If they are not aligned, the connector cannot be joined properly. (3) When the mark B of the connector has been turned 180 degrees (1/2 turn), wiring is completed. Confirm that the connection is not loose.
If they are not aligned, the connector cannot be connected correctly. (3)When mark B has been turned 180 degrees (1/2 turn), wiring is complete. Confirm that the connection is not loose.
L/A OUT L/A IN 2 Display cover Open to access the setting switches. (3)When mark B has been turned 180 degrees (1/2 turn), wiring is complete. Confirm that the connection is not loose. If turned too far, it will become difficult to remove the connector. Displays the communication status of the BUS OUT side physical layer.
L/A OUT L/A IN Displays the communication status of the BUS OUT side. 2 Display cover The display cover should not be opened. (3)When mark B has been turned 180 degrees (1/2 turn), wiring is complete. Confirm that the connection is not loose. If turned too far, it will become difficult to remove the connector.
If they are not aligned, the connector cannot be joined properly. (3) When the mark B of the connector has been turned 180 degrees (1/2 turn) , wiring is completed. Confirm that the connection is not loose.
If they are not aligned, the connector cannot be joined properly. (3) When the mark B of the connector has been turned 180 degrees (1/2 turn), wiring is completed. Confirm that the connection is not loose.
This product is not designed to be explosion proof. (3)When the mark B of the connector has been turned 180 degrees (1/2 turn), wiring is completed. Confirm that the connection is not loose. If turned too far, it will become hard to remove the connector. (2)Add more units.
Installation Wiring (3)When the mark B of the connector has been turned 180 degrees (1/2 turn), wiring is completed. Confirm that the connection is not loose. If turned too far, it will become hard to remove the connector. (2)Align the mark C on the unit and insert the connector into the unit vertically.
Wiring 3 4 1 2 (3)When the mark B of the connector has been turned 180 degrees (1/2 turn), wiring is completed. Confirm that the connection is not loose. If turned too far, it will become hard to remove the connector. (2)Align the mark C on the unit and insert the connector into the unit vertically. If they are not aligned, the connector cannot be joined properly.
The Pressure switch can be assembled rotated 180 degrees. Normally closed (Default) These safety instructions are intended to prevent hazardous situations and/or equipment damage. These instructions indicate the level of potential hazard with the labels of "Caution", "Warning" or "Danger".
A fire or explosion can result. 4 Set value Set value or 3 4 or 3 180 0 Switch operation (OUT2) Set value is calculated and set. SET U P DOWN DOWN U P DOWN Outline of setting Do not use the product in a place where static electricity is a problem. Otherwise it can cause failure or malfunction of the system.
Flow rate at normal condition 0.927 = Flow rate of standard condition -40No.PF-OMG0010-H Dimensions (in mm) PF2A703H/706H/712H Model A B C D E F G PF2A703H 55 mm 160 mm 40 mm 92 mm 67 mm 55 mm Rc1, NPT1, G1 PF2A706H 65 mm 180 mm 45 mm 104 mm 79 mm 65 mm Rc11/2, NPT11/2, G11/2 PF2A712H 75 mm 220 mm 55 mm 114 mm 89 mm 75 mm Rc2, NPT2, G2 Model H I J PF2A703H 36 mm M5 x 0.8 8 mm PF2A706H 46
This product is not designed to be explosion proof. 180 Input of the Set point 2 Set value (middle digits) Hysteresis Set point 2 Set point 1 IN side OUT side To reset, press the button for 6 seconds or longer while the button is pressed. Then set all data again.
Data type: 8 bit UInteger Value Function definition Description 128 Device Reset Restarts the device 129 Application Reset Reset of the peak/bottom value (flow/temperature) Reset of the accumulated flow value 130 Restore Factory Reset Initialize the set value to the default value. 170 Flow peak bottom Reset Reset of peak / bottom value (flow rate) 180 Temperature peak bottom Reset Reset of
Data type: 8 bit UInteger Value Function definition Description 128 Device Reset Restarts the device 129 Application Reset Reset of the peak/bottom value (flow/temperature) Reset of the accumulated flow value 130 Restore Factory Reset Initialize the set value to the default value. 170 Flow peak bottom Reset Reset of peak / bottom value (flow rate) 180 Temperature peak bottom Reset Reset of
. : The detecting range of the sensor is 180 mm (at the best measurement distance of 50 mm). -10No.SFOD-OML0002-A Function settings Power ON When the is pressed with the power supply off, the power supply will be turned on. All indications are displayed for 1 s. after the power supply is turned on.
Protected earth
.: ZVB-P1A) Hose band (Material: SUS) Exhaust duct hose (Material: PVC) (*) Connection inside diameter Duct collector bag filtration rating 10m (Material: Polyester) Hose band (Material: SUS) -12- 2.5 Offset Voltage and Discharge Time Ionizer 100 180 200 Actual measurement values of the static elimination performance at the points 1 to 6 are shown below.
In general, 80 to 100 mesh (150 to 180 m) filters are recommended. When transferring a coagulable liquid, take measures to prevent it from coagulating in the pump. Please contact SMC sales office for the use of slurry. Take countermeasures to prevent the operating fluid from getting onto the body of the process pump. 3.
In general, 80 to 100 mesh (150 to 180 m) filters are recommended. When transferring a coagulable liquid, take measures to prevent it from coagulating in the pump. Please contact SMC sales office for the use of slurry. Take countermeasures to prevent the operating fluid from getting onto the body of the process pump. 3.