Your search for LEY32 returned 30 result(s)
There were no hits with the full part number, but there were 14 hits in the keyword search.
There were no hits with the full part number, but there were 8 hits in the keyword search.
Product Information » New Products Search Results
LEL 20 LEM 0 LEY LEY 0 200 400 600 800 1000 1400 1200 Speed [mm/s] LES LEY32 (Motor mounting position: Top/Parallel) LEY32D (Motor mounting position: In-line) LEPY LEPS 80 80 Lead 4: LEY32DC Lead 5: LEY32C LER Lead 8: LEY32DB 60 60 Lead 10: LEY32B Work load [kg] Work load [kg] Lead 16: LEY32DA LEH Area where the regeneration option is required.
LEL 20 LEM 0 LEY LEY 0 200 400 600 800 1000 1400 1200 Speed [mm/s] LES LEY32 (Motor mounting position: Top/Parallel) LEY32D (Motor mounting position: In-line) LEPY LEPS 80 80 Lead 4: LEY32DC Lead 5: LEY32C LER Lead 8: LEY32DB 60 60 Lead 10: LEY32B Work load [kg] Work load [kg] Lead 16: LEY32DA LEH Area where the regeneration option is required.
SUP=0.3MPa 80 SUP=0.2MPa 60 Note 2) 1 cycle discharge rate PA3000: Approx. 22ml PA5000: Approx. 100ml Selection procedure 1. First mark the intersection point for a discharge rate of 4l/min and a lifting range of 15m. 2. Find the pilot air pressure for the marked point.
Lead 5: LEY32C 40 60 Lead 10: LEY32B Regenerative resistor area Work load [kg] Work load [kg] 30 Lead 10: LEY32B 40 Lead 20: LEY32A 20 Lead 20: LEY32A 20 10 0 0 0 200 400 600 800 1000 1200 1400 0 200 400 600 800 1000 1200 1400 Speed [mm/s] Speed [mm/s] LEY32DV7 (Motor mounting position: In-line) Vertical Horizontal 60 80 Lead 4: LEY32DC Lead 4: LEY32DC 50 Regenerative resistor area 60 Lead
SpeedVertical Work Load Graph LEY25l (Motor mounting position: Top/Parallel, In-line) 40 Lead 3: LEY25C 30 Work load [kg] 20 Lead 6: LEY25B 16 Lead 12: LEY25A 10 8 0 0 200 600 1000 1400 Speed [mm/s] LEY32l (Motor mounting position: Top/Parallel) LEY32D (Motor mounting position: In-line) 50 60 Lead 4: LEY32DC 50 Lead 5: LEY32C 40 46 37 40 Work load [kg] Work load [kg] 30 30 Lead 8: LEY32DB
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: C (Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm), Stroke: 100mm, Motor Option: None, Rod End Thread: M (Male), Mounting: L (Foot)
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm, Stroke: 100mm, Motor Option: None, Rod End Thread: Male, Mounting: Foot, Actuator Cable: -, Actuator Cable Length: -, Controller Type - LEC, JXC: -, I/O Cable Length for LEC: -, Controller Mounting: -, Communication Plug Connector or I/O Cable Length for JXC
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: C (Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm), Stroke: 100mm, Motor Option: None, Rod End Thread: M (Male), Mounting: L (Foot), Actuator Cable: R (Robotic Flexible Cable), Actuator Cable Length: 5 (5m), Controller Type - LEC, JXC: 6P (LECA6, PNP, Step Data Input Type)
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm, Stroke: 100mm, Motor Option: None, Rod End Thread: Male, Mounting: Foot, Actuator Cable: Robotic Flexible Cable, Actuator Cable Length: 5m, Controller Type - LEC, JXC: LECA6, PNP, Step Data Input Type, I/O Cable Length for LEC: -, Controller Mounting: -, Communication
The pump internal capacity is about 100mL. 4) Pilot air Confirm the supplied pilot air is within specified range from 0.2 to 0.5MPa.
SUP=0.3MPa 80 SUP=0.2MPa 60 Note 2) 1 cycle discharge rate PA3000: Approx. 22ml PA5000: Approx. 100ml Selection procedure 1. First mark the intersection point for a discharge rate of 4l/min and a lifting range of 15m. 2. Find the pilot air pressure for the marked point.
SUP=0.3MPa 80 SUP=0.2MPa 60 Note 2) 1 cycle discharge rate PA3000: Approx. 22ml PA5000: Approx. 100ml Selection procedure 1. First mark the intersection point for a discharge rate of 4l/min and a lifting range of 15m. 2. Find the pilot air pressure for the marked point.
Flow rate of supplied DI water: 100ml/min Data provided in this section is just one example of the actually measured values. Application examples illustrated in this flyer do not guarantee the result of applicable use of this product. Construction Tubing Integral fittings e y t e t i r y !6 r u i u q o q !0 o !1 !0 w !1 !2 w !2 Parts list !3 No.
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: C (Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm), Stroke: 200mm, Motor Option: B (w/Lock), Rod End Thread: Female, Mounting: Both Ends Tapped (Standard), Actuator Cable: R (Robotic Flexible Cable), Actuator Cable Length: 3 (3m), Controller Type - LEC, JXC: 1N (LECP1, NPN, Programless Type), I/O Cable Length
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: C (Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm), Stroke: 400mm, Motor Option: None, Rod End Thread: M (Male), Mounting: Both Ends Tapped (Standard), Actuator Cable: R (Robotic Flexible Cable), Actuator Cable Length: 3 (3m), Controller Type - LEC, JXC: 1N (LECP1, NPN, Programless Type), I/O Cable Length
Size: 32, Motor Mounting Position: Top, Motor: Step Motor (Servo 24 VDC), Lead Screw: C (Size 16: 2.5mm, Size 25: 3mm, Size 32/40: 4mm), Stroke: 200mm, Motor Option: C (w/Motor Cover), Rod End Thread: Female, Mounting: Both Ends Tapped (Standard), Actuator Cable: R (Robotic Flexible Cable), Actuator Cable Length: 3 (3m), Controller Type - LEC, JXC: 1N (LECP1, NPN, Programless Type), I/O Cable