(Page 82) P_1 (n_1) (Selection of output set value) Setting of OUT1 output set value (Hysteresis) 1 R/W S16 2000 Y OUT1 setting Setting range Refer to "Settable range list". (Page 82) H_1 (Setting of OUT1 hysteresis) Setting of OUT1 hysteresis (Hysteresis) 2 R/W U16 200 Y Setting range Refer to "Settable range list".
bottom, (right) Note) Refer to the catalog for Stroke, Auto switch and Number of auto switches. 3 positions Names and Functions of Controller 11 Example of Internal Circuit and Wiring 12 Setting 15 Operation Characteristics 20 Specifications 21 10 Names and Functions of Controller (3 positions) Controller detail General 3 positions 5 positions General A 1 2 5 7 State of indicator light D
Nil (Rear piping) L (Bottom piping) Bracket A A1 ZS-46-A1 Bracket C A3 ZS-46-E B ZS-46-B Panel mount adapter E ZS-35-B D ZS-46-D Panel mount adapter + Front protective cover F ZS-35-E -9No.PS-OMX0002-A Accessories/Part numbers If an option is required independently, order with the following part numbers. Items Part No.
It is already built-in to the rectifier circuit. 110 VAC 50/60 Hz [115 VAC 50/60 Hz] 3 4 220 VAC 50/60 Hz [230 VAC 50/60 Hz] Electrical entry D With connector DIN terminal DC specifications of type D and DO is only available with 12 and 24 VDC. Power saving circuit is not available in the case of D or DO type.
17500 15 1000 20 2000 20 48 No.JXC-OMU0030-A 11.
2-2 32 LEYG-S032 32 LE-D-2-4 -16- 4.
Note 3) Bowl assembly for AF30 to 60 models comes with a bowl guard (steel band material). 26 AF10 to 60 Dimensions L AF10, 20 AF50, 60 A G D Bracket (Option) L Bracket (Option) F D M G K K F M J J B E E B H OUT IN C OUT IN H C Port size OUT OUT Port size o s AF10: 25 AF20: 40 Drain A P Min. clearance for maintenance AF30, 40, 40-06 L Bracket (Option) A D G F M K J B E Drain Min. clearance
D + + MADE IN JAPAN MADE IN JAPAN SMC SMC Model Port size A B C D E G H I K L M N P Q R AV2000-02-G AV2000-02-GS AV2000-02-D AV2000-02-DZ AV2000-02-Y AV2000-02-YZ AV3000-03-G AV3000-03-GS AV3000-03-D AV3000-03-DZ AV3000-03-Y AV3000-03-YZ AV4000-04-G AV4000-04-GS AV4000-04-D AV4000-04-DZ AV4000-04-Y AV4000-04-YZ AV5000-G AV5000-GS AV5000-D AV5000-DZ AV5000-Y AV5000-YZ M4 x 0.7 Depth 4.5 22
0.02 End plate (PBT) (UL94-V0) End plate (PBT) (UL94-V0) 0.01 0.005 50 100 200 500 1000 2000 5000 10 20 Sound absorbing material (PVF) Sound absorbing material (PVF) Air flow (l/min (ANR)) Noise Level (Initial conditions) Case (PBT) (UL94-V0) Case (PBT) (UL94-V0) Hexagonal flats D Hexagonal flats D AN202 to 402 Condition: 0.5 MPa at inlet pressure of solenoid valve Measurement distance:
Specification 1.1 LECS series driver 1.1.1 How to order L E S Y H 16 D S2 A 50 S 2 A1 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (3)Motor type (2)Motor mouting position (1) Size Symbol type Output D In-line 16 25 Size Compatible driver [W] R Right side parallel AC servo motor LECSA-S1 LECSA-S3 S2 100 16 L Left side parallel S3 200 25 (Incremental encoder) LECSB2-T5 LECSC2-T5 LECSS2-T5 T6 100
Table (1) Indication of Flow Characteristics Corresponding equipment Indication by international standard Other indications Standards conforming to ISO 6358: 1989 JIS B 8390: 2000 C, b Equipment for pneumatics JIS B 8390: 2000 Equipment: JIS B 8373, 8374, 8375, 8379, 8381 S Cv ANSI/(NFPA)T3.21.3: 1990 Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-
(SW1) (SW1) (SW2-3, SW2-4) (SW2-3, SW2-4) 0 33 0 49 1 34 1 50 2 35 2 51 3 36 3 52 4 37 4 53 5 38 5 54 6 39 6 55 ON ON 7 40 7 56 8 41 8 57 1 2 3 4 1 2 3 4 9 42 9 58 A 43 A 59 B 44 B 60 C 45 C 61 D 46 D 62 E 47 E 63 F 48 F 64 -14- 5. Parameter list (Driver side) Please configure the appropriate parameters to enable correct driver operation. Refer to [5.
