Can be changed to window comparator mode using push-buttons. 908 2-Color Display Digital Flow Switch Series PFM7 Piping Specifications / Mass Part no. 01 02 N01 N02 F01 C4 F02 4 (5/32") one-touch fitting C6 C6 8 (5/16") one-touch fitting N7 1/4" one-touch fitting 6 one-touch fitting Rc 1/4 NPT 1/8 NPT 1/4 Rc 1/8 Port size G1/8 G1/4 Straight Without orifice: 95 g Bottom Without orifice: 105
Piping port ZSM 02: Rc1/4 N02: NPT1/4 F02: G1/4 (ISO1179) PF2 IF 2 1 Data 4 3 With bracket Connector Pin Assignments 44.5 9 34 Output -43 MPa 1 Brown DC (+) 2 White OUT1 (PNP) 3 Blue DC () OUT1 4 Black OUT1 (NPN) U P DOWN SET Output -65 14.5 90 1 Brown DC (+) 2 White NC 3 Blue DC () 26.5 4 Black OUT1 (PNP) 18.3 6 (28.7) 35 46 (38.2) 60 24 Piping port 02: Rc1/4 N02: NPT1/4 F02: G1/4 (ISO1179
1 Brown DC (+) 46 60 (31) (38.7) 3.5 35 OUT2 (NPN or PNP) 2 White 3 Blue DC () 24 OUT1 (NPN or PNP) 4 Black Piping port 02: Rc1/4 N02: NPT1/4 F02: G1/4 (ISO1179) 6 726 Series ISE70/75/75H Specific Product Precautions 1 Be sure to read before handling.
(Note 1) I/O 1 P15R P15R P15R P15R P15R P15R 2 I -/VC VC VC/VLA VLA VLA/3 LG LG LG LG LG LG 4 O LA LA LA LA LA LA 5 O LAR LAR LAR LAR LAR LAR 6 O LB LB LB LB LB LB 7 O LBR LBR LBR LBR LBR LBR 8 O LZ LZ LZ LZ LZ LZ 9 O LZR LZR LZR LZR LZR LZR 10 I PP PP/(Note 6) (Note 6) (Note 6) -/PP PD43/PD44 11 I PG PG/-/PG 12 OPC OPC/-/OPC 13 O (Note 4) (Note 4) (Note 4) (Note 4) (Note 4) (Note 4) PD47
Mass: 1.0 [kg] (2.21 [lb]) Approx. 40 Terminal signal layout For 3-phase 200 to 230VAC and 1-phase 230VAC For 1-phase 100 to 120VAC PE terminal 6 L1 L1 L2 2-M5 screw L2 L3 CNP1 CNP1 Screw size: M4 Tightening torque: 1.2 [N m] (10.6 [lb in]) N N P1 P1 P2 P2 P P C C CNP2 CNP2 D D L11 L11 Mounting hole process drawing L21 L21 Mounting screw Screw size: M5 Tightening torque: 3.24[N m] (28.7[lb
For 3-phase or 1-phase 200 to 230VAC 40 For 1-phase 100 to 120VAC PE terminal 6 L1 L1 L2 L2 L3 CNP1 CNP1 2-M5 screw Screw size: M4 Tightening torque: 1.2 [N m] (10.6 [lb in]) N N P1 P1 P2 P2 P P C C CNP2 CNP2 D D L11 L11 L21 L21 U U Mounting hole process drawing CNP3 CNP3 V V W W Mounting screw Screw size: M5 Tightening torque: 3.24[N m] (28.7[lb in]) 11 2 11.
Mass: 0.8 [kg] (1.76 [lb]) Mounting screw Screw size: M5 Tightening torque: 3.24 [N m] (28.7 [lb in]) Terminal signal layout For 3-phase or 1-phase 200 to 230VAC For 1-phase 100 to 120VAC PE terminal Approx. 40 L1 L1 6 L2 L2 L3 CNP1 CNP1 Screw size: M4 Tightening torque: N N 2-M5 screw 1.2 [N m] (10.6 [lb in]) P1 P1 P2 P2 P P C C CNP2 CNP2 D D L11 L11 L21 L21 U U CNP3 CNP3 V V W W Mounting
. 20 LD LC Regenerative option Variable dimensions Mass LA LB LC LD [kg] [lb] LEC-MR-RB-032 30 15 119 99 0.5 1.1 LEC-MR-RB-12 40 15 169 149 1.1 2.4 11 15 11.
Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1, L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1, L2, L3 L2 L3 L1C Control power supply Connect the control power supply.
For 3-phase or 1-phase 200 to 230VAC 40 For 1-phase 100 to 120VAC PE terminal 6 L1 L1 L2 2-M5 screw L2 L3 CNP1 CNP1 Screw size: M4 Tightening torque: 1.2 [N m] (10.6 [lb in]) N N P1 P3 P1 Screw size:M4 Tightening torque:1.2[Nm] P4 P2 P2 P P C C CNP2 CNP2 D D L11 L11 L21 L21 Mounting hole process drawing Mounting hole process drawing Mounting screw Screw size: M5 Tightening torque: 3.24[N
(a) Delta connection For the 3-phase (L1/L2/L3) delta connection, an instantaneous power failure occurs in the voltage between a pair of lines (e.g. between L1 and L2) among voltages between three pairs of lines (between L1 and L2, L2 and L3, or L3 and L1).
OUTLINE DRAWINGS (2) LECSA-S4 [Unit: mm] Mass: 0.7[kg] (1.54[lb]) Terminal layout CNP1 CNP2 24V 0V L1 L2 P C U V W Mounting screw Screw size: M5 Tightening torque: 3.24[N m] (28.7[lb in]) 9 3 9.
) L1 = 50 [mm] L2 = 40 [mm] m L2 L1 Item Load factor an Note 1.
F02 C01 A2 B2 2 49.6 (N02: 50.1) M5 x 0.8 thread depth 5 30 26.2 20 8.45 20 30 Width across flats 17 10 2 x M3 x 0.5 thread depth 4 Piping port 02: R1/4 N02: NPT1/4 3.5 8.8 Atmospheric vent port 2.6 14.7 25.1 46.2 2 12.4 26.2 10.1 8.45 22 14.5 Piping port Rc1/8 Piping port G1/4 -F02: G1/4 -C01: Rc1/8 27.7 21.7 8.45 8.45 Piping port TSJ1/4 Piping port URJ1/4 -B2: TSJ1/4 -A2: URJ1/4 736 Series
11 One-touch Screw-in One-touch N01 N02 N02 Screw-in Screw-in Screw-in ZH15DA08 10 10 One-touch One-touch One-touch 08 03 10 One-touch Screw-in One-touch 02 03 03 Screw-in Screw-in Screw-in ZH15DA09 11 11 One-touch One-touch One-touch 09 N03 11 One-touch Screw-in One-touch N02 N03 N03 Screw-in Screw-in Screw-in ZH18DA10 12 12 One-touch One-touch One-touch 10 03 12 One-touch
: 48.9 Atmospheric vent port 02 4 x 2.6 Depth 7 or less 20 30 25 8.5 11 R1/4 M5 x 0.8 Thread depth 5 4.2 N02 30 20 NPT1/4 17 Piping port 02: R1/4 N02: NPT1/4 2.5 If there is a possibility that the atmospheric vent port of the switch will be exposed to water or dust, insert a tube into the atmospheric vent port and route the other end of the tube to a safe place away from water or dust. *
: 48.9 Atmospheric vent port 02 4 x 2.6 Depth 7 or less 20 30 25 8.5 11 R1/4 M5 x 0.8 Thread depth 5 4.2 N02 30 20 NPT1/4 17 Piping port 02: R1/4 N02: NPT1/4 2.5 If there is a possibility that the atmospheric vent port of the switch will be exposed to water or dust, insert a tube into the atmospheric vent port and route the other end of the tube to a safe place away from water or dust. *
LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 Main circuit power supply L2 L2 L3 L3 N P1 P2 N Connect between P1 and P2. (Connected at time of shipping.)
LECSB1/LECSC1/LECSS1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2/LECSC2/LECSS2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 Main circuit power supply L2 L2 L3 L3 N P1 P2 N Connect between P1 and P2. (Connected at time of shipping.)
LECSB1: Single phase 100 to 120 VAC, 50/60 Hz Connection terminal: L1,L2 LECSB2: Single phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2 Three phase 200 to 230 VAC, 50/60 Hz Connection terminal: L1,L2,L3 Do not connect. L1 L2 L2 Main circuit power supply L3 L3 Regeneration converter N P1 P2 N DC reactor Connect between P1 and P2. (Connected at time of shipping.)