SMC Corporation of America
Elite Part Number Search
Search Results "CDJ2L6-15RZ-M9NWL-B"

Cylinder (Tube) Inner Diameter(φ): 6, Stroke(mm): 15, Cylinder Operation Method: [Double Acting] Double Acting, Rod Operation Method: Single Rods, Main Body Shape: Standard, Additional Function: Standard, Environment, Applications: Standard, Operating Temperature(°C): -10~70, End Locking: No, Valves: No, Operating Pressure(MPa): 0.12~0.7, Cushion: Rubber cushion, Auto Switches: None, Lead

Cylinder (Tube) Inner Diameter(φ): 6, Stroke(mm): 15, Cylinder Operation Method: [Double Acting] Double Acting, Rod Operation Method: Single Rods, Main Body Shape: Standard, Additional Function: Standard, Environment, Applications: Standard, Operating Temperature(°C): -10~70, End Locking: No, Valves: No, Operating Pressure(MPa): 0.12~0.7, Cushion: Rubber cushion, Auto Switches: None, Lead

This is a legacy product, and replaced by10-CDJ2B6-15RZ-B, CYL, DBL ACT, CLEAN ROOM, ACTUATOR, CJ2 ROUND BODY CYLINDER, C5, 6MM CJ2 CLEAN-ROOM, .03740 lb

This is a legacy product, and replaced byCDJ2B10-15RZ-B, CYL, ROUND BODY, DBL ACT, A-SW, ACTUATOR, CJ2 ROUND BODY CYLINDER, EE, 10MM CJ2 DBL-ACT AUTO-SW, .07907 lb

Magnet: Built-in, Mounting: Single Foot, Bore: 6mm, Stroke: 15mm, Head Cover: Axial, Pivot Bracket: None, Rod End Bracket: None, Auto Switch: M9P--Solid State, Gen. Purpose, 3 Wire PNP, Horizontal, Lead Wire or Prewired Connector: 0.5m Cord Length, M8-3 Pin Connector, Number: 2 pcs. (Or None in the Case of No Switch), Auto Switch Mounting: Band Mounting, Cushion: Rubber Bumper, Series: J2

Magnet: Built-in, Mounting: Single Foot, Bore: 6mm, Stroke: 15mm, Head Cover: Axial, Pivot Bracket: None, Rod End Bracket: None, Auto Switch: M9BW--Solid State, 2-color Indication, 2 Wire, Horizontal, Lead Wire or Prewired Connector: 1m, Number: 1 pc., Auto Switch Mounting: Band Mounting, Cushion: Rubber Bumper, Series: J2

Magnet: Built-in, Mounting: Single Foot, Bore: 6mm, Stroke: 15mm, Head Cover: Axial, Pivot Bracket: None, Rod End Bracket: None, Auto Switch: M9N--Solid State, Gen. Purpose, 3 Wire NPN, Horizontal, Lead Wire or Prewired Connector: 3m, Number: 2 pcs. (Or None in the Case of No Switch), Auto Switch Mounting: Band Mounting, Cushion: Rubber Bumper, Series: J2

Cylinder (Tube) Inner Diameter(φ): 6, Stroke(mm): 15, Cylinder Operation Method: [Double Acting] Double Acting, Rod Operation Method: Single Rods, Main Body Shape: Standard, Additional Function: Standard, Environment, Applications: Standard, Operating Temperature(°C): -10~70, End Locking: No, Valves: No, Operating Pressure(MPa): 0.12~0.7, Cushion: Rubber cushion, Auto Switches: M9B, Lead

Magnet: D (Built-in), Series: J2, Mounting: L (Single Foot), Bore Size: 6mm, Stroke: 15mm, Cushion: Rubber Bumper, Head Cover Port Location: R (Axial), Pivot Bracket: None, Rod End Bracket: None, Auto Switch: M9BW--Solid State, 2-color Indication, 2 Wire, Horizontal, Lead Wire or Prewired Connector: M (1m), Number: S (1 pc.), Auto Switch Mounting Type: B (Band Mounting)

Cylinder (Tube) Inner Diameter(φ): 6, Stroke(mm): 15, Cylinder Operation Method: [Double Acting] Double Acting, Rod Operation Method: Single Rods, Main Body Shape: Standard, Additional Function: Standard, Environment, Applications: Standard, Operating Temperature(°C): -10~70, End Locking: No, Valves: No, Operating Pressure(MPa): 0.12~0.7, Cushion: Rubber cushion, Auto Switches: M9B, Lead

Manifold overall length Manifold overall length Approx. 29% reduced SY5000 manifold SY5000 3 stations SY3000 manifold SY3000 4 stations Mixed manifold SY5000 3 stations SY3000 4 stations For serial transmission EX260 A B A B A B A B A B A B A B A B A B A 14 A B A 14 A B A 14 A B A 14 A B A 14 A B A 14 Installation space A A A A A A A A B B B B B B B B 12 B 12 B 12 B 12 B 12 B 12 B 136.7 mm

A B B B A B A B A B A B A 20 25 32 40 6.5 5.5 10.5 9.5 1 0 6 4 3 0.5 0 6 5 2.5 1.5 7 6.5 5.5 10.5 9.5 1 0 6 4 3 0.5 0 6 5 2.5 1.5 7 7.5 6.5 11.5 10.5 2 1 7 5 4 1.5 0.5 7 6 3.5 2.5 8 13.5 11.5 17.5 15.5 7 6 12 10 9 6.5 5.5 12 11 8.5 7.5 13 Note) Adjust the auto switch after confirming the operating conditions in the actual setting.