d e. 6. f. g. ( ) h. i. 7. j. k. l. 2. 8. ,,, 9. 1. 10. 2. 11. 3. 1. 1. 0.11.0MPa 0.30.5MPa :060 2. 3 2. 1. 3. 5 2. 35% 1. ( 6 ) ()70% ()35% 2. 50% ( 6 ) 15% 3. 1. 4. () 0.5 3. 5. F.G. 4. 1. 1. 2. 2. 3. 1. 1. 2. 2 3. 2. 1.52 4. 5. 1. 1ISO VG32 1. 2. 1. 2. 3. 1. 2. 1. 2. 14.5mT CE2 3. 15,000 18cm 4. 3. 4. IP65 5.
Table 1 Moment of inertia Size Allowable kinetic energy (J) 10 0.00015 15 0.00025 20 0.0004 30 0.015 40 0.03 How to calculate the load energy E : Kinetic energy (J) I : Moment of inertia (kg m Speed (rad/s) : Rotation angle (rad) 1803.14 rad t : Rotation time (s) 1 E = I 2 2 2 = t Table 2 Safety operable rotation time adjustment range Size Rotation time ( s / 90) 10 0.03 to 0.5 15
Cross-recessed and flat head machine screw Tightening torque M(D)HR3-10 0.2Nm M(D)HR3-15 0.3Nm Anaerobic adhesive Cover Cover Guide holder B (Cover thickness) C (screw depth) A (Screw size) D (Counterbore) E (P.C.D.)
250 300 350 400 450 500 600 700 800 900 1000 Product weight[kg] 3.6 3.8 4.0 4.2 4.5 4.7 4.9 5.1 5.3 5.5 5.9 6.3 6.7 7.1 7.5 0.53 Additional weight with lock[kg] LEKFS40 Series Stroke[mm] 150 200 250 300 350 400 450 500 600 700 800 900 1000 1100 1200 Product weight[kg] 5.5 5.8 6.1 6.4 6.7 7.0 7.3 7.6 8.2 8.8 9.4 10.0 10.6 11.2 11.8 0.53 Additional weight with lock[kg] 4 - 2How to order L E
Note 5) When Nil is selected, the product will not come with a built-in magnet for an auto switch, and so a mounting bracket cannot be L E F S H 25 G B 200 C N K R1 CDH7T Motor type Lead[mm] Size Accuracy Motor mounting position Nil Basic type 16 25 32 40 Symbol LEFS16 LEFS25 LEFS32 LEFS40 Nil In-line High performance H High-precision type R Right side parallel G battery-less absolute H 20
Locations where corrosive gas, flammable gas, seawater, water and steam are present. e. Locations where strong magnetic or electric fields are generated. f. Locations where direct vibration or impact is applied to the product. g. Areas that are dusty, or are exposed to splashes of water and oil drops. h. Areas exposed to direct sunlight (ultraviolet ray). i.
(LEC) CC-Link (LEC) (LEC) 30ms (LEC)30ms CC-Link IO (LEC) 30ms (LEC) 1) 4 () 4 X 30ms120ms [IO ] 2) 12 () 12 X 30ms360ms [IO ] 3) 12 ( 6 ) () 12 X 30ms6 X 30ms540ms [IO ] CC-Link (LEC)PLC 46 - 14./ () (50mm ) ( ) 5m 5m 10%(15m 20%) 47 - 15./ 15.1 (LE ) ,, () EMG() 1000 1 48 - /(Best Pneumatics No) UL UL1310 Class2 15.2 () () 49 - 15.3 90 100 (DC24V)SVON () a) b) c) d) e)
Check the product for the following points before operation. a) Damage to electric driving line and signal lines b) Looseness of the connector to each power line and signal line c) Looseness of the actuator/cylinder and controller/driver mounting d) Abnormal operation e) Emergency stop of the total system 3.
Check the product for the following points before operation. a) Damage to electric driving line and signal lines b) Looseness of the connector to each power line and signal line c) Looseness of the actuator/cylinder and controller/driver mounting d) Abnormal operation e) Emergency stop of the total system 3.
