2-2 2-2-4 . 2-2 2-2-5 . 2-3

) (n = 2, 4, 6, 8 ) 2 (Different surfaces, Same surface) 1 15 105 110 115 D-M9 D-M9W 15 + 40 (n 2) 2 105 + 40 (n 4) 2 110 + 40 (n 4) 2 115 + 40 (n 4) 2 n (n = 2, 4, 6, 8 ) (n = 4, 8, 12, 16 ) (n = 4, 8, 12, 16 ) (n = 4, 8, 12, 16 ) 2 (Different surfaces, Same surface) 1 10 80 85 90 D-M9V D-M9WV 10 + 30 (n 2) 2 80 + 30 (n 4) 2 85 + 30 (n 4) 2 90 + 30 (n 4) 2 n (n = 2, 4, 6, 8 ) (n

No. of auto switches mounted 2 Different sides C85 Auto switch model Same side n Different sides 1 Same side C95 D-C7 D-C80 D-H7 D-H7W D-H7BAL D-H7NF D-C73C D-C80C D-H7C 10 50 15 50 + 45 (n 2) n 2 2 15 + 45 ( ) (n = 2, 4, 6) CP95 10 60 15 60 + 45 (n 2) NCM NCA n 2 2 15 + 50 ( ) (n = 2, 4, 6) 10 65 15 65 + 50 (n 2) Dn 2 2 D-B5/B6 D-G5NTL 15 + 50 ( ) (n = 2, 4, 6) 75 10 15 -X 75 + 55

Description 1 Piston seal 2 large 1 small 2 1 each large and small 2 1 2 Governor assembly 4 3 Check valve 2 4 Gasket 2 Rod seal 5 1 8 8 12 Mounting screw 6 12 7 Cover C assembly 1 Grease pack 1 2 1 2 1 The grease pack has 10 g of grease.

2 2 Installation . 2 2 2 2 1 Location . 2 2 2 2 2 Tie Down . 2 3 2 2 3 Air piping . 2 3 2 2 4 Drain Tube . 2 3 2 2 5 Electric Wiring . 2 4 2 3 Cautions for Reinstallation . 2 6 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation

for systems and their components *2) JIS B8370 URLhttps://www.smcworld.com/ i i-1 . i-1 i-1-1 . i-1 i-2 . i-2 i-2-1 . i-2 i-2-2 . i-3 i-2-3 . i-3 i-2-4 . i-3 i-2-5 . i-3 i-2-6 . i-4 i-2-7 . i-4 i-2-8 . i-5 i-2-9 . i-5 i-3 . i-6 i-4 / . i-7 1-1 . 1-1 2-1 . 2-1 2-2 . 2-1 2-2-1 . 2-1 2-2-2 . 2-2 2-2-3 . 2-2 2-2-4 . 2-2 2-2-5 . 2-3 2-3 . 2-4 3 / 3-1 . 3-1 3-2 . 3

2 2 Installation . 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping . 2 2 2 2 4 Drain Tube . 2 3 2 2 5 Electric Wiring . 2 4 2 3 Cautions about reinstallation . 2 5 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term

. 2 2 2 2 1 Location . 2 2 2 2 2 Anchorage . 2 2 2 2 3 Air piping . 2 3 2 2 4 Drain Tube . 2 3 2 2 5 Electric wiring . 2 4 2 3 Cautions about Reinstallation . 2 5 Chapter 3 Operation / Shutdown 3 1 Check points before operation . 3 1 3 2 Operation . 3 1 3 3 Shutdown . 3 2 3 4 Cautions about restart . 3 2 3 5 Check points before restart . 3 2 3 6 Precautions for long-term non-operation .

J F 2 + 1 . 0 1 3 ) . A p k v = 27.94.4@2 + l-013) . Ap 222. l@2 + r-013) .