SMC Corporation of America
Elite Part Number Search
Search Results "CDQ2LC63TN-25DZ-E-M9P"

CRA1 CRJ U 05 90 E M9B S With external stopper CRQ2 Number of auto switches MSQ Nil S 2 pcs. 1 pc.

RS M W V T2 Applicable mounting bracket Bore size (mm) Weight (g) Joint 2D through 2O counter bore T1 B E J Type A mounting bracket Type B mounting bracket 32, 40 YU-03 YA-03 YB-03 25 50, 63 YU-05 YA-05 YB-05 40 Material: Precision die-casting material equivalent to stainless steel 304 80 YU-08 YA-08 YB-08 90 100 YU-10 YA-10 YB-10 160 Bore size (mm) O M J E D B Part no.

, depth OL WA Z XAH9 XB Section XX Section XX XA XL XC HA: T-slot for hexagon bolt Section XX details X 0.02 R T X 0.02 DB DA H VA VB U X PW b a e d c T-slot dimensions 2 x P XAH9 depth XL 2 x P (Plug) XAH9 depth XL S Q G J K PB GB GA [mm] FA PA + Stroke Bore size [mm] a b c d e FB A + Stroke B + Stroke C + Stroke 32 6.5 10.2 5.5 3.5 9.5 40 6.5 10.5 5.5 4 10 50 8.5 12.5 7.5 4 12.5 E The

Type A mounting bracket part numberYA-03 JointYU-03 2 x O depth of counterbore Material: Stainless steel (mm) Bore size (mm) B D E J M O Part no.

Open F 4 x M5 x 0.8 through (Thread for mounting attachment) (mm) J 98 152 192 A B C D E F G H 40 70 90 Model MHL2-16D MHL2-16D1 MHL2-16D2 45 75 95 60 90 110 28 58 78 68 110 130 98 170 210 128 200 240 26 50 70 Note 1) J dimension is at fully closed.

1 u t q w e y !2 i r #3 !4 !0 !9 !8 !5 !

Material: Chrome molybdenum steel (Nickel plated) mm Bore size (mm) YA 03 B D E F M T1 T2 Part no.

Z A + Stroke B + Stroke L W E M K J 2 x P (Rc, NPT, G) (Port size) 100 Auto switch Minimum lead wire bending radius 10 H thread effective depth C 4 x N through F Q I E M Z A + Stroke B + Stroke L W G M K J Standard [mm] Bore size Stroke range Without magnet for auto switch With magnet for auto switch C D E F G H I J K L M N P Q W Z A B A B 50 10 to 50 37 29 42.5 34.5 15 18 57 9 M10 x 1.5

Determination of load's kinetic energy (E) bore size E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 8-16-8.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 8-16-8.)

Determination of load's kinetic energy (E) bore size E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 8-16-8.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 8-16-8.)

L 3 m Connector Nil w/ connector Stroke(mm) Made To Order Fluoro rubber packing (Ex.) 2-2-2 Applicable Auto-Switch Models Z w/o connector 25, 50, 75, 100 Mark Auto-Switch Model Mark Auto-Switch Model Mark Auto-Switch Model A90 D-A90 M9N D-M9N M9NW D-M9NW A93 D-A93 M9P D-M9P M9PW 2-color D-M9PW A96 Reed D-A96 M9B Solid State D-M9B M9BW Indication Solid State D-M9BW A90V Auto-Switch D-A90V

9 #4 #5 #1 MY CY @7 @8 t @9 @4 @4 @4 MG Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com CX DMetal stopper Shock absorber e !8 A -X i !1 !0 @6 o @0 20Data !3 !4 !5 !6 !2 @2 @1 Detail drawing of part A Component Parts Note Note Material Material No.

Operating model: MHY2-16D Opening time: 0.15 s a = 40 (mm) b = 7 (mm) c = 8 (mm) d = 5 (mm) e = 10 (mm) f = 12 (mm) A part a b c B part e f d 2.

9@0 MHY2-D MHY2-D2 MHY-A1001 MHY-A1601 MHY-A2001 MHY-A2501 Finger assembly ro MHY-A1001-2 MHY-A1601-2 MHY-A2001-2 MHY-A2501-2 <10, 16> e!2 Joint assembly MHY-A1002 MHY-A1602 MHY-A2002 MHY-A2502 <20, 25> e!2!

Additionally, do not mount the foot bracket with the pressure applied to the port. y 0 A port B port a 1 w y y a e k w of y e e k g n of ra n e io at g ot R n R +4 0 ra ot n io 0 at at ot 8 R io 1 R +4 0 n y ot ra a w n y 0 g at e e k of 9 io 1 n ay ra w n g ey e of k 189

BMA3-050S (A set of a, b, c, e) BMA3-063S (A set of a, b, c, e) Auto switch Switch bracket (Resin) Transparent (Nylon)Note 1) d e White (PBT) c Switch holder b Auto switch mounting screw a * Band (a) is mounted so that the projected part is on the internal side (contact side with the tube).

Determination of load's kinetic energy (E) E > Es E Es Determination of bore size Review of larger bore size E = m E 2 a ( ) 2 = (Refer to page 1548.) 1000 P Ps P > Ps Determination of pressure for intermediate stop (p) (Refer to page 1548.)

Wn Mass mn X-axis xn xa xb xc xd Y-axis yn ya yb yc yd Z-axis zn za zb zc zd X 1 mt = x (mn x xn)w Wa Wb Wc Wd ma mb mc md Y 1 mt = x (mn x yn)e D1 mt = x {mn x (A + zn)} r Z -X (n = a,b,c,d) Refer to the following sections 1 to 4 to calculate the center of gravity and the total load.

The tightening torque of the M3 screw must be 0.35 to 0.45 Nm. t The detection position can be changed under the conditions in step e. Auto switch y Confirm where the mounting position is, and tighten the auto switch fixing screw (M2.5) to fix the auto switch mounting nut. The tightening torque of the M2.5 screw must be 0.25 to 0.35 Nm.