D G F C P J M N H K O L mm A B C D E F G H J K L M N O P IDFA60 R1 307 745 605 161 405 681 94 71 46 12.5 330 704 355 126 IDFA70 R1-1/2 342 890 825 176 480 905 68 365 849 390 81 20 IDFA80 R2 438 957 863 169 480 958 219 78 100 11.0 463 916 485 170 IDFA90 13 IDFA80 IDFA90 mm IDFA60 745 957 () () 704 916 () () 355 330 485 463 IDFA70 890 () 849 () 390 365 IDFA60/70/80/90 Series 7-3 IDX-OM-W094
Amount of grease units: g Stroke 40 50 63 80 100 P o s i t i o n f o r Bore g r e a s e At 100st 3 to 4 3 to 5 4 to 5 6 to 8 8 to 10 50st added 1 1 1.5 2 3 16 3-2-4. Mounting of seals 1) Rod seal, Cushion seal (Fig 6, ) Pay attention to the mounting direction of the seal. Apply grease all over the seal and inner surface of the bushing as shown in Fig. 7.
To maintain good air condition, refer to "Air Preparation Equipment Model Selection Guide" in Best Pneumatics No. 5 and select the C or higher (D, E, F, G or H) level. (5) When a lubricator is used on the supply (upstream) side of the product, it can clog the fixed orifice, which may lead to operation failure. Never use a lubricator on the supply (upstream) side of the product.
To maintain good air condition, refer to "Air Preparation Equipment Model Selection Guide" in Best Pneumatics No. 5 and select the C or higher (D, E, F, G or H) level. (5) When a lubricator is used on the supply (upstream) side of the product, it can clog the fixed orifice, which may lead to operation failure. Never use a lubricator on the supply (upstream) side of the product.
Nozzle diaphragm assembly Aluminum, Weather resistant NBR Seal HNBR Seal NBR Diaphragm spacer Polyacetal Supply diaphragm Weather resistant NBR Exhaust diaphragm assembly Aluminum, Weather resistant NBR Valve assembly Aluminum, stainless steel, HNBR Body Aluminum die-cast Grease: lithium grease -7- How to order IR 2 0 01 1 0 BG A Option/Semi-standard:Select one each for a to e.
IDU Series 6-2 Refrigerant with GWP reference 6 2 IDX-OM-W028 Air Dryer 6 References 6-3 External Dimentions IDU22E75E PORT SIZE AIR OUTLET PORT SIZE AIR INLET A (G) B (D) E SWITCH EVAPORATION WITH LAMP THERMOMETER VENTILATION VENTILATION DRAFT AIR OUTLET BALL VALVE (F) AUTO DRAIN C DRAIN TUBE TERMINAL LENGTH:1m) (O.D.10, BLOCK J P K L2 N1 M 13 4x POWER SUPPLY ENTRY 911)[OPPOSITON] (WIRE
IDU Series 6-2 Refrigerant with GWP reference 6 3 IDX-OM-W013 Air Dryer 6 References 6-3 Dimentions IDU3E / IDU4E / IDU6E Evaporation Illuminated thermometer switch Q3 B3 E D A3 P Compressed air inlet Port size Compressed air inlet Port size F G Inspection Grille [200V AC Inspection Grille specification] Terminal block C3 Ventilation direction Ventilation direction Ventilation air outlet
ZB-OM00201-B Manifold Specifications With supply valve/ release valve, Without pressure sensor/ vacuum pressure switch Ejector PV=PD ZZBZB31-K1Station D side U side Atmospheric vent port Atmospheric vent port Supply valve Supply valve Release valve Release valve With supply valve/ release valve, with vacuum pressure switch Ejector PVPD ZZB-SM5 ZB31-Q1L(O) D side U side Station E F Vacuum
Grounded socket Earth leakage breaker E L N Earth PE Fig. 4.2-1 Power supply 4.2.2 Setting of circulating fluid temperature Press the [] and [] buttons on the operational panel to change the SV to required value.
Hardening or deterioration of the tubing that is connected e. Air leakage 8 Doc. no.IZ*-OMX0012-B 1. How to Order 1-1. Ionizer IZG10 08 01 01 Ionizer Gun One-touch fitting Nozzle type Symbol Applicable tube O.D.
Nil Polycarbonate bowl 2 Metal bowl 6 Nylon bowl Bowl 8 Metal bowl with level gauge C With bowl guard 6C With bowl guard (Nylon bowl) Semi-standard Nil Without indicator Indicator L With element service indicator Note3) Nil With drain cock Drain guide 1/8 Drain port J e Drain guide 1/4 W Drain cock with barb fitting Nil Flow direction: Left to right Flow direction f R Flow direction: Right