165 65 85 95 165 Auto switch unit + 2 switches Foot bracket assembly 384 785 993 1722 384 785 993 1722 Caution Be sure to read before handling.
V No 200 V or less 2-wire 24 V PLC Terminal conduit 12 V Relay, PLC Yes 100 V, 200 V DIN terminal Grommet Diagnostic indication (2-color indication) Solid state auto switches marked with are produced upon receipt of order.
Model XL-25-2 XL-40-2 XL-50-2 XL-63-2 XL-80-2 Rated voltage for heater 90 to 240 VAC Heater assembly quantity 1 1 1 1 H4 100C 100 V 200/40 200/50 400/100 600/150 Heater assembly quantity used Heater power W (Nominal value) Inrush/Power consumption (Option symbol, Operating voltage) 200 V 800/40 800/50 1600/100 2400/150 Heater assembly quantity 1 1 1 1 2 H5 120C 100 V 200/40 400/70 400/
100 105 110 115 120 125 150 175 200 225 250 85 90 95 100 105 110 115 120 125 130 155 180 205 230 255 100 105 110 115 120 125 130 135 140 145 170 195 220 245 270 120 125 130 135 140 145 150 155 160 165 190 215 240 265 290 55 60 65 70 75 80 85 90 95 100 125 150 55 60 65 70 75 80 85 90 95 100 125 150 65 70 75 80 85 90 95 100 105 110 135 160 185 210 75 80 85 90 95 100 105 110 115 120 145 170
D-B59W Same side 75 115 115 115 130 140 150 1 pc. 15 Different sides 35 80 80 95 2 pcs.
(mm) Z S NB NA GA Bore 16 to 30 31 to 45 46 to 60 61 to 75 76 to 100 101 to 125 126 to 150 16 to 30 31 to 45 46 to 60 61 to 75 76 to 100 101 to 125 126 to 150 5 to 1 5 5 to 1 5 10 16 5.5 20.5 16 64 76 88 84 96 108 76.5 56.5 5.5 20.5 16 65 77 89 95 119 137 149 85 97 109 115 139 157 169 76.5 56.5 1.3-72 World Wide QS\E Support...
P When mounted on the manifold, the common exhaust discharges the pilot and main valve exhaust through a common exhaust port to enable simple exhausting. 700 B 600 Max.operating speed (mm/s) Piping length1m JIS Symbol B A 500 Piping length5m A D SY (Single) 400 R P SYJ C 300 SX How to order valve with built-in speed controller SYJ5l 5l--lll l--l 200 VK Port size VZ 100 Config.
Example 2: For obtaining the discharge response time until the internal pressure in the 5 L tank is discharged to 95% (T2) of the final vacuum pressure through the use of a valve with a conductance of 3.6 dm3/(sbar).
D: Push-turn locking slotted type E: Push-turn locking lever type (With gasket and screws) Body option Nil: Individual pilot exhaust style Electrical entry Grommet L plug connector 24, 12, 6, 5, 3 VDC/100, 110, 200, 220 VAC 24, 12 VDC/ 100, 110, 200, 220 VAC 24, 12, 6, 5, 3 VDC M plug connector DIN terminal M8 connector R port P, E port M: Common exhaust for the pilot and main valve MN: Without
JIS symbol Double acting Minimum Strokes for Auto Switch Mounting Stroke Long stroke (2) (mm) Max stroke (mm) Number of switches Bore size (mm) Standard stroke (1) (mm) Auto switch model 2 1 D-C7/C8 D-B5/B6 D-H7 D-G5/K5 25, 50, 75, 100, 125, 150, 200 201 to 350 20 15mm 10mm 301 to 400 25 301 to 450 32 25, 50, 75, 100, 125, 150, 200, 250, 300 20mm 15mm 1500 301 to 800 40 D-B59W 301 to 1200
With a cylinder etficiency of 95%, 95 48.8% = 46.2 o/o of the torce is lett for the acceleration of the load. This is 185,7 N. The acceleration is therefore: 185.7 kg . m . s-2 / 1OO kg = 1.857 m' s-2. Without control, the piston would thoretically approach 2 m/s after one second.
With a cylinder etficiency of 95%, 95 48.8% = 46.2 o/o of the torce is lett for the acceleration of the load. This is 185,7 N. The acceleration is therefore: 185.7 kg . m . s-2 / 1OO kg = 1.857 m' s-2. Without control, the piston would thoretically approach 2 m/s after one second.
When determining particle generation grades, the 95% upper confidence limit of the average particle concentration (average value), when each specimen is operated at a specified number of cycles Note 2) is considered. The plots in the graphs indicate the 95% upper confidence limit of the average particle concentration of particles with a diameter within the horizontal axis range.
Less than 5% 8 Error status 5%-10% 9 Loop current 10%-30% 10 Travel distance 30%-50% 11 Rod friction count 50%-70% 12 Movement area 70%-90% 13 Cal select status 90%-95% 14 Cal Type more than 95% total *1-3-5-5 "Setting monitor" is only reading 6 5.
Example 2: For obtaining the discharge response time until the internal pressure in the 5 L tank is discharged to 95% (T2) of the final vacuum pressure through the use of a valve with a conductance of 3.6 [dm3/(sbar)].
85 90 95 55 60 65 70 75 80 85 90 95 100 110 130 150 10.2 13 8.4 Fix the cylinder by using the OA thread that are provided with the cylinder tube.
load m [kg] Work load m [kg] 300 0 50 100 150 200 250 300 350 600 Mey 250 500 Horizontal Vertical 200 400 m L3 [mm] L3 [mm] L3 [mm] 150 300 L3 100 200 50 100 0 0 Yawing Pitching Yawing Rolling 0 0.2 0.4 0.6 0.8 1 0 1 2 3 4 5 0 0.5 1 1.5 2 2.5 3 Work load m [kg] Work load m [kg] Work load m [kg] 300 600 0 50 100 150 200 250 300 350 250 500 L4 200 400 L4 [mm] L4 [mm] L4 [mm] 150 300 100 200
Note 2) Except double (latching). 5 6 Low wattage type Y (2) Note) 200/220 VAC models are applicable to the F and L kits.
The upper limit for the actual time of the arc part is as follows: At acceleration: 20 STA , At deceleration: 20 STB (Example) Settings of STA = 20, STB = 5000 and STC = 200 limit the actual arc part times as follows: 20 20 Since =100[ms]<200[ms], At acceleration: 100 [ms] the time is limited to 100[ms]. 20 5000 Since =400[ms]>200[ms], At deceleration: 200 [ms] the time is as-is.
When determining particle generation grades, the 95% upper confidence limit of the average particle concentration (average value), when each specimen is operated at a specified number of cycles Note 2) is considered. The plots in the graphs indicate the 95% upper confidence limit of the average particle concentration of particles with a diameter within the horizontal axis range.