SMC Corporation of America
Elite Part Number Search
Search Results "REBR25-250-Y59B"

Bore Size: 32mm, Port Thread: Rc (25-100 Bore, M Thread 16-20 Bore), Piping: Standard, Stroke: 600mm, Stroke Adjusting Unit: Low Load Shock Absorber+Adjust Bolt, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: 3m, Number: 3 pcs., Made to Order: -

Bore Size: 32mm, Port Thread: Rc (25-100 Bore, M Thread 16-20 Bore), Piping: Centralized Piping, Stroke: 1600mm, Stroke Adjusting Unit: Low Load Shock Absorber+Adjust Bolt, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: 5m, Number: -, Made to Order: -

Bore Size: 25mm, Port Thread: Rc (25-100 Bore, M Thread 16-20 Bore), Piping: Centralized Piping, Stroke: 700mm, Stroke Adjusting Unit: Low Load Shock Absorber+Adjust Bolt, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: 3m, Number: -, Made to Order: -

Bore Size: 32mm, Port Thread: Rc (25-100 Bore, M Thread 16-20 Bore), Piping: Standard, Stroke: 1600mm, Stroke Adjusting Unit: Low Load Shock Absorber+Adjust Bolt, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: 5m, Number: 1 pc., Made to Order: -

Bore Size: 40mm, Port Thread: Rc (25-100 Bore, M Thread 16-20 Bore), Piping: Centralized Piping, Stroke: 500mm, Stroke Adjusting Unit: High Load Shock Absorber+Adjustment Bolt, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: 3m, Number: -, Made to Order: -

Magnet: D (Built-in), Mounting: C (Rear Clevis), Overall Length: Z (Super Compact), Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2")

Magnet: D (Built-in), Mounting: E (Front screw clearance hole), Overall Length: Standard, Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2")

Magnet: D (Built-in), Mounting: M (Rear screw clearance hole), Overall Length: Standard, Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2")

Magnet: D (Built-in), Mounting: N (Through screw clearance hole), Overall Length: Standard, Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2")

Magnet: D (Built-in), Mounting: B (Through Hole), Overall Length: Z (Super Compact), Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2")

Magnet: D (Built-in), Mounting: B (Through-hole), Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2"), Body Option: C (Rubber Bumper)

Series: 250 [3 Port COM (Single Unit)], Voltage: 5 (24VDC), Electrical Entry: W (Grommet / Molded), Orifice: 1 [250 (3 Port) ø1], Port Size: M5 Thread

Series: 250 [3 Port COM (Single Unit)], Voltage: 6 (12VDC), Electrical Entry: W (Grommet / Molded), Orifice: 1 [250 (3 Port) ø1], Port Size: M5 Thread

Magnet: None, Mounting: B (Through Hole), Overall Length: Standard, Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2"), Body Option: C (Rubber Bumper)

Magnet: D (Built-in), Mounting: A (Both Ends Tapped), Overall Length: Z (Super Compact), Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2")

Magnet: None, Mounting: N (Through screw clearance hole), Bore Size: 250 (2 1/2"), Stroke: 250 (2 1/2"), Body Option: M (Male Rod End)

Type: Instrumentation Auxiliary Device, Thread Type: Rc, Connection Port Size: 1/4 (Pressure gauge 1/8), Stroke range(mm): 226 to 250, Stroke(mm): 250

Magnet: D (Built-in), Mounting: G (Rear Flange), Tube Material: Aluminum Tube ø125~ø160, Steel Tube ø180~ø300, Bore Size: 125mm, Port Thread: Rc, Stroke: 100mm, Option: w/o Rod Boot, Cushion: Both Sides, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: L (3m)

Magnet: D (Built-in), Mounting: G (Rear Flange), Tube Material: Aluminum Tube ø125~ø160, Steel Tube ø180~ø300, Bore Size: 125mm, Port Thread: Rc, Stroke: 800mm, Option: w/o Rod Boot, Cushion: Both Sides, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: L (3m)

Magnet: D (Built-in), Series: A2K (Non-rotating), Mounting: F (Front Flange), Bore Size: Ø63, Port Thread: TN (NPT), Stroke: 300mm, Rod Boot: w/o Gaiter w/Cushion Both Sides, Cushion: Air Cushion, Auto Switch: Y59B--Solid State, Gen. Purpose, 2 Wire, Horizontal, Lead Wire or Prewired Connector: L (3m)