Configuration One thermo-chiller for one master. 2 2 R D R D 3 3 S D S D 5 5 S G S G Master This product Do not connect any wire to other PIN numbers. Fig. 3-15 Connection of RS-232C HRS Series 3.3Installation 3-27 HRX-OM-S004 Chapter 3 Transport and Setting Up 3.4 Piping Piping port size Connect piping firmly.
Required installation space 8 e r o m r o m m 0 0 Required installation space for ventilation and maintenance 400 mm or more 800 mm or more 800 mm or more 400 mm = 15.7 inch 800 mm = 31.5 inch 800 mm or more Piping Caution 78.7 inch (2000 mm or more) 1.
Note 3) Bowl assembly for AL30 to AL60 comes with a bowl guard (steel band material). 14-2-63 Series AL10 to 60 Dimensions AL10 AL20 L D Bracket (Option) G F Port size K M A Port size C B R C J H OUT OUT IN OUT OUT IN B R P Min. clearance for maintenance Min. clearance for maintenance A AL50/60 AL30/40 L D D L Port size Bracket (Option) Bracket (Option) G F G F Port size M K M K E J C B R
Note 3) Bowl assembly for AL30 to AL60 comes with a bowl guard (steel band material). 52 AL10 to 60 Dimensions AL10 AL20 L D Bracket (option) G F Port size K M A Port size C B R C J H OUT OUT IN OUT OUT IN B R P Min. clearance for maintenance Min. clearance for maintenance A AL50, 60 AL30, 40 L D D L Port size Bracket (option) Bracket (option) G F G F Port size M K M K E J C B R C B R H
Operating time 20 s 30 s HRZ 10 s Voltage HRZD 5 s Min. 2 s HRW 1 s 0.5 s dV dt HECR = Voltage increase ratio 0.2 s 0.1 s dV HEC 0.05 s 0.02 s Time HEB 0.01 s 100 125 200 300 500 400 600 700 1000 2000 3000 4000 1500 dt HED Current (% for chiller main breaker volume) < For option B [With earth leakage breaker]> 3.
(per unit) Applicable model A B C D HRSE012-AHRSE018-AHRSE024-A240 (335) 505 (540) HRW HRS-TK003 HECR HRSE012-A--T HRSE018-A--T HRSE024-A--T 240 (335) 555 (590) HEC HEB HED HEA IDH Anchor bolt (M8) D C (Prepared by user) Anti-quake bracket Material: Zinc steel plate Mounting view A B w Bypass Piping Set Note) To be mounted by user.
(Value in the initial state) Vibration resistance: No malfunction occurred in one sweep test between 45 and 2000 Hz. Test was performed to axis and right angle directions of the main valve when pilot signal is ON and OFF.
P1 (D-sub 25P female) Cap P2 (D-sub 9P female) P3 (D-sub 9P male) Not used. (Only for maintenance) Power cable Contact signal cable Serial RS-485 communication cable Figure 3-10 Power Cable Insertion and Communication Cable Connection Correct phase rotation is required when attach the power cable to the breaker terminal.