6 @9 r MTS $0 #6 MY A' CY $1 !1 !2 !0 !8 w $4 t e $2 !5 $3 y!7 @8 !4 !
/2 14-19-31 28 Membrane Air Dryer Unit Type Series IDG Units (Type M, Type V) How to Order 03 IDG 30 M Option Symbol Contents Size 3 5 10 20 30 50 60 75 100 Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com Size Nil Standard 3 (2) (1) (2) (2) (2) P With fitting
Specifications 2. Installation and Handling P4 2-1. Air supply 2-2. Design 2-3. Mounting and Installation 2-4. Environment 2-5. Speed control 2-6. Allowable kinetic energy 2-7. Air cushion 2-8. Control direction 2-9.Mounting brackets 2-10.Auto switches 3. Maintenance P17 3-1. Checks 3-2. Replacement of seals 3-3. Consumable parts 3-4. Troubleshooting 4.
0 i t r !1 y !2 With external stopper/CRJU !3 !8 !4 !5 !8 !7 !
6 $2 #2 !3 #3 !7 !2 @5 @4 r @3 e @6 @1 @2 #1 t y $1 u w q E' Section E-E' CYV32 t !9 $0 @1 @2 y @4 @3 u @6 #9 @5 Description Material Note Parts list Description Material Note No. No.
r q w w Component Parts No.
When using a fitting other than an SMC fitting, follow the instructions given by the fitting manufacturer. 2) For a fitting with sealant R or NPT, first, tighten it by hand, then use a suitable wrench to tighten the hexagonal portion of the body an additional two or three turns. For the tightening torque, refer to the table below. 2. Ensure sufficient space for maintenance activities.
[White] Blue [Black] Black [White] Relay Switch 1 Load Switch 1 Load Switch 1 Relay contact Blue [Black] Blue [Black] Brown [Red] Brown [Red] Brown [Red] Relay Black [White] Black [White] Blue [Black] Black [White] Switch 2 Switch 2 Switch 2 Blue [Black] Blue [Black] The indicator lights will light up when both switches are turned ON. 2 wire with 2 switch AND connection 2 wire with 2 switch
17 14 Connection thread 3 8 1 2 1 4 3 8 1 2 Reference dimensions after R thread installation.
Countermeasure (1) Ensure proper supply pressure and pilot pressure (2) Stop the equipment which is using the air. Locate the source of any air leaks and repair them. (3) Pressurize port 2 (A) and exhaust air from port 3 (R). (It is possible to blow the poppet valve.) (4) Replace the valve. (5) Open the 3 (R) port. (6) Supply air to port 2 (A).
1 15 20 20 D-A5l D-A6l n (Different surfaces) 15 + 55 (n 2) 2 (n = 2, 4, 6, 8) Note 1) 20 + 55 (n 2) 2 (n = 2, 4, 6, 8) Note 1) 20 + 55 (n 2) 2 (n = 2, 4, 6, 8) Note 1) 2 (Different surfaces, same surface) 20 25 25 n (Same surface) 20 + 55 (n 2) 2 (n = 2, 4, 6, 8) Note 1) 25 + 55 (n 2) 2 (n = 2, 4, 6, 8) Note 1) 25 + 55 (n 2) 2 (n = 2, 4, 6, 8) Note 1) D-A59W 1 15 25 25 2 (Different
: KFY H1 (width across flats) H2 (width across flats) Applicable tubing (mm) Effective area (mm 2) Connection thread R Weight (g) L4 A Model L1 L2 L3 M d I.D.
(1 )50mm2 (11)No.2 ON (OUT1ON) (12)INPOFF (13)BUSYON (14)DRIVEOFF (15)INPON (16)BUSYOFF 100mm(1 )50mm2 66 No.SFOD-OMT0009CN-B 8.5 1 X 2 Y (CIR-R)(CIR-L) 2 34 2 (Y ) (X2, Y2) CIRR CIRL (Xc, Yc) 1) 1) (X1,Y1) 1 (X ) 1)0.71.1 X Y Y (Xa,Ya) (Xc, Yc) X (0,0) 67 No.SFOD-OMT0009CN-B 3.6 CIR-R/L CIR-R/L 1-2 ABS 1)2 2) 3)(0,0) 68 No.SFOD-OMT0009CN-B ) 100mm/s 1 30mm 2 10mm
(16)BUSY OFF 100mm(1 ) 50mm(2 ) -66No.JXC-OMT0001CN-C 10.5 1 X 2 Y ()() (CIR-R)(CIR-L) ( ) 34 2 (Y ) (X2, Y2) CIR-R CIR-L (Xc, Yc) 1) 1) (X1,Y1) 1 (X ) 1) 0.7 1.1 X Y Y (Xa,Ya) (Xc,Yc) X (0,0) -67No.JXC-OMT0001CN-C 3.6 CIR-R/L CIR-R/L 1-2 ABS 1)( ) 2) 3)(0,0) -68No.JXC-OMT0001CN-C ) 100mm/s 1 30mm2 10mm(No.1 ) 100mm/s 10mm 240mm( No.2 :1 0mm2 20mm) 100mm/s (No.31 0mm 2
) Note 1) For CIR-R and CIR-L, Axis 1 and 2 are based on interpolation.
2 !1 w #3 !6 @4 @5 @2 @1 r #0 #4 #2 o !5 @8 @3 @6 REBHT32 Component Parts Component Parts No. Description No.
L = Stroke 1 2 , or more than 100 mm 1 7 5 4 6 2 6 5 7 3 L L Fig. 11 Position for application of grease Table 10 Amount of grease units: g Stroke 32 40 50 63 80 100 P o s i t i o n f o r Bore g r e a s e At 100st 3 to 4 3 to 4 3 to 5 4 to 5 6 to 8 8 to 10 50st added 1 1 1 1.5 2 3 26 3-2-4.
Center trunnion: CS2WT W V Z + 1/2 stroke With rod boot Width across flats KA Width across flats KA Port Cushion valve 4 x J 2 x P G M G Z + l + 1/2 stroke (Rc, NPT, G) MM MM R TY D D E E e C B AL f l AL K TDe8 C B h + l A K F H F TT N A N ZZ + l + 2 x strokes (with rod boot on one side) S + Stroke H + Stroke TX TZ ZZ + 2 x strokes ZZ + 2 x l + 2 x strokes (with rod boot on both sides) (mm
2 2 2 2 2 3 3 28 32 38 46 58 70 82 100 5.5 5.5 6.6 6.6 9 11 11 14 6 7 7 8 9 9 11 14 C85 C76 CG1 MB End boss is machined on the flange for E.
Same side 2 -XC35 With coil scraper 150 + 30 (n 2) n = 2, 4, 6, 8 Different sides 35 + 30 (n 2) 55 + 55 (n 2) 110 + 30 (n 2) n = 2, 4, 6, 8 D-A44 n 150 + 50 (n 2) n = 2, 4, 6, 8 Same side 110 + 50 (n 2) n = 2, 4, 6, 8 150 1 15 110 2 (Different sides, Same side), 1 105 110 115 15 D-Z7/Z80 D-Y59/Y7P D-Y7W 15 + 40 n = 2, 4, 6, 8 (n 2) 2 115 + 40 n = 4, 8, 12, 16 (n 4) (n 4) (n 4)