B side parallelism to A side 65 65 25 15 15 Mass (g) Refer to Graph (1). MXQ B side traveling parallelism to A side Note) The shock absorber service life is different from that of the MXQ cylinder depending on operating conditions.
phase J B C D A t A COM COM COM B 12 VDC GND F.G.
): Dimension of the D-A96 D-A9V D-M9V D-M9WV D-M9AV Auto switch Auto switch Hs Hs A B A B 21.5 (23.5) 23.5 14.5 14.5 12.5 12.5 ( ): Dimension of the D-M9AV D-A7/A80 D-A73C/A80C D-A79W D-F7/J79 D-F7W/J79W D-F79F/F7BA Auto switch Auto switch Hs Hs Hs Hs A B A B D-A7H/A80H D-F7V/F7WV D-F7BAV D-J79C Auto switch Auto switch B A A B 10 Auto Switch Mounting Series CJ2Y Auto Switch Proper Mounting
B side traveling parallelism to A side Refer to Graph (1).
Hs A B A B 32 to 100 D-A73C D-A80C D-J79C D-A79W D-F7V D-F7WV D-F7BAVL Approx.
Retraction stroke end E E1 H H G B F (C) A E E1 H H G B MXQR-BT8 MXQR-JT8 A F Stroke adjustment range (mm) A B C F G H J K 1) E E1 Applicable size Model MXQR 6 M2.5 x 9 M6 x 0.75 1 4 8 6 28.5 8.5 19 18 12 MXQR-BT6 1.4 MXQR-BT8 MXQR 8 M3 x 11 M8 x 1 5 12 40.8 8 10 24.5 24 20 7 MXQR-JT8 1.4 6 MXQR-BT12 MXQR12 M4 x 14 M8 x 1 12 40.8 10 14 29 28 18 7 5 MXQR-JT12 1.4 7 46.7 MXQR-BT16 MXQR16 M5
L r b a = K + mL2 K: The moment of inertia around the center of gravity of the load K = m r2 12 a2 + b2 = m In case of 4. Round plate 2 4. Round plate (Including column) Position of rotational axis: Passing through the center axis 9. Gear transmission (A) (B) No. of teeth = a 1. Find the moment of inertia B for the rotation of shaft (B). 2.
Next, B is entered to find A the inertial moment for the rotation of shaft (A) as 5 b a A = ( ) 2 B Number of teeth = b Kinetic Energy/Rotation Time Even in cases where the torque required for rotation of the load is small, damage to internal parts may result from the inertial force of the load.
6 6.5 10.5 13.5 16.5 19.5 B 12.5 15.5 18.5 21.5 A 29 29.5 33 24 28.5 29 B 6.5 7 11 14 17 20 A 26 26.5 30 21 25.5 26 B 3.5 4 8 11 14 17 A 19.5 24 24.5 B 9.5 12.5 15.5 A 31.5 22.5 27 27.5 B 9.5 12.5 15.5 18.5 A 35.5 26.5 31 31.5 B 13.5 16.5 19.5 22.5 MK220 MK225 MK232 MK240 MK250 MK263 Auto Switch Mounting Bracket Part No.
A B A B A B A B MY-S16 MY-S25 MY-S32 MY-S40 63.6 091 130 182 Note) A set of side supports consists of a left support and a right support.
11.5 18.5 23 B 12.5 14.5 13.5 19 B 9 11 10 15.5 B 7 9 8 13.5 A 14 12 19 23.5 B 13 15 14 19.5 A 14.5 12.5 19.5 24 B 13.5 15.5 14.5 20 B 7.5 9.5 8.5 14 B 10.5 12.5 11.5 17 B 7 9 8 13.5 20 25 32 40 Note) When setting an auto switch, be sure to check its operation before adjusting.
D-A7lH, A80H D-A73C, A80C D-F7l, J79 D-F7lV, J79C D-A79W D-F9l D-F9lV D-F9lWV D-F9lW D-F9BAL D-P5DW D-A9l D-A9lV D-A7, A8 Model B 6.5 7 6 8.5 11.5 14.5 A 28.5 29 33 24 28.5 28.5 B 7 7.5 6.5 9 12 15 B 4 4.5 3.5 6 9 12 B 11 11.5 10.5 13 16 19 B 4.5 7.5 10.5 B 5 7.5 10.5 13.5 B 9 11.5 14.5 17.5 A 34.5 25.5 30 30 B 8 10.5 13.5 16.5 A 19.5 24 24 A 28 28.5 32.5 23.5 28 28 A 25.5 26 30 21
7 7 8 B 6 6 7 B 3 3 4 0 to 1 A B 20 25 32 D-Z7/Z80 D-Y59/Y69/Y7P/Y7PV D-Y7W/Y7WV D-Y7BAL A 23 23 32 37 Bore size (mm) B 0 0 0 4 40 50 63 80 Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com Minimum Stroke for Mounting Operating Range Bore size (mm) Bore size (mm) Auto
Rotational axis B d D I m kgm I = m kgm 8 8 Gear: I a + b I = m kgm IB = I + I + I kgm 12 Substitute the moment of inertia IB for rotation around shaft B with the moment of inertia IA for rotation around shaft A. Gear: I IA = (A/B)IB [A/B: Gear tooth ratio] Find the actual moment of inertia.
Round plate (Including column) Position of rotational axis: Through the center A axis B Number of teetha 1. Find the moment of inertia I for the rotation of shaft (B). B 2. I is converted to the rotation of the shaft (A). r B 2 r I = m2 2 b a I I = A B Number of teethb 5.
8370: JIS B 8361: JIS B 9960-1: 1 ) JIS B 8433: *2) 1. 2. 3. 1. 2. 3. 4.
If air pressure is applied from the B port side, the shaft rotates counterclockwise.
Inversion Traveling direction of cylinder Rod extending Rod retracting A-phase pulse B-phase pulse Count In rod extending direction, A-phase turns on first, then B-phase turns on with the delay of approximately 90 phase difference. In rod retracting direction, B-phase turns on first, then A-phase turns on with the delay of approximately 90 phase difference.
Proper Auto Switch Mounting Position (Detection at stroke end) C D A B D-A9, D-A9V D-M9, D-M9V, D-M9W, D-M9WV B B Series model A Series model A Operating range Operating range MY2C16 MY2C16 44 116 48 112 MY2H16 MY2H16 46 114 50 110 MY2HT16 MY2HT16 11 8.5 70 90 74 86 MY2C/H/HT25 MY2C/H/HT25 54 156 58 152 MY2C/H/HT40 MY2C/H/HT40 85 245 89 241 Series model C Series model C D D Operating range
Proper Auto Switch Mounting Position (Detection at stroke end) C D Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com A B Series MY2C Series MY2H Series MY2HT (mm) D-M9, D-M9V (mm) D-M9, D-M9V (mm) D-M9, D-M9V A A A B B B Bore size 16 25 40 Operating range Bore size